| Location: | Georgia |
|---|---|
| Posted: | Oct 15, 2026 |
| Due: | Nov 12, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-63125-NONST-2027-000000083 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-63125-NONST-2027-000000083 | 2026-GS-14 Switchgear Preventative Maintenance and Overload Testing | Clayton County Water Authority |
Oct 15, 2026 @ 09:55 AM
|
Nov 12, 2026 @ 03:00 PM
|
Start Date: Oct 15, 2026 @ 09:55 AM ET
End Date:
Nov 12, 2026 @ 03:00 PM ET
The Clayton County Water Authority (CCWA) owns and operates various facilities to supply, produce, treat, and distribute water to its customers throughout Clayton County, Georgia. These facilities include raw water diversion, groundwater recharge, water wells, water treatment and production plants, water storage facilities, lift stations, and pressure-regulating stations. CCWA facilities operate on a 24/7 basis and depend upon safe and reliable electrical equipment and infrastructure.
| Code | Description |
| 93625 | Electrical Equipment, Except Cable and Wires, and Lighting Fixtures Maintenance and Repair |
| 93677 | Substation High Voltage, Electrical Maintenance and Repair |
| 96848 | Inspection Services, Electrical Instrumentation and Control |
| 99239 | Electrical Systems Testing Services |
| 99240 | Electronic and Electrical Cable Testing Services |
| 28567 | Power Systems Switchgears and Related Accessories |
CCWA PROCUREMENT
ccwa_procurement@ccwa.us
770-960-5223
CLAYTON COUNTY WATER AUTHORITY PROCUREMENT PORTAL INSTRUCTIONS
QUESTIONS
All solicitation questions must be submitted electronically to https://ccwa.bonfirehub.com through the
Vendor Discussions section under the respective Project.
SUBMISSION INSTRUCTIONS
All submissions must be submitted electronically via the Procurement Portal
https://ccwa.bonfirehub.com under the respective Project.
Your submission must be uploaded, submitted, and finalized prior to the Project's posted due date. CCWA
strongly recommends allowing sufficient time to complete this process (ideally a week prior to the
deadline) to begin the uploading process and to finalize your submission. Uploading large documents may
take time, depending on the size of the file(s) and your Internet connection speed.
BROWSERS
The Bonfire portal can be accessed using Microsoft Edge, Google Chrome, or Mozilla Firefox. Javascript
must be enabled. Browser cookies must be enabled.
SUPPORT
Contact the Bonfire support team at support.bonfire@eunasolutions.com or by calling 1-800-354-8010.

With GovernmentContracts, you can:
...Water Treatment Plant Raw Water Pump Station Emergency Power Hartwell, City Of Nov ...
State Government of Georgia
Bid Due: 12/04/2026
...Intent to Utilize Sole Source For City of Valdosta Water Treatment Plant Valdosta, ...
State Government of Georgia
Bid Due: 11/18/2026
...BID #27017 JG Beacham Water Treatment Plant Miscellaneous Coatings Athens-Clarke County Government... Oct ...
State Government of Georgia
Bid Due: 11/18/2026
..., Water, etc. 96896 Water and Wastewater Treatment Services 91392 Maintenance and Repair, ...
State Government of Georgia
Bid Due: 11/20/2026