| Location: | Texas |
|---|---|
| Posted: | Oct 2, 2025 |
| Due: | Oct 22, 2025 |
| Agency: | City of Waco |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB 2025-067 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project generally consists of the replacement for the Dissolved Air Flotation Water Treatment Plant Pump No. 2 VFD furnishing of all labor, materials, equipment, appurtenances, and incidentals as shown, specified and required for demolition, removal, and disposal work required to properly install the equipment and ensure all instrument
and control connections are correctly configured, follow the manufacturer’s installation guide, verify wiring according to the schematic, and perform functioning testing before commissioning the VFD. The project requires all site work, labor, equipment, and materials complete and in place as stated in the RFB, shown on the plans, and specified herein.
General Contractor shall self-perform a minimum of 51% of this project.
Liquidation Fee is $1000.00 for each day of delay.

With GovernmentContracts, you can:
..., and commissioning of multiple crane cable reel control systems located at Barbours ...
Port of Houston Authority of Harris County, Texas
Bid Due: 6/10/2026
..., commercial move and relocation services, commissioning, electrical engineering, environmental services... oversight, retro-commissioning, ...
Tarrant County College District
Bid Due: 6/25/2026
...for the demolition, removal, disposal, installation, and commissioning of the new HVAC system ...
DEPT OF DEFENSE
Bid Due: 6/15/2026