Plate Settler Thickening Equipment RFP

Location: California
Posted: Oct 13, 2026
Due: Nov 6, 2026
Agency: Tuolumne Utilities District
Type of Government: State & Local
Category:
  • 78 - Recreational and Athletic Equipment
Publication URL: To access bid details, please log in.
Plate Settler Thickening Equipment RFP

Project Description
Tuolumne Utilities District (TUD) invites qualified System Suppliers to submit proposals for furnishing an inclined plate settler thickening system for the Sierra Pines Regional Water Treatment Facility Project. Proposers shall submit one complete proposal addressing two alternatives: Alternative A for a 140-gpm system and Alternative B for a 235-gpm system. Each alternative shall constitute a complete and operable system meeting the applicable requirements of the Contract Documents.

Proposal Due Date:
November 6, 2026, at 2:00 PM local time.

Proposal Submission:
Proposals must be emailed or submitted in accordance with Section 2.4 of the Contract Documents.

The submission email is:
gdemattei@tudwater.com
cc: ejohnson@tudwater.com

Project Documents:
Contract Documents – Plate Settler RFP

For information concerning the proposed work, contact: Mr. Gaddiel DeMattei, Senior Engineer, at (209) 532-5536, extension 519 or gdemattei@tudwater.com.

Attachment Preview

Board of Directors
Jeff Hollis
Glen Jacobs
Jeff Kerns
Carol Reel
Ron W. Ringen
Sierra Pines Regional Water
Treatment Facility
Request for Proposals
Plate Settler Thickening Equipment
October 2026
Tuolumne Utilities District |18885 Nugget Blvd., Sonora, CA 95370 | Phone: (209) 532-5536 | www.tudwater.com

Tuolumne Utilities District (TUD) invites qualified System Suppliers to submit proposals for furnishing an
1inc.liRneed qpluatee ssett tfloerr t hPicrkeonpinog ssyastlesm for the Sierra Pines Regional Water Treatment Facility Project.
Proposers shall submit one complete proposal addressing two alternatives: Alternative A for a 140-gpm
system and Alternative B for a 235-gpm system. Each alternative shall constitute a complete and
operable system meeting the applicable requirements of the Contract Documents.
The work generally consists of the design, manufacturing, factory testing, delivery, startup assistance,
operator training, and warranty support for filter process wastewater thickening equipment as specified
in the Contract Documents.
TUD intends to select and award one of the two alternatives. TUD is not obligated to select the lowest-
capacity alternative, the lowest-priced alternative, or to purchase both alternatives. Each alternative will
be evaluated as a complete proposal in accordance with the evaluation criteria stated herein.
Proposals will be received until November 6, 2026, at 2:00 PM (Local Time). Proposals must be emailed
or submitted in accordance with Section 2.4. The submission email is:
gdemattei@tudwater.com
cc ejohnson@tudwater.com
Contract Documents may be obtained from TUD upon request. Proposers are solely responsible for
reviewing all Contract Documents and addenda before submitting a proposal. The TUOLUMNE UTILITIES
DISTRICT PROCUREMENT TERMS AND CONDITIONS for the Sierra Pines regional Water Treatment
Facility Project are attached to this Request for Proposal (RFP) and are part of the contract documents.
Award, if made, will be made to the proposer whose proposal is determined by TUD to provide the best
value to the District based on the evaluation criteria identified in the Instructions to Proposers. TUD
reserves the right to reject any or all proposals, waive informalities and irregularities, and accept the
proposal deemed to be in the best interest of the District.
Questions regarding this solicitation shall be submitted in writing to the District's designated
representative identified in the Instructions to Proposers. Such inquiries must be received by 4:00 PM
seven calendar days prior to the due date.
TUOLUMNE UTILITIES DISTRICT
Sign: ______________________________
Gaddiel DeMattei, P.E., Senior Engineer
gdemattei@tudwater.com
209-532-5536
Date: _1_0_/_7_/_2_0_2_6___________________

TUOLUMNE UTILITIES DISTRICT
PROCUREMENT TERMS AND CONDITIONS
for the
Sierra Pines Regional Water Treatment Facility Project
(To be furnished with any solicitations for materials, equipment, or services and to be
attached to any task order or purchase order as a condition of purchase.)
Note: The requirements listed below are in addition to any construction contracts specifically issued by the District.
These requirements also flow down and must be included in any subcontracts.
The contractor, consultant, or supplier (vendor), warrants compliance with the following terms and conditions, as applicable:
1. This project is not subject to the Build America, Buy America (BABA) Act. Tuolumne Utilities District has obtained a BABA waiver
from USEPA on file with the State Water Board for this project.
2. This project is subject to American Iron and Steel (AIS) requirements. All "iron and steel products" used in the Project were or
will be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or
steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps
and restraints, valves, structural steel, reinforced precast concrete, and other construction materials. "Steel" means an alloy that
includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements.
3. The contractor acknowledges and agrees to the terms and conditions provided in the Contract Provisions for Davis-Bacon
and Related Acts US EPA:
https://www.epa.gov/grants/contract-provisions-davis-bacon-and-related-acts
For reference, see also: https://www.waterboards.ca.gov/water_issues/programs/grants_loans/srf/davisbacon.html
4. The contractor agrees to be bound by all applicable provisions of State Labor Code regarding prevailing wages.
5. The contractor, consultant, or supplier shall verify eligibility of subcontractors, subconsultants, and suppliers and ensure they are not
suspended or debarred from participating in federally assisted transactions as defined in Parts 180 and 1532 of 2 CFR and comply
with Subpart C of Part 180 of 2 CFR, as supplemented by Subpart C of Part 1532 of 2 CFR.
6. Contractors and suppliers shall comply with the Disadvantaged Business Enterprises (DBE) requirements in 40 CFR part 33, subparts
C and D, and require its contractors and subcontractors on the Project to comply with 40 CFR 33.301 requiring the use of good faith
efforts to utilize DBE's whenever procuring construction, equipment, services, and supplies per USEPA's Program for Utilization of
Small, Minority and Women's Business Enterprises.
https://www.waterboards.ca.gov/water_issues/programs/grants_loans/srf/docs/policy0513/dbe_compliance_guidelines_instructions.
pdf
7. The contractor, consultant, or supplier must not contract with any individual or organization on the State Water Board's List of
Disqualified Businesses and Persons that is identified as debarred or suspended or otherwise excluded from or ineligible for
participation in any work overseen, directed, funded, or administered by the State Water Board program. The State Water
Board's List of Disqualified Businesses and Persons is located at:
https://www.waterboards.ca.gov/water_issues/programs/enforcement/fwa/dbp.html
8. Procurement prohibitions apply under Section 306 of the Clean Air Act and Section 508 of the Clean Water Act, including Executive
Order 11738, Administration of the Clean Air Act and the Federal Water Pollution Control Act with Respect to Federal Contracts,
Grants, or Loans; 42 USC 7606; 33 USC 1368. Contractors, consultants, and suppliers may not procure goods, services, or
materials from suppliers excluded under the federal System for Award Management:
https://sam.gov/content/exclusions
9. The contractor, consultant, or supplier warrants that it will not engage in severe forms of trafficking in persons, procure a commercial
sex act during the term of this Agreement, or use forced labor in the performance of this Agreement.
10. The contractor, consultant, or supplier will not discriminate against any employee or applicant for employment because of race, creed,
color, or national origin. The contractor, consultant, or supplier will take affirmative action to ensure that applicants are employed, and
that employees are treated during employment, without regard to their race, creed, color, or national origin. Such action shall include,
but not be limited to the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or
termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor,
consultant, or supplier agrees to post in conspicuous places, available to employees and applicants for employment, notices to be

provided by the contracting officer setting forth the provisions of this nondiscrimination clause. The following federal non-discrimination
requirements apply:
a. Title VI of the Civil Rights Act of 1964, which prohibits discrimination based on race, color, and national
origin, including limited English proficiency (LEP).
b. Section 504 of the Rehabilitation Act of 1973, which prohibits discrimination against persons with
disabilities.
c. The Age Discrimination Act of 1975, which prohibits age discrimination.
d. Section 13 of the Federal Water Pollution Control Act Amendments of 1972, which prohibits
discrimination on the basis of sex.
e. 40 CFR Part 7, as it relates to the foregoing
11. The contractor, consultant, or supplier will, in all solicitations or advertisements for employees placed by or on behalf of
the contractor, state that all qualified applicants will receive consideration for employment without regard to race, creed,
color, or national origin.
12. The contractor will send to each labor union or representative of workers with which they have a collective bargaining
agreement or other contract or understanding, a notice, to be provided by the agency contracting officer, advising the
labor union or workers' representative of the contractor's commitments under Section 202 of Executive Order No. 11246
of September 24, 1965, and shall post copies of the notice in conspicuous places available to employees and applicants
for employment.
13. The contractor will comply with all provisions of Executive Order No. 11246 of Sept. 24, 1965, and of the rules, regulations, and
relevant orders of the Secretary of Labor.
14. The contractor will furnish all information and reports required by Executive Order No. 11246 of September 24, 1965,
and by the rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his
books, records, and accounts by the contracting agency and the Secretary of Labor for purposes of investigation to
ascertain compliance with such rules, regulations, and orders.
15. In the event of the contractor's, consultant's, or supplier's noncompliance with the nondiscrimination clauses of this
contract or with any of such rules, regulations, or orders, this contract may be cancelled, terminated or suspended in
whole or in part and the contractor, consultant, or supplier may be declared ineligible for further Government contracts
in accordance with procedures authorized in Executive Order No. 11246 of Sept 24, 1965, and such other sanctions
may be imposed and remedies invoked as provided in Executive Order No. 11246 of September 24, 1965, or by rule,
regulation, or order of the Secretary of Labor, or as otherwise provided by law.
16. The contractor, consultant, or supplier will include sections 10-16 of this document in every subcontract or purchase order
unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order
No. 11246 of Sept. 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor,
consultant, or supplier will take such action with respect to any subcontract or purchase order as the contracting agency may
direct as a means of enforcing such provisions including sanctions for noncompliance: Provided, however, That in the event
the contractor, consultant, or supplier becomes involved in, or is threatened with, litigation with a subcontractor or supplier as
a result of such direction by the contracting agency, the contractor may request the United States to enter into such litigation
to protect the interests of the United States.
17. The contractor, consultant, or supplier must maintain separate books, records and other material relative to the Project for a
minimum of thirty-six (36) years after Completion of Construction. The contractor, consultant, and supplier must require that such
books, records, and other material are subject at all reasonable times (at a minimum during normal business hours) to inspection,
copying, and audit by the State Water Board, the California State Auditor, the Bureau of State Audits, the USEPA, the USEPA's
Office of Inspector General, the Internal Revenue Service, the Governor, or any authorized representatives of the
aforementioned. The contractor, consultant, or supplier must allow interviews during normal business hours of any employees
who might reasonably have information related to such records.

2. Instructions to Proposers
Tuolumne Utilities District (TUD) is soliciting proposals for furnishing a packaged inclined plate settler
2.1 General
and associated chemical mixing equipment system. Proposers shall submit two complete proposal
alternatives:
Alternative A: Complete system with a design flow of 140 gpm.
Alternative B: Complete system with a design flow of 235 gpm.
Each alternative shall include all equipment, chemical mixing systems, accessories, documentation,
factory testing, startup assistance, operator training, and warranty services necessary to provide a
complete and operable system.
The Sierra Pines Regional Water Treatment Facility (SPRWTF) is being constructed to provide potable
2.2 Project overview
water to the service area located in the unincorporated areas of Tuolumne County. The ultimate
buildout capacity of the facility is planned to occur in phases. The initial facility (Phase 1) will provide an
installed treatment capacity of approximately 3 million gallons per day (MGD). Future expansions are
anticipated to increase the installed treatment capacity to approximately 4 MGD (Phase 2) and 5 MGD
(Phase 3).
The District is evaluating whether to furnish the plate settler initially for the Phase 1 operating condition
or to furnish the larger system anticipated for the ultimate facility condition. The two proposal
alternatives will allow the District to compare the cost, footprint, operating characteristics, maintenance
requirements, and lifecycle implications of the two capacities.
The plate settler system procured under this Contract shall support the phased development of the
2.3 Proposal Alternatives and Design Capacities
treatment facility. The system shall be designed such that it can accommodate both Phase 1 and Phase 3
as shown in the table below.
Alternative A Alternative B
Associated Plant Capacity (MGD) 3 5
Number of 1 MGD Filter Units 3 5
Design Flow Rate (gpm) 140 235
Alternative A shall be designed to treat 140 gpm, while Alternative B shall be designed to treat 235 gpm.
The District estimates that the plate settler will operate intermittently for an average of approximately
16 hours per day. Each system shall be capable of fully automatic intermittent operation in accordance
with the requirements of Section 2.5. The District estimates that a minimum flow rate of 94 gpm for
Alternative A, and 156 gpm for Alternative B would be required if the plate settler were to run 24 hours

a day and 7 days a week. However, the Design Flow Rates were selected to allow operational flexibility.
Proposers are encouraged to identify any features, controls, or operating modes that facilitate efficient
low-flow operation.
Each alternative shall include a complete plate settler vessel, plate packs or modules, chemical-
conditioning and mixing equipment, sludge collection and withdrawal equipment, controls,
instrumentation, structural supports, access provisions, and accessories required to satisfy the Contract
Documents.
Proposers may use the same equipment model for both alternatives if that model satisfies all
requirements at both design flows. If the same model is proposed, the Proposer shall clearly identify any
differences in equipment, configuration, operating settings, performance, power consumption, chemical
consumption, or price between the alternatives.
The District intends to award only one alternative. The District reserves the right to select either
alternative, or none at all, based on the evaluation criteria.
Proposals shall be submitted electronically as one complete, searchable (OCR compatible) PDF file by
2.4 Proposal Submission and Organization
email to the District's designated representative. A Proposer may submit its Proposal through an
internet file-sharing service that does not require the District to purchase software, establish a paid
account, or request access.
The Proposal must be received before the date and time identified in the Request for Proposals. Late
Proposals will not be considered. The Proposer is solely responsible for verifying successful delivery. If
the District is unable to open, download, or access the complete Proposal, the Proposal may be deemed
nonresponsive. Shared links shall remain active and accessible for at least 30 days following the Proposal
deadline. If submitted by email, the Proposer is encouraged to request a delivery receipt.
Both proposal alternatives shall be included in the same Proposal PDF. Information applicable to both
alternatives may be presented once, provided the Proposer clearly identifies that the information
applies without modification to both alternatives. Information that differs between alternatives shall be
presented in parallel tables or clearly separated subsections to facilitate comparison.
Proposals shall be organized in the order listed below. Each numbered part shall begin on a new page
and shall be identified by a clearly labeled PDF bookmark.
1. Cover Letter, Optional
A brief transmittal letter identifying the Proposer, the proposed alternatives, and the individual
authorized to submit the Proposal.

2. Executive Summary and Proposed Approach
Provide a concise description, not exceeding three pages, including:
* Proposed treatment process and operating approach.
* Major equipment and systems included.
* Chemical-conditioning and mixing approach.
* Automatic sludge-collection and withdrawal approach.
* Intermittent operating strategy.
* Principal differences between Alternative A and Alternative B.
3. Completed Proposal Form
Complete and submit the Proposal Form in its entirety and in the order presented, including:
* General Proposer and equipment information.
* Acknowledgement and authorized signature.
* Capital costs for each alternative.
* Flow capabilities for each alternative.
* Annual chemical consumption and cost for each alternative.
* Performance guarantees for each alternative.
* Annual power consumption summary for each alternative.
Use the tables provided in the Proposal Form. Attach additional pages only when necessary to complete
a required table or explain a value entered in the Proposal Form. Clearly identify the Proposal Form item
addressed by each attachment.
4. Equipment Description and Technical Data
Provide the following for each alternative:
* Description of the complete proposed equipment package.
* Itemized equipment and component list.
* Equipment and component data sheets.
* Materials of construction.
* Utility requirements.
* Piping and electrical connection requirements.
* Equipment empty and operating weights.
Generic product information shall be marked to identify the specific model, size, material, accessory,
and option proposed.

5. Dimensional and General Arrangement Drawings
Provide preliminary drawings for each alternative showing:
* Overall equipment dimensions.
* Equipment arrangement and elevations.
* Normal operating water levels.
* Access and maintenance clearances.
* Support points.
* Piping, electrical, and control connection locations.
* Major component-removal requirements.
Common drawings may be used if all differences between the alternatives are clearly identified.
6. Process and Instrumentation Drawings
Provide a preliminary process flow diagram and a preliminary piping and instrumentation diagram for
each alternative. Common drawings may be used if all differences between the alternatives are clearly
identified.
7. Scope of Supply and Scope Boundaries
Provide an itemized scope of supply identifying:
* Equipment and materials furnished by the System Supplier.
* Services furnished by the System Supplier.
* Equipment or materials to be furnished by the District.
* Work to be furnished or performed by others.
* Physical termination points and interface requirements.
* Responsibility for installation, testing, startup, and controls integration at each interface.
An item reasonably necessary for complete operation of the proposed system shall be considered
included unless specifically identified as excluded or furnished by others.
8. Design Assumptions and Supporting Information
Identify all assumptions used to develop (base calculations on operating the unit at its design flow for 12
hours per day):
* Equipment selection and sizing.
* Performance guarantees.
* Chemical selection, dose, consumption, and cost.
* Power consumption.
* Maintenance requirements.
* Equipment dimensions and operating weights.
* Scope and pricing.

Provide preliminary process and hydraulic calculations sufficient to demonstrate the basis of each
proposed alternative.
9. Maintenance Effort
Provide a separate 20-year maintenance schedule for Alternative A and Alternative B. If the
maintenance requirements are identical, the Proposer may submit one schedule and clearly state that it
applies without modification to both alternatives.
For each maintenance activity, identify:
* Maintenance activity.
* Recommended frequency.
* Estimated labor hours per occurrence.
* Estimated parts cost in today's dollars.
* Nearest replacement-parts inventory or service center.
* Whether manufacturer or factory-certified service is required.
* Whether an equipment shutdown is required.
Identify major overhauls, equipment rebuilds, plate-pack replacements, drive-component replacements,
and other significant maintenance anticipated during the 20-year period. Also provide a recommended
on-site spare-parts list and anticipated replacement interval for each item.
10. Warranty Information
Describe the proposed warranty and identify any terms, conditions, limitations, exclusions, or owner
responsibilities. Any difference between the proposed warranty and Section 46 43 00 shall be identified
in the Exceptions, Exclusions, and Deviations section.
11. Controls and SCADA Information
Provide the controls and SCADA information required by Section 40 90 00 for both alternatives,
including:
* PLC and HMI manufacturer, model, and software platform.
* Ethernet-based communications protocol.
* Compatibility with Allen-Bradley CompactLogix and Ignition SCADA.
* Access to process variables, statuses, alarms, commands, and adjustable setpoints.
* Proprietary gateways, drivers, software, or communications interfaces.
* Initial and recurring license, subscription, support, and renewal costs.
* Restrictions on program access, modification, backup, restoration, or hardware replacement.
* Internet, cloud-service, or vendor remote-access requirements.
Clearly identify differences between Alternative A and Alternative B.

12. Proposed Delivery Schedule
Identify anticipated durations for:
* Preparation of post-award submittals.
* District review and resubmittal.
* Equipment fabrication.
* Factory testing.
* Shipment and delivery.
* Installation assistance.
* Startup and commissioning.
* Operator training.
Identify anticipated long-lead components and any actions required by the District to maintain the
proposed schedule.
13. Demonstrated Performance and References
Provide documentation demonstrating that the proposed plate settler technology has successfully
treated filter backwash, plant residuals, or similar water with influent turbidity and solids concentrations
equal to or greater than those specified herein.
Include:
* Relevant pilot test reports, third-party evaluations, startup reports, or operating data.
* At least three installations using the same or substantially similar equipment.
* Documentation demonstrating the ability to achieve clarified water turbidity below 10 NTU
under comparable conditions.
* Owner contact name, telephone number, and email address for each referenced installation.
A reference may support both alternatives if the referenced equipment and operating information are
representative of both proposed alternatives.
Submit at least 3 United States references. References should include at minimum:
* Owner/Agency name.
* Facility name and location.
* Contact person, title, telephone number, and email address.
* Equipment or system provided.
* Treatment capacity and key design parameters.
* Date placed into service.
* Current operational status.
* Description of the application and source water characteristics.
* Scope of services provided by the Proposer.
* Any significant modifications, warranty claims, or operational issues experienced since startup.

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow UPDATE Request for Bids for Food Trucks at Rodeo Beach within Golden

INTERIOR, DEPARTMENT OF THE

Bid Due: 12/31/2026

GFO-26-302 - Food Production Investment Program 2026 Solicitation Type Grant Funding Opportunity Solicitation

California Energy Commission

Bid Due: 12/17/2026

Opportunity ID 224081 Organization City of Los Angeles Department Transportation Stage Open Contact

City of Los Angeles

Bid Due: 12/10/2026

Project ID: Title: 2026 Sewer Rehabilitation Project Addenda: 0 Release Date: 9/17/2026 Due

City of American Canyon

Bid Due: 1/12/2027

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.