| Location: | Texas |
|---|---|
| Posted: | Mar 25, 2026 |
| Due: | Apr 22, 2026 |
| Agency: | Guadalupe-Blanco River Authority (GBRA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Construction of a water control structure to manage flows between Green Lake and GBRA’s diversion canal. The superstructure is comprised of NZ26 sheetpile and related connections and reinforcement. The structure includes an inlet overflow weir to allow overflow from the lake above elevation 2.0 ft (datum) and discharge through two 48-in reinforced concrete pipes to the adjacent GBRA diversion canal. Other work includes removal of the old structure remains, inlet and outlet side rock rip rap pads, an upgraded embankment access road extending over the top of the structure, and contractor’s site access development.

With GovernmentContracts, you can:
...will be held at the Public Utilities Meeting and Training Facility located at ...
County of Brazos
Bid Due: 6/26/2026
...gallons per day (MGD) Mary's Creek Water Reclamation Facility (MCWRF) located at 11091 ...
City of Fort Worth
Bid Due: 6/25/2026
...and tire and debris removal. Additional details are available in the attached notice. ...
DEPT OF DEFENSE
Bid Due: 6/17/2026
...will be held at the Public Utilities Meeting and Training Facility located at ...
City of College Station
Bid Due: 6/26/2026