| Location: | Texas |
|---|---|
| Posted: | Sep 8, 2025 |
| Due: | Sep 18, 2025 |
| Agency: | City of Burleson |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFCSP 2025-003 |
| Publication URL: | To access bid details, please log in. |
Project Description: The major work will consist of the construction of a new pump station with a 14.4 MGD initial firm capacity (16.5 MGD ultimate). The project includes, but is not limited to: ~4,800 SF Pump Station Building, three (3) 5,000 gpm horizontal split case pumps and 400 HP motors, one (1) 2 Million Gallon prestressed concrete ground storage tank, one (1) City of Fort Worth wholesale meter station, yard piping and other site improvements, ~1,200 LF offsite 24-inch water line, electrical system including a 1,500 kW emergency generator and controls, demolition of existing Alsbury Pump Station, and demolition of existing Industrial Park Blvd Pump Station.

With GovernmentContracts, you can:
...frequency drives, a new electrical building with a motor control center (MCC), HVAC ...
City of Dallas
Bid Due: 7/10/2026
...frequency drives, a new electrical building with a motor control center (MCC), HVAC ...
City of Dallas
Bid Due: 7/10/2026
...Project: MOTOR,COUPLING,HIGH SPEED ASSY | 2099308 Ref. #: 2099308 Type: RFQ Status: Open ...
Dallas Area Rapid Transit
Bid Due: 6/19/2026
...Set-Aside (FAR 19.5) Product Service Code: 1265 - FIRE CONTROL TRANSMITTING AND RECEIVING ...
JUSTICE, DEPARTMENT OF
Bid Due: 6/10/2026