| Location: | Georgia |
|---|---|
| Posted: | Apr 23, 2026 |
| Due: | Jun 2, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-67800-NONST-2026-000000042 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-67800-NONST-2026-000000042 | Access Control System at Jackson County Jail | Jackson County Board Of Commissioners |
Apr 23, 2026 @ 10:45 AM
|
Jun 02, 2026 @ 10:00 AM
|
Start Date: Apr 23, 2026 @ 10:45 AM ET
End Date:
Jun 02, 2026 @ 10:00 AM ET
Jail Access Control
System Functional Requirements
The proposed system shall be capable of monitoring, controlling, and integrating the following components:
¿ Swing Doors (345)
¿ DPS Monitoring Points (56)
¿ Gate Control Points (3)
¿ Sliding Doors (11)
¿ Intercom Stations (428)
¿ Paging Zones (33)
¿ IP Camera Integration via RTSP (130) ¿ County standard: Avigilon
¿ Panic Alarm Inputs (22)
¿ Watch Tour Monitoring Points (29)
¿ Card Readers (25) ¿ County standard: Avigilon
¿ Lighting Control
¿ Television (TV) Control
System Components and Infrastructure Requirements
The following components are anticipated to be required as part of the proposed solution. Equivalent alternatives must be approved by the County prior to submission:
¿ Workstations: Dell workstations with 27¿ Dell monitors and APC UPS battery backup, fully integrated with the County¿s existing EcoStruxure IT monitoring environment, for security system operations
¿ Server Infrastructure: Dell rack-mounted server with APC UPS, fully integrated into the existing EcoStruxure IT environment, supporting both server and network switching infrastructure
¿ Relay Control Modules: Three (3) modules to interface with and control existing relays to remain in service
¿ System Exchanges: Fifteen (15) units
¿ Intercom Master Stations: Thirteen (13) units
¿ Low Voltage Power Supplies: Ten (10) units
Card Access Control System
¿ Enclosures: Three (3)
¿ Card Readers: Twenty-five (25)
¿ Controller Boards (¿Main System Boards¿): Three (3)
¿ Expansion Modules: Nineteen (19)
¿ Access Control Server: One (1)
Documentation and Deliverables
The selected firm shall provide the following:
¿ Complete shop drawings
¿ Equipment layout drawings
¿ Device termination drawings
¿ Comprehensive training for County staff and system administrators
¿ All shipping and freight costs to the project site
| Code | Description |
| 68002 | Access Control Systems and Security Systems |
Purchasing
bidopportunities@jacksoncountygov.com
706-367-6313

With GovernmentContracts, you can:
...Project: Unarmed Security Guard Service Ref. #: RFP 010-26 Type: RFP Status: Open ...
Clayton County Public Schools
Bid Due: 6/16/2026
...RFP 010-26 Unarmed Security Guard Services Clayton County Board Of Education May 15, ...
State Government of Georgia
Bid Due: 6/16/2026
...Follow Access Control and Video Monitoring Systems (ACS & VMS) Active Contract Opportunity... ...
DEPT OF DEFENSE
Bid Due: 6/25/2026
...?s SCADA monitoring and control system at one (1) office location, with Remote ...
State Government of Georgia
Bid Due: 6/30/2026