Construction of: New Athletic Facilities and New Board of Education Central Office

Location: Georgia
Posted: Oct 15, 2026
Due: Nov 12, 2026
Agency: State Government of Georgia
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: PE-77451-NONST-2027-000000004
Publication URL: To access bid details, please log in.
Event ID Event Title Government Entity Start Date (ET) End Date (ET)
PE-77451-NONST-2027-000000004 Construction of: New Athletic Facilities and New Board of Education Central Office Wayne County Board Of Education
Oct 15, 2026 @ 02:48 PM
Nov 12, 2026 @ 02:00 PM
Construction of: New Athletic Facilities and New Board of Education Central Office

Start Date: Oct 15, 2026 @ 02:48 PM ET

End Date:
Nov 12, 2026 @ 02:00 PM ET

Event ID: PE-77451-NONST-2027-000000004
Event Type: Non-State Agency
Event Status: Open
Purchase Type: Non-State Agency
Category Type: Construction / Public Works
Government Type: K-12
Fiscal Year: 2027
Agency Site: Link


Description


The Wayne County School District is requesting a proposal from interested and qualified Construction Management Firms for the Construction of: New Athletic Facilities and New Board of Education Central Office.

NIGP Codes
Code Description
91473 Roofing and Siding
90930 Building Construction, (Not Otherwise Classified)
90927 Building Construction, Educational
90924 Building Construction, Commercial and Institutional
BuyerContact:

Toni Williams
toni.williams@wayne.k12.ga.us

912-427-1000 ext. 1

Attachment Preview

REQUEST FOR PROPOSALS
TO PROVIDE CONSTRUCTION MANAGEMENT SERVICES
FOR THE CONSTRUCTION OF:
NEW ATHLETIC FACILITIES
and
NEW BOARD OF EDUCATION CENTRAL OFFICE
WAYNE COUNTY SCHOOL DISTRICT
JESUP, GEORGIA
SAE Project Number:
01-677-018
01-677-019
The Wayne County Board of Education reserves the right to reject any and all proposals and to waive technicalities.
1

INTRODUCTION
The Wayne County School District is requesting a proposal from interested and qualified Construction
Management Firms for the Construction of: New Athletic Facilities and New Board of Education
Central Office. The approximate total anticipated budget for all phases in this project is $35,000,000.
The projected Scope of Work for construction is anticipated to include the following:
Phase 1 - New Athletic Facilities
* Construction of a New Football Stadium with the following:
* New grandstands with seating for 4,500 spectators
* New press box
* New synthetic turf field
* New fieldhouse building, approximately 13,000 sf
* New visitors' dressing room and storage building, approximately 3,000 sf
* New ticketing pavilions
* New home and visitor side restroom and concession buildings
* Construction of a New Baseball Field
* New concessions and restroom building for baseball and softball use
* New hitting & pitching facility, approximately 9,000 sf
* New ticketing pavilions
* New grandstands and pressbox
* Construction of a New Softball Field
* New hitting & pitching facility, approximately 9,000 sf
* New grandstands and press box
* Parking areas and drives
Phase 2- New Board of Education Central Offices
* Construction of a New Board of Education Central Office, approximately 23,000 sf.
* Parking areas and drives
The commencement of this project is contingent upon the passing of an ESPLOST and general
obligation bond referendum to be voted on by the citizens of Wayne County in March 2027. The Wayne
County School System reserves the right to modify the project phasing, schedule, or overall status
following review of the bond voting results.
A mandatory pre-proposal conference will be held on October 29, 2026 @ 10:00 am at Wayne County
High School, One Jacket Drive, Jesup, GA 31545. Proposals submitted from CM's that do not attend the
conference will NOT be accepted.
The Wayne County School District plans to select the most qualified Construction Management Firm
(hereinafter referred to as CM) to enter into a CM at Risk contract for the construction for the above
referenced project. The proposed fee to be submitted as a part of the CM Proposal will include "Pre-
Construction Services" to be awarded as a fixed fee dollar amount, "General Conditions" awarded on a
fixed fee dollar amount, and "Overhead and Profit" to be awarded as a percentage.
2

The services to be performed by the CM will have as their objective the efficient, economical, and
timely delivery of the project by managing the construction of the project within the time and cost
limitations and within established quality requirements. The services will be performed during the pre-
construction phase, construction phase and post construction phase including working with the owner in
estimating, value engineering, arrangements of bid packages, bidding and award of the trade contracts,
and management of construction until occupancy is achieved, and implementing the one (1) year
warranty and one (1) year warranty inspection.
The procedures for public works construction contracts as established by the Georgia Local Government
Public Works Construction Law, O.C.G.A., 36-91-1 shall be followed. Final selection will be made in
accordance with the policies and administrative directives of the School District and any other statutory
provisions.
Responses must be received by the Wayne County School District Central Office at 710 W. Pine
Street, Jesup, GA 31545 on or before 2:00pm on November 12, 2026, after which time and date they
will no longer be accepted. Late responses will be returned unopened and will not be considered. To be
accepted, all responses must be submitted in a sealed package marked "Construction of: New Athletic
Facilities and New Board of Education Central Office". Six (6) printed copies of each proposal and
one digital copy on a thumb drive must be forwarded or delivered to:
Ms. Toni Williams
Superintendent
WAYNE COUNTY SCHOOL DISTRICT
710 W. Pine Street
Jesup, GA 31545
Oral or telegraphic (including FAX) responses are not acceptable.
PROJECT SELECTION TIMELINE:
Advertise for CM @ Risk Thursday, October 15, 2026
Mandatory Preproposal Conference Thursday, October 29, 2026, 10:00 am
CM @ Risk Proposals Due Thursday, November 12, 2026, 2:00 pm
BOE Approval of C.M. @ Risk Contract Tuesday, November 17, 2026
GENERAL INFORMATION
Please direct all questions regarding this Proposal Request and the program it represents to:
Mr. Jerzy Irlik
Project Manager
Southern A&E, LLC
7951 Troon Circle
Austell, GA 30168
Ph: 770-819-7777
Email: jirlik@southernae.com
3

No questions other than written will be accepted, and no response other than written will be binding
upon Wayne County School District.
Proposal documents may be examined at Southern A&E's office at 7951 Troon Circle, Austell, Georgia
30168 or by calling 770-819-7777 to request a password and a link to Southern A&E's online plan
service to view the documents. Proposal documents will not be sent to plan rooms. All documents,
including any addenda, will be posted only at the office of Southern A&E and on their online plan
room.
Wayne County School District reserves the right to amend this RFP prior to the proposal due date. All
amendments and additional information will be e-mailed to proposers of record and posted to the
Wayne County School District's website, https://www.Wayne.k12.ga.us. Proposers should check this
web page frequently for new information.
Submission of a proposal authorizes Wayne County School District to make inquiries concerning
the proposer and its officers, agents, and representatives to any persons or firms deemed
appropriate by Wayne County School District.
Proposals are subject to the Georgia Open Records Act. Wayne County School District cannot protect
proprietary data submitted in proposals.
Submission of proposals indicates Respondent's acceptance of the evaluation technique and
Respondent's recognition that some subjective judgments must be made by Wayne County School
District during the determination of ranking order and award.
Wayne County School District reserves the right to select or reject any and all responses as a result of
this Request for Proposal. The school District is not liable for any costs incurred by any person or firm
responding to this Request for Proposal.
The Wayne County School District also reserves the right to negotiate with proposers prior to the award
for the purpose of obtaining best and final offers. All proposers will be given an opportunity to
participate in negotiations and submission of a best and final offer. The Wayne County School District
shall not disclose the contents of proposals to competing proposers during the negotiations. Reference
O.C.G.A 36-91-21 for regulations for best and final offers.
4

GENERAL REQUIREMENTS
CM Responsibility
The selected CM will be required to assume total responsibility for all services offered in his/her
proposal. The selected CM will be considered the prime contractor and the sole point of contact with
regard to all contractual matters. The CM shall also be expected to obtain at least three bids for each
bid package (work category), exclusive of the CM's guaranteed maximum price for the individual bid
packages (work categories). If any bid packages receive less than three qualified bids, the Owner
reserves the right to return the bids unopened and require rebidding these packages. The CM shall be
required to submit a GMP for each bid package (work category) to Wayne County School District
prior to the opening of subcontractor bids. All subcontractor bids shall be opened in a location
designated by the Wayne County School District and all subcontractor bids shall be opened in the
presence of a representative of the Wayne County School District. The CM will not perform any
portion of the project with its own forces except as may be mutually agreed to by the owner and the
CM and as allowed by the Georgia Department of Education. Individual trade contracts will be
between the CM and the Trade Contractors, subject to school District approval.
The CM agrees to perform all work in compliance with O.C.G.A.13-10-91, Georgia Security and
Immigration Compliance Act. The CM shall state affirmatively that the individual, firm, or
corporation which is contracting with the Wayne County School District, has registered with and is
participating in a federal work authorization program using any of the electronic verification of work
authorization programs operated by the United States Department of Homeland Security or any
equivalent federal work authorization program operated by the United States Department of Homeland
Security to verify information of newly hired employees, pursuant to the Immigration Reform and
Control Act of 1986 (IRCA), P.L. 99-603], in accordance with the applicability provisions and
deadlines established in O.C.G.A. 13-10-91. See Attachment 7 that must be complete with proposal.
The CM further agrees that, should it employ or contract with any subcontractor(s) in connection with
the physical performance of services pursuant to this contract with Wayne County School District,
contractor will secure from such subcontractor(s) similar verification of compliance with O.C.G.A.
13-10-91 on the Subcontractor Affidavit provided in Rule 300-10-01-08 or a substantially similar
form. Contractor further agrees to maintain records of such compliance and provide a copy of each
such verification to the Wayne County School District at the time the subcontractor(s) is retained
to perform such service.
The CM also agrees to perform all work in compliance with O.C.G.A. 50-36-1 Systematic Alien
Verification for Entitlements (SAVE) program. The CM agrees that, should it employ or contract with
any subcontractor(s) pursuant to this contract with Wayne County School District, the CM will secure
from such subcontractor(s) similar verification of compliance with O.C.G.A. 50-36-1. The CM also
agrees to provide verification of compliance with executed affidavits available on the Department of
Audits and Accounts website at, http://www.audits.ga.gov/NALGAD/Files/OCGA_50-36-1xex2x/pdf.
The CM further agrees to maintain records of such compliance and provide a copy of each such
verification to the Wayne County School District at the time the subcontractor(s) is retained to
perform such service."
5

Required Bonds and Insurance
1. Prior to the award of a GMP contract, the CM shall provide the school District with a 100 percent
Performance and Payment Bond from a bonding institution listed in the current edition of the
Federal Register as a surety for its faithful performance of this contract. Bonds must be kept in
force for the duration of the contract; and, executed by a resident agent of the State of Georgia;
and, be in compliance with Georgia Revised Statutes. The CM's performance and payment bonds
shall be included in the CM's Fee Proposal
2. Subcontractor Default Insurance: Construction management firms may, at the construction
manager's discretion, provide SDI Insurance for Trade (Sub) contractors. If SDI insurance is to be
provided, the insurance shall cover all trades.
a. The cost of SDI Insurance shall be part of the Construction Management Fee.
b. The cost of the insurance shall be listed on the proposal form as a percentage of the overall
cost of the work.
3. Bonding of Trade (Sub) Contractors: Construction management firms may, at the construction
manager's discretion, provide bonding for trade (sub) contractors.
a. The cost for the subcontractor bonds shall be considered as part of the Construction
Management Fee.
b. The cost for the bonds shall be listed on the proposal form and shall be stated as a
percentage of the overall cost of the work.
4. Evidence of required bonds shall be presented prior to the execution of contract, insurance policies
to be carried under the agreement shall not be changed, canceled, or allowed to expire without
thirty (30) days prior written notification to the school District The cost for the bonds shall be
listed on the proposal form and shall be stated as a percentage of the overall cost of the work.
Below is listed the insurance coverage which must be procured by the contractor at his own expense.
The contractor agrees to follow instructions indicated in each case:
(1) Comprehensive General Liability Insurance. Combined Single limits including Bodily
Injury and Property Damage with limits of $1,000,000 for each occurrence, personal and
advertising injury with a limit of $1,000,000 per occurrence and $2,000,000 general and
products/completed operations aggregates. General Liability should include premises/operations
coverage and products and completed operations coverage. Policy should include X, C, U
(Explosion, Collapse, and Underground Coverage).
(2) Auto Liability - including Owner, hired, and non-owned vehicles with Combined Single
limits including Bodily injury and Property damage of $1,000,000 for each occurrence.
(3) Umbrella Excess Liability Insurance: Contractor shall carry umbrella excess liability
including Auto, General Liability and Workers' Compensation in the amount of $1,000,000 over
existing primary insurance and over self-insured hazards.
6

(4) Environment Impairment Liability and/or Pollution Liability - $1,000,000 per occurrence.
(5) Worker's Compensation: As required by law.
(6) Pollution Insurance
a. If the Scope of this Contract includes Site work, Civil Work, Land Disturbance, Landscaping
or Underground Utility Work, then Contractor shall provide the following Pollution
Insurance:
1. The Contractor shall procure and maintain at the Contractor's own expense Pollution
Insurance with limits not less than $1,000,000 each occurrence and $2,000,000 aggregate.
Owner shall be named additional insured on the Pollution Policy.
All of the above policies must be occurrence based. The Wayne County School District shall
be named as an additional insured on all policies. The policies shall contain provisions that the
coverage provided by said policies shall be primary to any insurance maintained by the School
District. Said insurance shall in fact be primary to any insurance maintained by the School
District.
Evidence of required bonds and insurance shall be presented prior to the execution of a GMP contract.
The required bond shall be indicated as a single line item on the CMs GMP breakdown, and the
bonding amount shall be adjusted by change order when all contract cost are established by
procurement of subcontract bids. Insurance policies to be carried under the agreement shall not be
changed, canceled, or allowed to expire without thirty (30) days prior written notification to the
school District.
Should the CM elect to require certain subcontractors to provide Performance Bonds and Labor and
Material Payment Bonds, the cost of these subcontractor provided bonds shall be the responsibility of
the CM and shall not be included in the GMP. The cost of these subcontractor provided bonds shall
be itemized as a separate line item on the subcontractor's bid form.
Taxes, Fees, Code Compliance and Licensing
The CM shall be responsible for the payment of any required taxes or fees associated with the
execution of a GMP contract. The CM shall also be responsible for compliance with all applicable
codes and statutes. All installation and construction work shall be done by sub- contractors
licensed in the State of Georgia.
Payment
CM shall submit monthly payment applications using AIA G702 and AIA G703 Continuation Sheets in
addition to Georgia State Department of Education DE Form 0263, July 1982 Edition.
The CM shall defend hold harmless and indemnify the Owner, the Architect, and other design
consultants against all claims, suits, actions, costs, council fees, expenses, damages and/or
judgments in decrees by reason of persons or property being damaged or injured by the CM or any
7

of the CM employees/subcontractors in any capacity during the progress of the work, whether by
negligence or otherwise. This indemnity provision shall not be construed so as to require CM to
indemnify the Owner, Architect and the other design consultants for their own sole negligence.
8

REPRESENTATIVE SERVICES TO BE PROVIDED BY THE C.M.
Project Planning
1. Evaluate preliminary documents for constructability, value opportunities and scheduling at
each phase of design.
2. Participate and assist in planning meetings.
3. Provide estimates at the Construction Document phase and an estimated monthly
construction payment schedule to assist the owner with financial budgets.
4. Conduct a Value Engineering review, including Life Cycle Cost, and evaluations for alternate
materials and systems.
5. Prepare and submit cash flow analysis to Owner.
Bidding and Awarding Phase
1. Separate construction work into appropriate work categories (See attachment 1; page 11).
2. Develop requirements to assure time, cost, and quality control during construction.
3. Provide an estimated construction schedule for issuance with the proposal package.
4. Identify bidders and generate bidder interest. Maintain a list of firms contacted and dates of
contact for review by the Owner.
5. Schedule and conduct pre-bid conferences in conjunction with the architect and
representatives from the School District.
6. Advertise and distribute bidding documents.
7. Assist in development of necessary addenda and distributing of these addenda to known
bidders.
8. Monitor bidder activity.
9. Review and analyze bids and recommend awards.
10. Collect executed contracts, purchase orders, affidavits of assurance, insurance
certificates, and performance and payment bonds and distribute copies to Owner,
Architect and contractors.
11. Update schedule.
12. Assist in Pre-Construction meetings.
Construction Phase
1. Maintain staff for construction management to include an on-site superintendent.
Superintendent shall have supervised past projects of equal size and scope and have
excellent performance references from the owners for a minimum of three (3) projects
within a period of five (5) years maximum. CM shall submit his proposed
superintendent/superintendents and references for review by the Owner and Architect with
this proposal.
2. Mobilization of job site - Provide and maintain a fully equipped project office facility on-site
to perform all required CM duties and meetings and coordination of on-site temporary
facilities.
3. Assure timely procurement of all required permits.
4. Establish and maintain coordination procedures.
9

5. Develop and maintain a detailed schedule including delivery, approvals, inspection,
testing, construction, and occupancy.
6. Conduct and record a minimum of bi-weekly job progress meetings following a CM
generated agenda with the Architect, Owner and all active trades, and follow-up with
distribution of minutes to all parties.
7. Coordinate and log all request for information (RFI's).
8. Maintain a daily log of jobsite activities.
9. Prepare and submit change order documentation for review and approval by the architect and
School District. Review change order proposals to verify validity, purpose, and cost.
10. Maintain a system for review and approval of shop drawings.
11. Maintain written and photographic records and submit routine reports to the architect and
School District. Aerial progress photographs should be taken on a monthly basis or more
often as changes require.
12. Maintain quality control and ensure conformity to contract documents.
13. Establish and maintain a jobsite safety program.
14. Provide cost control through progress payment review and verification according to the
approved schedule and contract amounts.
15. Provide coordination of post completion activities, including the assembly of guarantees,
manuals and the owner's final acceptance.
16. Coordinate and assure timely completion of final punch list.
17. Compile as-built drawings throughout construction.
18. Assemble close-out documents and forward to Architect for approval.
19. Coordinate any training specified for Owner's personnel.
20. Provide all services listed under "General Conditions" in Attachment 2.
Post Occupancy Phase
1. Implement and coordinate the one (1) year warranty and one (1) year warranty
inspection.
2. Respond to request for corrections for work items found not to be installed correctly.
3. Respond to warranty related request.
4. Assist in post-construction review of the facility.
10

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Project: CONSTRUCTION TIME AND MATERIALS Ref. #: RFP 27-261110 Type: RFP Status: Open ...

Paulding County School District

Bid Due: 12/10/2026

...CONSTRUCTION TIME AND MATERIALS Paulding County School District Nov 10, 2026 @ 09:31 ...

State Government of Georgia

Bid Due: 12/10/2026

...Construction Manager at Risk (CMAR) Preconstruction and Construction Services for Middle Oconee WRF... ...

State Government of Georgia

Bid Due: 12/17/2026

...Follow Prefabrication Training Venues and Construction Supplies Active Contract Opportunity Notice...

HOMELAND SECURITY, DEPARTMENT OF

Bid Due: 12/29/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.