| Location: | Vermont |
|---|---|
| Posted: | Oct 16, 2024 |
| Due: | Nov 8, 2024 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Washington Keywords: Construction (Non Building), Bridge Repair and Construction, Paving Contractor, Road Construction Bid Description: THE BRIDGE IS LOCATED IN THE TOWN OF WATERBURY ON TOWN HIGHWAY 2 (STOWE STREET), APPROXIMATELY 150 FEET SOUTH OF THE INTERSECTION OF STOWE STREET, ROUTE 100 AND BLUSH HILL ROAD REPLACEMENT OF THE EXISTING BRIDGE WITH A PRECAST CONCRETE FRAME STRUCTURE ALONG WITH RELATED ROADWAY, SIDEWALK, CHANNEL WORK AND SEWER RELOCATION ENGINEERS CATEGORY E
|
||||||||||||||||||||

With GovernmentContracts, you can:
...INCLUDES THE REMOVAL OF A CONCRETE BOX CULVERT, RELOCATION OF CHANNEL, AND INSTALLATION ...
State Government of Vermont
Bid Due: 6/29/2026
..., and installation of a precast concrete box culvert with associated roadway and ...
State of Vermont - Agency of Transportation
Bid Due: 6/19/2026
...of a precast concrete box culvert with associated roadway and channel work. CONTRACT ...
State of Vermont - Agency of Transportation
Bid Due: 6/19/2026