| Location: | Minnesota |
|---|---|
| Posted: | Nov 13, 2024 |
| Due: | Nov 22, 2024 |
| Agency: | State Government of Minnesota |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2000016453 |
| Publication URL: | To access bid details, please log in. |
|
Line Number
|
Bid Mandatory
|
Item Description
|
Requested Quantity/UOM
|
Comments and Attachments
|
|
1
|
No
|
Buckthorn Removal Tool Kit for Wannaska (each tool kit will include 5 items) as detailed in attached SAMPLE Contract in section Exhibit C
|
1.0000
EACH
|
|
|
2
|
No
|
Buckthorn Removal Tool Kit for International Falls (each tool kit will include 5 items) as detailed in attached SAMPLE Contract in section Exhibit C
|
1.0000
EACH
|
|
|
3
|
No
|
Buckthorn Removal Tool Kit for Tower (each tool kit will include 5 items) as detailed in attached SAMPLE Contract in section Exhibit C
|
1.0000
EACH
|
|
|
4
|
No
|
Buckthorn Removal Tool Kit for Aitkin (each tool kit will include 5 items) as detailed in attached SAMPLE Contract in section Exhibit C
|
1.0000
EACH
|
|
|
5
|
No
|
Buckthorn Removal Tool Kit for Brainerd (each tool kit will include 5 items) as detailed in attached SAMPLE Contract in section Exhibit C
|
1.0000
EACH
|
|
|
6
|
No
|
Buckthorn Removal Tool Kit for Cambridge (each tool kit will include 5 items) as detailed in attached SAMPLE Contract in section Exhibit C
|
1.0000
EACH
|
|
|
7
|
No
|
Buckthorn Removal Tool Kit for Hutchinson (each tool kit will include 5 items) as detailed in attached SAMPLE Contract in section Exhibit C
|
1.0000
EACH
|
|
|
8
|
No
|
Buckthorn Removal Tool Kit for Grand Rapids (each tool kit will include 5 items) as detailed in attached SAMPLE Contract in section Exhibit C
|
1.0000
EACH
|
|
|
9
|
No
|
Buckthorn Removal Tool Kit for Faribault (each tool kit will include 5 items) as detailed in attached SAMPLE Contract in section Exhibit C
|
1.0000
EACH
|
|

With GovernmentContracts, you can:
...for the demolition and removal of the clock tower structure located on the ...
City of Bloomington
Bid Due: 6/16/2026
...Expansion Drain Tile Lift Station Cooling Tower Pump House Remove existing concrete foundations, ...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 7/02/2026