| Location: | Washington |
|---|---|
| Posted: | Nov 20, 2025 |
| Due: | Nov 24, 2025 |
| Agency: | City of Spokane |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Date | 11/24/25 1:00pm |
Spokane, WA
This project consists of the construction of approximately 10,000 linear feet of HMA shared use path (12,000 square yards of 3-inch thick HMA and 4-inch thick CSTC), 2700 cubic yards of excavation and embankment, 200 linear feet of storm sewer, 4 drainage structures, 1 20-ft long contractor designed buried structure, 350 linear feet of absorption trench, 400 linear feet of gravity block wall (2.5-4.0 feet tall), 1 pedestrian hybrid beacon system, 100 linear feet of sidewalk, 400 linear feet of cement concrete curb, sundry utility adjustments, and other related miscellaneous items.

With GovernmentContracts, you can:
...Solicitation Close Date: 06/16/26 Title: TCC - Storm Sewer Improvements Ref #:2026-186 G(2-1...) ...
State Government of Washington
Bid Due: 6/16/2026
...Project: BID - TCC - Storm Sewer Improvements - Tacoma Community College Ref. ...
State Government of Washington
Bid Due: 6/16/2026
...linear feet of storm sewer, 67 wheelchair ramps, 2400 linear feet of concrete ...
City of Spokane
Bid Due: 6/08/2026
...of pavement repair excavation including haul, 70 linear feet of storm sewer, 5 ...
City of Spokane
Bid Due: 6/15/2026