| Location: | Georgia |
|---|---|
| Posted: | Aug 26, 2026 |
| Due: | Sep 29, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-77070-NONST-2027-000000008 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-77070-NONST-2027-000000008 | Lamar County 2026 LRA Project- Camp Road | Lamar County Board Of Commissioners |
Aug 26, 2026 @ 12:10 PM
|
Sep 29, 2026 @ 02:00 PM
|
Start Date: Aug 26, 2026 @ 12:10 PM ET
End Date:
Sep 29, 2026 @ 02:00 PM ET
This is an invitation to submit a bid to Lamar County for the 2026 LMIG ¿ TSPLOST Project (Camp Road) as indicated herein. Sealed bids will be received at the office of the Chairman (in Lamar County Administration Building at the above address) up to 2:30 p.m., September 29, 2026, at which time they will be opened and publicly read.
This project will be funded with 2026 LMIG and TSPLOST funds. Construction includes Full Depth Reclamation (FDR) with asphalt overlay on Camp Road within Lamar County. All work shall conform to the Georgia Department of Transportation¿s (GDOT) Standard Specifications Construction of Transportation Systems, Current Edition; GDOT¿s Supplemental Specifications Construction of Transportation Systems, Current Edition; and all applicable GDOT Standards and Details; and other contract requirements, specifications and general conditions.
Bid Documents may be obtained by downloading them from the Georgia Procurement Registry (GPR) at https://ssl.doas.state.ga.us/PRSapp/. Interested Bidders/Proposers are solely responsible for obtaining the Bid Documents, addenda, and all solicitation updates from the Georgia Procurement Registry. No hard copies of the Bid Documents will be mailed. All questions regarding the Project shall be submitted in writing by email only. Questions shall be emailed simultaneously to: Brian Scarbrough ¿ brian.scarbrough@exp.com; Ritchie Swindell ¿ ritchie.swindell@exp.com; and Sean Townsend ¿ stownsend@lamarcountyga.com.
| Code | Description |
| 91396 | Paving and Resurfacing, Streets, Major and Residential |
| 91395 | Paving and Resurfacing, Highway and Road |
| 91371 | Maintenance and Repair, Highway and Roads, Including Removal of Asphalt, Concrete, Bitumens, etc. |
| 91350 | Construction, Streets, Major and Residential, Including Reconstruction |
| 91327 | Construction, Highway and Road |
Sean Townsend
stownsend@lamarcountyga.com
770-358-5146
INVITATION FOR BID
LAMAR COUNTY GEORGIA
2608-03 BID:
2026 LMIG - TSPLOST PROJECT
CAMP ROAD
August 26, 2026
PREPARED FOR
LAMAR COUNTY
by
EXP US Services, Inc.
142 S. Brunswick St., Jesup, GA 31546
1
Lamar County BID: 2608-03 2026 LMIG - TSPLOST Project (Camp Road)
TABLE OF CONTENTS
PROPOSAL DOCUMENTS PAGE No.
Invitation for Bid 4
Instructions to Bidders 5
General Terms and Conditions 7
Bid Sheet 50
Representation 55
Georgia Security and Immigration
Contractor Affidavit 57
Affidavit Verifying Status of Applicant
for County public Benefits 61
Equal Employment Opportunity Practice 62
Legal and Character Qualifications 63
Oath 65
Bid Bond 66
Contract Agreement 68
Performance Bond 72
2
Lamar County BID: 2608-03 2026 LMIG - TSPLOST Project (Camp Road)
Payment Bond 74
Affidavit of Payment 76
Certificate of Insurance 77
Drug Free Workplace Certification 78
Special Conditions 79
Special Provisions/Typical Sections
Scope of Work/Specifications 81
3
Lamar County BID: 2608-03 2026 LMIG - TSPLOST Project (Camp Road)
INVITATION FOR BIDS
2026 LMIG - TSPLOST PROJECT (Camp Road)
LAMAR COUNTY GEORGIA
790 Veterans Parkway
Barnesville, Georgia 30204
This is an invitation to submit a bid to Lamar County for the 2026 LMIG - TSPLOST Project (Camp Road) as
indicated herein. Sealed bids will be received at the office of the Chairman (in Lamar County Administration
Building at the above address) up to 2:30 p.m., September 29, 2026, at which time they will be opened and publicly
read.
This project will be funded with 2026 LMIG and TSPLOST funds. Construction includes Full Depth Reclamation
(FDR) with asphalt overlay on Camp Road within Lamar County. All work shall conform to the Georgia Department
of Transportation's (GDOT) Standard Specifications Construction of Transportation Systems, Current Edition;
GDOT's Supplemental Specifications Construction of Transportation Systems, Current Edition; and all applicable
GDOT Standards and Details; and other contract requirements, specifications and general conditions.
Bid Documents may be obtained by downloading them from the Georgia Procurement Registry (GPR) at
https://ssl.doas.state.ga.us/PRSapp/. Interested Bidders/Proposers are solely responsible for obtaining the Bid
Documents, addenda, and all solicitation updates from the Georgia Procurement Registry. No hard copies of the
Bid Documents will be mailed. All questions regarding the Project shall be submitted in writing by email only.
Questions shall be emailed simultaneously to: Brian Scarbrough - brian.scarbrough@exp.com; Ritchie Swindell
- ritchie.swindell@exp.com; and Sean Townsend - stownsend@lamarcountyga.com.
Questions must be received no later than 5:00 p.m. on Tuesday, September 22, 2026. Responses to questions
and any revisions to the Bid Documents will be issued by written Addendum and posted to the Georgia Procurement
Registry. Additional addenda may be issued during the bidding period. Bidders/Proposers are responsible for
regularly monitoring the Georgia Procurement Registry and obtaining all Addenda issued for this solicitation.
Instructions for preparation and submission of a bid-proposal are contained in this packet. Bids must be typed or
printed in ink. Bids submitted as a result of this invitation must include the "Bid Sheet" and bids on both options to
be considered along with all required documents and be returned in a sealed envelope or container marked,
"SEALED BID for 2026 LMIG - TSPLOST Project (Camp Road)" on the outside. Bids may not be considered
unless so received.
Any questions and /or misunderstandings that may arise from this invitation shall be submitted in writing at least 10
days prior to the bid opening. The County will not respond to any questions received within 72 hours prior to the
bid opening. Answers to questions submitted that materially change the conditions and specifications of this
invitation for bid will be promulgated to all addressees as an addendum. Any discussions or documents will be
considered non-binding unless incorporated and promulgated in an addendum.
Lamar County provides equal opportunities for all businesses and does not discriminate against any person or
business because of race, color, religion, sex, national origin, handicap or veterans status. This policy ensures all
segments of the business community have access to supplying the goods and services needed by Lamar County.
Lamar County reserves the right to waive any and all technicalities and informalities, reject any or all bids,
and make the award in the best interest of the County.
Sincerely,
Ryran Traylor, Chairman
LAMAR COUNTY, GEORGIA
4
Lamar County BID: 2608-03 2026 LMIG - TSPLOST Project (Camp Road)
2026 LMIG - TSPLOST PROJECT (CAMP ROAD)
INSTRUCTIONS TO BIDDERS
1. Intent: It is intended that the Instructions to Bidders, General Conditions, and Detailed
Specifications shall define and describe the complete work to which they relate.
2. Work to Be Done: The Project Area:
* Camp Road from South 6th Street Ext. to Spalding County Line/Potato Creek Bridge
The work to be performed under this contract consists of full depth cement stabilized
reclamation and asphalt pavement overlay on Camp Road. The project includes general
requirements such as traffic control, shoulder clipping, sweeping, tack and striping. All work
and material shall be in accordance with the Technical Specifications and the construction
drawings.
3. Site Examination: The Bidder is advised to examine the location of the work and to
inform themself fully as to its conditions; the conformation of the ground; the character, quality
and quantity of the products needed preliminary to and during the prosecution of the work; the
general and local conditions and all other matters which can in any way affect the work to be
done under the Contract. Failure to examine the site will not relieve the successful bidder of
their obligation to furnish all products and labor necessary to carry out the provisions of this
contract.
The Bidder shall notify the Owner of the date and time he/she proposes to examine the location
of the work. The Bidder shall confine their examination to the specific areas designated for the
proposed construction, including easements and public rights of way. The Bidder is solely
responsible for any damages caused by his/her examination of the site.
4. Bid and Contract Security: Each Proposal must be accompanied by a bid bond for an
amount equal to at least five percent (5%) of the bid amount. If for any reason whatsoever the
Bidder withdraws from the competition after opening the bids, or if he/she refuses to execute
the Contract, the Owner will proceed on the Bid Bond. The Surety of the Bid Bond, Performance
Bond, and Payment Bond shall be a surety company authorized to do business in the State of
Georgia, shall be listed in the Department of the Treasury Circular 570, and shall have an
underwriting limitation in excess of 100% of the bid amount. The Bonds and Surety shall be
subject to approval by the Attorney for the Owner. Attorneys-in-fact who sign bid bonds or
contract bonds must file with each bond a certified and effectively dated copy of their power of
attorney.
5. Determination of Successful Bidder: The Contract will be awarded to the lowest
responsive, responsible bidder, if awarded.
(a) Responsibility: The determination of the bidder's responsibility will be made by the
Owner based on whether the bidder:
5
Lamar County BID: 2608-03 2026 LMIG - TSPLOST Project (Camp Road)
1. Maintains a permanent place of business,
2. Has the appropriate technical experience,
3. Has adequate plant and equipment to do the work properly and expeditiously
4. Has suitable financial means to meet obligations incidental to the work.
The Bidder shall furnish to the Owner all such information and data for this purpose as the Owner
may request. The Owner reserves the right to reject any bid if the evidence submitted by, or
investigation of, the bidder fails to satisfy the Owner that he/she is properly qualified to carry out
the obligation of the Contract.
(b) Responsiveness: The determination of responsiveness will be made by the Owner
based on a consideration of whether the Bidder has submitted complete Proposal forms without
irregularities, excisions, special conditions, or alternative bids for any item unless specifically
requested in the Proposal forms.
6. Contract Time: Contract time shall consist of One Hundred Eighty (180) consecutive
calendar days for the completion of work, to be computed from the date of the Notice to Proceed.
Liquidated damages shall be assessed at $300 per day.
7. Submission of Bids: Bids shall be submitted at the time and place indicated in the
Invitation. Lamar County will not accept late bids. On the outside of the envelope containing the
bid shall be noted the following:
"SEALED BID for 2026 LMIG - TSPLOST Project (Camp Road)"
8. Georgia Open Records Act: Bidders are reminded that documents and information in
the possession of Lamar County will be treated as confidential/proprietary information only to
the extent permitted by the Georgia Open Records Act and will be exempt from disclosure to a
third party only to the extent permitted by the Georgia Open Records Act. Any trade secrets in
your bid must be placed in a separate envelope, clearly identified and marked as such. Marked
at a minimum by a cover letter explaining exactly where such information is, and otherwise
marked, highlighted, etc. so as to be plainly visible.
9. Proposal Forms: Bids shall be submitted on the Proposal Forms included. Bids shall be
based upon unit prices for estimated quantities except where bid items require lump sum
proposals as indicated by the Proposal Forms. Where errors or omissions result in
discrepancies in bid totals, prices per unit as submitted will be binding.
Final payment will be based upon actual in-place measured quantities, except where lump sums are
requested for bid items.
10. Gratuities: Lamar County acknowledges that, particularly during the holiday season, it
may be customary to provide gifts to employees or departments. However, the Lamar County
Personnel Policy prevents the acceptance of such gifts. Your cooperation in respecting the
policy is appreciated.
6
Lamar County BID: 2608-03 2026 LMIG - TSPLOST Project (Camp Road)
GENERAL TERMS AND CONDITIONS
INDEX
01. Definitions 02. Royalties and Patents
03. Permits and Regulations 04. Verbal Agreements
05. Lands for Work 06. General Warranty and Guarantee
07. Bonds 08. Contractor's Insurance
09. Liens 10. Assignment
11. Joint Venture Contractor 12. Successor's Obligations
13. Business License 14. Obligations and Liability of the Contractor
15. Responsibilities of the Contractor 16. Compliance with Laws
17. Plans, Specifications and Design 18. Drawings Furnished
19. Ownership of Drawings 20. Reference Standards
21. Division of Specifications and Drawings 22. Order of Completion
23. Materials, Appliances & Employees 24. Survey Information
Name 25. Project Completion
26. Inspection and Testing of Materials 27. Substantial Completion
28. Rights of Various Interests 29. Separate Contracts
30. Subcontractors 31. Access
32. Construction Schedule and Procedures 33. Project Management
34. Entry 35. Preservation and Restoration
36. Completion of "Punch List" Items 37. Authority of Contractor
38. Authority of Engineer 39. Owner-Contractor Coordination
40. Interpretation of Specifications & 41. Discrepancies in Specifications &
Drawings Drawings
42. Material, Equipment and Workmanship 43. Compliance with Contract Requirements
44. Project Meetings 45. Overtime and Shift Work
46. Construction Schedule 47. Quality
48. Material and Equipment Specified By 49. Submittal Procedure
50. Requests For Substitution 51. Manufacturer's Directions
52. Product Data 53. Operation and Maintenance Information
54. Record Drawings 55. Protection of the Public and Property
56. Protection of the Owner's Property 57. Maintenance of Traffic
58. Lot Corners 59. Existing Utilities
60. Equal Employment Opportunity 61. Material Delivery, Handling and Storage
62. Maintenance During Construction 63. Emergencies
64. Compensation 65. Safety and Health Regulations
7
Lamar County BID: 2608-03 2026 LMIG - TSPLOST Project (Camp Road)
66. Accidents 67. Load Limits
68. Sanitary Provisions 69. Construction Buildings
70. Cleaning Up 71. Electrical Energy
72. Water Supply 73. Environmental Impact
74. Progress Payments 75. Measurement and Payment
76. Use of Completed Portions 77. Beneficial Use
78. Payments Withheld 79. Contract Time
80. Omissions 81. Differing Site Conditions
82. Changes in Work 83. Force Account and Extra Work
84. Claims for Extra Cost 85. Correction of Work Before Final Payment
86. Liquidated Damages 87. Suspension or Abandonment of Work
88. Termination of Contract 89. Contractor's Right to Stop Work
90. Disputes Resolution 91. Removal of Equipment
92. Laws of Georgia 93. Quantity Variance Reserve
94. Discrepancies between General Conditions 95. Georgia Security and Immigration
And Technical Specifications Compliance Act
96. Salvaged Material & Equipment
01 - Definitions
Where used in the project manual, the following words and terms shall have the meanings indicated. The
meanings shall be applicable to the singular, plural, masculine and feminine of the words and terms.
Acceptance. Formal action of the Owner in determining that the Contractor's work has been completed
in accordance with the contract and in notifying the Contractor in writing of the acceptability of the work.
Act of God. A cataclysmic phenomenon of nature, such as a hurricane, earthquake, or abnormal flood.
Rain, wind, high water, or other natural phenomenon which might reasonably have been anticipated from
historical records of the general locality of the work shall not be construed as acts of God.
Addenda. Supplemental written specifications or drawings issued prior to execution of the contract
which modify or interpret the project manual by addition, deletion, clarification, or corrections.
Bid. Offer of a bidder submitted on the prescribed form setting forth the price or prices of the work to be
performed.
Bidder. Individual, partnership, corporation, or a combination thereof, including joint ventures, offering
a bid to perform the work.
Contract. The writings and drawings embodying the legally binding obligations between the Owner and
the Contractor for completion of the work; Contract Documents attached to the Contract and made a part
thereof as provided herein.
8
Lamar County BID: 2608-03 2026 LMIG - TSPLOST Project (Camp Road)
Contract Documents. The Contract, Addenda (which pertain to the Contract Documents), Contractor's
Bid (including documentation accompanying the Bid and any post Bid documentation submitted prior to
the Notice of Award), the Notice to Proceed, the Bonds, these General Conditions, the Special
Conditions, the Specifications and Drawings, together with all Written Amendments, Change Orders,
Work Change directives, Field Orders, and Drawing submittals. LAMAR COUNTY WILL NOT
ENTERTAIN OR ACCEPT ANY CHANGES TO THE CONTRACT FORMAT PROVIDED.
Contract Drawings. The drawings which show the scope, extent, and character of the work to be
furnished and performed by the Contractor and which have been prepared and reviewed by the Engineer
and are referred to in the Contract Documents.
Contract Price. Amount payable to the Contractor under the terms and conditions of the contract.
Based on the price given on the bidding schedule, with adjustments made in accordance with the
contract. The base amount given in the bidding schedule shall be either a lump sum bid or the summation
of the unit price bids multiplied by the estimated quantities set forth in the bid form.
Contract Time. Number of calendar days stated in the contract for the completion of the work or portions
thereof.
Contractor. The individual, partnership, corporation, or combination thereof, including joint ventures
that enter into the contract with the Owner for the performance of the work. The term covers
subcontractors, equipment and material suppliers, and their employees.
Contractor's Plant and Equipment. Equipment, material, supplies, and all other items, except labor,
brought onto the site by the Contractor to carry out the work, but not to be incorporated in the work.
Contract Technical Representative. The day-to-day County Representative designated by the Owner.
County. Owner.
Day. Calendar day.
Defective. An adjective which when modifying the word "work" refers to work, including but not limited
to the furnishing of materials, that is unsatisfactory, faulty, deficient, or performed in an unworkmanlike
manner, in that it does not conform to or meet the requirements of the Contract, any inspection, reference
standard, test or approval referred to in the Contract, or has been damaged prior to a recommendation
of final payment.
Direct. Action of the Owner by which the Contractor is ordered to perform or refrain from performing
work under the contract.
Directive. Written documentation of the actions of the Engineer or the Owner in directing the Contractor.
Engineer. Whenever the word "Engineer" is used in the contract, it shall be understood as referring to
the Engineer of the Owner, or such other Engineer, supervisor, or inspector as may be authorized by the
Owner to act in any particular area of the Contract.
Equipment. Mechanical, electrical, instrumentation, or other devices with one or more moving parts, or
devices requiring an electrical, pneumatic, electronic, or hydraulic connection.
Furnish. To deliver to the job site or other specified location any item, equipment, or material.
Herein. Refers to information presented in the project manual.
9
Lamar County BID: 2608-03 2026 LMIG - TSPLOST Project (Camp Road)
Holidays. Legal holidays designated by the Owner.
Install. Placing, erecting, or constructing complete in place any item, equipment, or material.
May. Refers to permissive actions.
Owner. Lamar County, Georgia.
Person. The term, person, includes firms, companies, corporations, partnerships, and joint ventures.
Project. The undertaking to be performed under the provisions of the contract.
Project Manual. Those contact documents prepared for bidding and as amended by addenda.
Provide. Furnish and install, complete in place.
Punch List. List of incomplete items of work and of items of work which are not in conformance with the
contract. The list will be prepared by the Engineer when the Contractor (1) notifies the Engineer in writing
that the work has been completed in accordance with the contract and (2) requests in writing that the
Owner accept the work.
Shall. Refers to actions by either the Contractor or the Owner and means the Contractor or Owner has
entered into a covenant with the other party to do or perform the action.
Shown. Refers to information presented on the drawings, with or without reference to the drawings.
Specifications. That part of the contract documents consisting of written descriptions of the technical
features of materials, equipment, construction system, standards, and workmanship.
Specify. Refers to information described, shown, noted, or presented in any manner in any part of the
contract.
Submittals. The information which is specified for submission to the Owner in accordance with Division
of the project manual.
Substantial Completion. Sufficient completion of the project or the portion thereof to permit utilization
of the project, or portion thereof for its intended purpose. Substantial completion requires not only that
the work be sufficiently completed to permit utilization, but that the Owner can effectively utilize the
substantially completed work. Determination of substantial completion is solely at the discretion of the
Owner. Substantial completion does not mean complete in accordance with the contract nor shall
substantial completion of all or any part of the project entitle the Contractor to acceptance under the
contract.
Substantial Completion Date. Date shown on the certificate of Substantial Completion.
Will. Refers to actions entered into by the Contractor or the Owner as a covenant with the other party
to do or to perform the action.
Work. The labor, materials, equipment, supplies, services, and other items necessary for the execution,
completion, and fulfillment of the contract.
10

With GovernmentContracts, you can:
...Construction Management Services for Complex Calhoun City Schools Sep 15, 2026 @ 10:49 ...
State Government of Georgia
Bid Due: 10/19/2026
...Construction Management at Risk Services Polk School District Sep 15, 2026 @ 03:20 ...
State Government of Georgia
Bid Due: 10/20/2026
...Request for Proposal - Construction Professional...
Houston County School District
Bid Due: 10/06/2026
...BL135-26 NOT Construction of Vines Park Phase II Buyer Contact : Jake.Scarpone@GwinnettCounty.com... Construction ...
Gwinnett County
Bid Due: 10/23/2026