| Location: | Colorado |
|---|---|
| Posted: | Aug 14, 2025 |
| Due: | Aug 29, 2025 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 1240LT25R0039 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
SOUTH PARK DISTRICT OFFICE REHAB - FAIRPLAY, COLORADO - PSICC NF and NATIONAL GRASSLANDS
08/14/2025: Amendment 00002 (A0002): See and read the following in association with Amendment 0002: Amendment 0002 (A0002) - read in its entirety as it includes the Summary of Changes with answers to contractor's questions and revsions to supporting solicitation documents. Also included in this Amendment as an attachment is Updated Attach _3 Specifications_08.14.2025. A0002 and the Updated Attachment are located in the Attachments/Links.
07/31/2025: Amendment 0001 (A0001): See and read the following in association with Amendment 0001: Amendment 0001 (A0001) and the Updated Attachments 3 and 4 for updates to the Specifications and Drawings. The Updated Attachments along with A0001 are located in the Attachments/Links.
The project scope of work includes, but is not limited to, the following: Mobilization, quality control, removal and installation of a new standing seam metal roof including underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts, installation of roof, valley, gutter, and downspout ice/snow melt system including electrical circuits; interior and exterior modifications including removal of carpet and installation of carpet tiles, replacing stained and damaged acoustical panels and ceiling tiles, and seal windows, installation of (8) additional communication outlets and associated electrical for telecom.
Optional Item - Install chain link fence, personnel walk thru gate, motorized gate with operator and keypad, and associated electrical and safeties. See the SOW, SOI, Specifications, and Drawings for more details.
Work for this project requires the contractor to be responsible for supplying all labor, materials, scheduling, coordination, equipment, utilities, miscellaneous items, freight, and delivery to complete contract requirements in compliance with approved final drawings, specifications and provisions. See the SOW, SOI, Specifications, and Drawings for more details.
An upcoming amendment will provide answers to questions from vendors and include the site visit's attendee's list.
| Jul 29, 2025 | [Solicitation (Original)] SOUTH PARK DISTRICT OFFICE REHAB |
| Jul 31, 2025 | [Solicitation (Updated)] SOUTH PARK DISTRICT OFFICE REHAB |

With GovernmentContracts, you can:
Engineering - The Eagle County Engineering Department is soliciting proposals from contractors to
Eagle County
Bid Due: 6/26/2026
Description: FY27 PMAA 4291 Bulk Oxygen Department: DNR - Division of Parks &
State Government of Colorado
Bid Due: 6/11/2026
Description: TSC IFB2026000194 Department: Trinidad State Junior College Buyer: Penny Bueno Solicitation Number:
State Government of Colorado
Bid Due: 6/17/2026
Follow Pest Control (Geese Mitigation) Services, Ft Logan National Cemetery Active Contract Opportunity
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/05/2026