| Location: | Texas |
|---|---|
| Posted: | Oct 2, 2025 |
| Due: | Oct 22, 2025 |
| Agency: | City of Waco |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB 2025-067 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project generally consists of the replacement for the Dissolved Air Flotation Water Treatment Plant Pump No. 2 VFD furnishing of all labor, materials, equipment, appurtenances, and incidentals as shown, specified and required for demolition, removal, and disposal work required to properly install the equipment and ensure all instrument
and control connections are correctly configured, follow the manufacturer’s installation guide, verify wiring according to the schematic, and perform functioning testing before commissioning the VFD. The project requires all site work, labor, equipment, and materials complete and in place as stated in the RFB, shown on the plans, and specified herein.
General Contractor shall self-perform a minimum of 51% of this project.
Liquidation Fee is $1000.00 for each day of delay.

With GovernmentContracts, you can:
...(Lake Houston Pump Station Centerpoint Transformer Pad Mount Installation) Issue Date & Time ...
City of College Station
Bid Due: 8/21/2026
...(Lake Houston Pump Station Centerpoint Transformer Pad Mount Installation) Issue Date & Time ...
County of Brazos
Bid Due: 8/21/2026
...Project: Mount Carmel Water Treatment Plant Vertical Turbine Pump #7 Installation Ref. #: ...
City of Waco
Bid Due: 8/06/2026
...Mount Carmel Water Treatment Plant Vertical Turbine Pump #7 Installation Follow Solicitation.../Item Code: ...
State Government of Texas
Bid Due: 8/06/2026