| Location: | Texas |
|---|---|
| Posted: | Mar 25, 2026 |
| Due: | Apr 22, 2026 |
| Agency: | Guadalupe-Blanco River Authority (GBRA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Construction of a water control structure to manage flows between Green Lake and GBRA’s diversion canal. The superstructure is comprised of NZ26 sheetpile and related connections and reinforcement. The structure includes an inlet overflow weir to allow overflow from the lake above elevation 2.0 ft (datum) and discharge through two 48-in reinforced concrete pipes to the adjacent GBRA diversion canal. Other work includes removal of the old structure remains, inlet and outlet side rock rip rap pads, an upgraded embankment access road extending over the top of the structure, and contractor’s site access development.

With GovernmentContracts, you can:
...LOCAL LET MAINTENANCE CONTRACT, TOM GREEN CO, CRACK SEAL Follow Solicitation Solicitation ID: ...
State Government of Texas
Bid Due: 10/01/2026
...STATE LET CONSTRUCTION CONTRACT, TOM GREEN CO, HIGHWAY IMPROVEMENT Follow Solicitation...://www.txdot.gov/business/letting-bids/letting.html Solicitation Description: ...
State Government of Texas
Bid Due: 10/07/2026
...PATHOGEN TESTING show Open for Bidding Default Bid Type Todie Green Senior Buyer ...
The Trinity River Authority of Texas
Bid Due: 9/23/2026
...Parts show Open for Bidding Bid Todie Green Senior Buyer greent@trinityra.org 9/16/2026 5:00 ...
The Trinity River Authority of Texas
Bid Due: 9/23/2026