| Location: | District of Columbia |
|---|---|
| Posted: | Feb 3, 2026 |
| Due: | Feb 19, 2026 |
| Agency: | Metropolitan Washington Airports Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB-25-26326 |
| Publication URL: | To access bid details, please log in. |
IFB-25-26326: Concrete Column Repairs, IAD
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision for the rehabilitation of Main Terminal columns at Washington Dulles International Airport (IAD). Work includes, but not limited to: removal of deteriorated concrete and subsequent replacement and patching; demolition and removal of selected portions of structure; maintaining traffic and protecting workers; fabricating, refurbishing, furnishing, and erecting traffic sign; furnishing and installing road-edge, barrier, flexible post, or guardrail delineators; pavement marking.
Solicitation Issue Date: January 13, 2026
Due Date for Submissions: February 19, 2026
Amendments Issued: None
SLBE Requirement: 100%
Additional Information - See in MWAA Contract Lifecycle Management System

With GovernmentContracts, you can:
Follow Phase 2 Construct Arabian Leopard Exhibit at the National Zoological Park Active
SMITHSONIAN INSTITUTION
Bid Due: 11/20/2026
Follow Creative Exhibit Design Services Active Contract Opportunity Notice ID 030ADV27R0010 Related Notice
LIBRARY OF CONGRESS
Bid Due: 11/16/2026
RFP-26-25454: CMAR Services for Terminal 1 and South Area Redevelopment, DCA UPDATED Description:
Metropolitan Washington Airports Authority
Bid Due: 11/23/2026
RFI: Automated People Mover (APM) Extension and Center Spine, IAD (Package T) NEW
Metropolitan Washington Airports Authority
Bid Due: 11/23/2026