| Location: | District of Columbia |
|---|---|
| Posted: | Feb 3, 2026 |
| Due: | Feb 19, 2026 |
| Agency: | Metropolitan Washington Airports Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB-25-26326 |
| Publication URL: | To access bid details, please log in. |
IFB-25-26326: Concrete Column Repairs, IAD
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision for the rehabilitation of Main Terminal columns at Washington Dulles International Airport (IAD). Work includes, but not limited to: removal of deteriorated concrete and subsequent replacement and patching; demolition and removal of selected portions of structure; maintaining traffic and protecting workers; fabricating, refurbishing, furnishing, and erecting traffic sign; furnishing and installing road-edge, barrier, flexible post, or guardrail delineators; pavement marking.
Solicitation Issue Date: January 13, 2026
Due Date for Submissions: February 19, 2026
Amendments Issued: None
SLBE Requirement: 100%
Additional Information - See in MWAA Contract Lifecycle Management System

With GovernmentContracts, you can:
...ceiling height of 8'6" throughout; Minimum column spacing of 24' by 24' or ...
GENERAL SERVICES ADMINISTRATION
Bid Due: 3/27/2027
...Subleases are not acceptable Space should allow for an efficient layout and office ...
GENERAL SERVICES ADMINISTRATION
Bid Due: 9/28/2026
.... Offered base building must provide: Minimum finished ceiling height of 8'6" throughout; ...
GENERAL SERVICES ADMINISTRATION
Bid Due: 3/27/2027