Client Confidential
Columbia County School District
RFQ/P #HC-04-28-26A
Construction Management Services At-Risk for Greenbrier High School
Addendum 2
April 20, 2026
Response to Proposer Questions
The following are responses to Proposer submitted questions:
Question 1:
The Proposal Form in the RFQ/P states that the Fee is a percentage of the Cost of the Work. Please confirm that
proposals should calculate the Fee, General Conditions/Staffing, Bonds, Sub-Guards/Self-Insurance, and
General Liability Insurance as percentages of the owner's budget of $82 million.
Answer 1:
Yes. The fee percentages are to be submitted as a percentage of the owner’s preliminary budget of $82 million.
The fee percentage is a basis of comparison. At GMP the owner will pay the actual cost, not to exceed listed
percentages.
Question 2:
The Proposal Form asks for percentages for Bonds, Sub-Guard/Self-Insurance, General Liability Insurance, and
Builder’s Risk Insurance. However, the Fee/General Conditions Matrix states that these items are reimbursed at
CMR's actual cost. Please clarify if reimbursement is based on percentage or actual cost. We suggest requiring
a percentage for Bonds, Sub-Guard/Self-Insurance, and General Liability Insurance, while reimbursing Builder’s
Risk at actual cost.
Answer 2:
See answer 1.
Question 3:
Please confirm that the costs for Bonds and insurances are to be provided as separate percentages and not
included in the percentage for General Conditions / Staffing.
Answer 3:
Correct.
1|Page
Client Confidential
Question 4:
The Fee / General Conditions Matrix indicates that “local” travel is reimbursable under General Conditions,
whereas “out of town” travel should be considered in the CMR’s fee. Please define “local” and “out of town” so
that each proposing CMR considers the same criteria when preparing their proposal.
Answer 4:
All travel is to be included in the General Conditions. See attached revised Exhibit C – Fee/General Conditions
Matrix.
Question 5:
The Project Approach section (RFQ/P paragraph 5.C.1) asks for a sample project schedule to meet the
substantial completion date. Since the RFQ/P does not specify this date, could you please clarify the desired
substantial completion date so we can accurately plan phasing, general conditions, and provide a realistic
schedule?
Answer 5:
The project is currently assumed to take up to 36 months to reach substantial completion from the date of Board
approval of the GMP amendment.
Question 6:
Is there a geotech report?
Answer 6:
Geotechnical engineering is currently in progress. A report will not be available during this RFP.
Question 7:
Can we have a copy of the schematic design drawings to better understand the scope?
Answer 7:
Exhibit D – Concept Plan has been made available in the RFQ/P. Schematic design is in progress and will not be
available during this RFP.
2|Page
Columbia County School District
Construction Management Services
HC-04-28-26A
Exhibit C
Revised April 20, 2026
Addendum 2
Fee/General Conditions Matrix
Category
Fee
Home Office Expenses
Project Executive
X
Home Office Overheads
X
Business Development
X
Training & Development
X
Profit
X
Preconstruction Services
Project Manager/Staff
Estimating
Scheduling
Value Engineering
Constructability Review
Construction Phase Staff
Project Manager
Superintendent(s)
Project Engineer
Safety Manager
Estimators
Schedulers
Consultants
Travel (local)
Administration
Accounting
X
QC/OA
X
Risk Management
X
Legal
X
Human Resources
X
Labor Relations
X
Bonds
Sub Guards / Self Insurance
General Liability/Builders Risk Insurance
Jobsite Operations
Trailers/Job Office
Temporary Fence
Temporary Parking
Temporary Road
Security
Telephones
Cell Phones
Radios
General
Conditions
Direct Costs
Pre Con
Fee
Comments
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Reimburse actual cost
Reimburse actual cost
Reimburse actual cost
Columbia County School District
Construction Management Services
HC-04-28-26A
Copiers/Fax/Office Equip
Office Supplies
Safety Supplies, Misc Tools & Equip
Vehicles, Fuel, Maintenance
Travel (out of town)
Document Reproduction
Postage & Couriers (job)
Postage & Couriers (admin)
Site Signage
Drug Testing
Temporary Toilets
Water, Ice, Cups
Dumpsters
Licenses
Permits
Materials Layout
Field Engineering and Equipment
Surveying & Layout
Temporary Utilities
Interim and Daily Cleaning
Final Cleaning
Fire Protection
Mobilization (prime)
Demobilization (prime)
Exhibit C
Revised April 20, 2026
Addendum 2
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Will be shown as line item
Allowance
Note:
Any Additions, deviations, exceptions, etc. from the above categories base on project specific conditions and scope of work to be included in your proposal and
reviewed and approved by Columbia County School District.