| Location: | Texas |
|---|---|
| Posted: | Oct 2, 2025 |
| Due: | Oct 22, 2025 |
| Agency: | City of Waco |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB 2025-067 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project generally consists of the replacement for the Dissolved Air Flotation Water Treatment Plant Pump No. 2 VFD furnishing of all labor, materials, equipment, appurtenances, and incidentals as shown, specified and required for demolition, removal, and disposal work required to properly install the equipment and ensure all instrument
and control connections are correctly configured, follow the manufacturer’s installation guide, verify wiring according to the schematic, and perform functioning testing before commissioning the VFD. The project requires all site work, labor, equipment, and materials complete and in place as stated in the RFB, shown on the plans, and specified herein.
General Contractor shall self-perform a minimum of 51% of this project.
Liquidation Fee is $1000.00 for each day of delay.

With GovernmentContracts, you can:
...Project: Water Treatment Services Ref. #: JKJ-250402 Type: RFP Status: Open Open Date: ...
Dallas Independent School District
Bid Due: 10/15/2026
...Bid Number: 2026-25-40-01 Bid Title: Request for Bids - Water Treatment Chemicals Category: ...
City of Mansfield
Bid Due: 9/30/2026
...Project: Mowing for South Water Treatment Plant Ref. #: ITB 26-19771-YB Type: ITB ...
City of Lubbock
Bid Due: 9/30/2026
...Bid Information Type Invitation to Bid Status Issued Number 27 7D100 (Water Treatment: ...
Education Service Center, Region 2
Bid Due: 11/05/2026