| Location: | Texas |
|---|---|
| Posted: | Mar 25, 2026 |
| Due: | Apr 22, 2026 |
| Agency: | Guadalupe-Blanco River Authority (GBRA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Construction of a water control structure to manage flows between Green Lake and GBRA’s diversion canal. The superstructure is comprised of NZ26 sheetpile and related connections and reinforcement. The structure includes an inlet overflow weir to allow overflow from the lake above elevation 2.0 ft (datum) and discharge through two 48-in reinforced concrete pipes to the adjacent GBRA diversion canal. Other work includes removal of the old structure remains, inlet and outlet side rock rip rap pads, an upgraded embankment access road extending over the top of the structure, and contractor’s site access development.

With GovernmentContracts, you can:
...Equipment, Accessories And Supplies (Not Otherwise Classified); 89003-Back Flow Preventers For Water/Sewer...-Plumbing Fixtures ...
State Government of Texas
Bid Due: 10/21/2026
...Salmon Waste Water Treatment Plant - Miscellaneous Improvements CIP # WW2103C Bid #26-048 ...
City of League City
Bid Due: 9/23/2026
...Salmon Waste Water Treatment Plant - Miscellaneous Improvements CIP # WW2103C Bid #26-048 ...
City of League City
Bid Due: 10/01/2026
.../2026 Due Date: 10/15/2026 Follow KYLE WWTP EXPANSION PHASE 2, FULL WORKS PACKAGE ...
City of Kyle
Bid Due: 10/15/2026