| Location: | Florida |
|---|---|
| Posted: | Feb 20, 2025 |
| Due: | Mar 7, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA252125B0002 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Work to be performed under this project consists of providing all labor, equipment and materials to replace the 60-ton TRANE R-22 Chiller with a TRANE R-410A Chiller. The condenser and evaporator of the new chiller shall be of shell and tube design. The cooling tower shall be replaced with a Tower Tech cooling tower. Both hot and chilled water pumps need to be replaced, along with all new electrical panels. Controls are to be upgraded to PSFB EMCS standards. All piping in the Mechanical Rooms, with the exception of the piping to the boiler, is to be replaced. All the AHUs in the facility needs to be replaced as well. Also, there are 12 fan coil units throughout the facility that are deteriorated and need to be replaced. Each of the fan coil units should be individually controlled with the own wall stat. Touch-up paint walls, replace any damaged gypsum board, replace any damaged wainscot and replace any damaged carpeting, as conditions require during equipment replacement. Design shall include a provision for the Contractor to provide a portable chiller during construction. All work shall comply with State of Florida Building Codes and Wing Facility Excellence guidelines.
| Mar 11, 2025 | [Solicitation (Original)] SXHT 21-1005 Replace Chiller AHU and Fan Coil Unit |
| Mar 18, 2025 | [Solicitation (Updated)] SXHT 21-1005 Replace Chiller AHU and Fan Coil Unit |
| Mar 20, 2025 | [Solicitation (Updated)] SXHT 21-1005 Replace Chiller AHU and Fan Coil Unit |
| Mar 25, 2025 | [Solicitation (Updated)] SXHT 21-1005 Replace Chiller AHU and Fan Coil Unit |
| Apr 9, 2025 | [Solicitation (Updated)] SXHT 21-1005 Replace Chiller AHU and Fan Coil Unit |
| Apr 11, 2025 | [Solicitation (Updated)] SXHT 21-1005 Replace Chiller AHU and Fan Coil Unit |
| Apr 17, 2025 | [Solicitation (Updated)] SXHT 21-1005 Replace Chiller AHU and Fan Coil Unit |

With GovernmentContracts, you can:
...Project ID: PSUT-2026-QQ-02 Title: Submersible Pumps and Control Panel for LS# 74 Addenda: ...
City of Pembroke Pines
Bid Due: 6/25/2026
...electrical control panel with alternative for adding conditioned electrical structure onsite. D... pump, ...
State Government of Florida
Bid Due: 6/26/2026
...ancillary equipment, pump control panel, telemetry and SCADA equipment, site light, installation of ...
City of Jacksonville Beach
Bid Due: 6/17/2026
...pumps and elevation of the control panel. 8) Replace curb sections with holes ...
Miami-Dade County
Bid Due: 7/08/2026