| Location: | Georgia |
|---|---|
| Posted: | Oct 15, 2026 |
| Due: | Nov 11, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-67500-NONST-2027-000000181 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-67500-NONST-2027-000000181 | (RFP) 27-21, Richard Craig Park Athletic Complex Renovation | Henry County Board Of Commissioners |
Oct 15, 2026 @ 08:33 AM
|
Nov 11, 2026 @ 03:00 PM
|
Start Date: Oct 15, 2026 @ 08:33 AM ET
End Date:
Nov 11, 2026 @ 03:00 PM ET
Henry County is accepting proposals from qualified vendors to provide a complete turnkey renovation of the Richard Craig Park Athletic Complex Renovation for Henry County Parks & Recreation. This project is to renovate and modernize the Richard Craig Park Athletic Complex to provide Henry County Parks & Recreation with a safe, accessible, and tournament-quality facility for recreational programs, league play, tournaments, and community events. Contractor shall furnish all labor, materials, equipment, and services required to fulfill the terms and conditions of this RFP.
RFPs will be accepted until 3:00 PM local time on Wednesday, November 11, 2026. Late RFPs will not be considered nor returned. RFPs submitted by mail, common carrier or delivered in person will be received by Henry County, Purchasing Department, located at 140 Henry Parkway, McDonough, GA 30253. Electronic RFPs are to be submitted through the County¿s eProcurement Portal at (https://procurement.opengov.com/portal/henryga). Emailed or faxed RFPs will not be considered
RFPs may not be withdrawn for sixty (60) days after the time and date set for closing, except as allowed by OCGA. Henry County reserves the right to reject any and all RFPs and to waive any technicalities.
The RFP documents and specifications are available for inspection and download here:
| Code | Description |
| 98863 | Park Area Construction and Renovation |
| 90916 | Athletic Facility Construction |
| 80517 | Athletic Field Markers, Goal Posts, Bases, Goals, etc., Including Athletic Field Striping Machines |
| 79002 | Athletic Field Compositions, Baseball Infields, etc. |
Shawnviez Lilly
slilly@henrycountyga.gov
770-288-6263
1. Project Identification and Overview
1.1 Project
Richard Craig Park Athletic Complex Renovation
Henry County Parks & Recreation
McDonough, Georgia
Executive Summary
The Richard Craig Park Athletic Complex Renovation is a comprehensive turnkey
modernization of one of Henry County Parks & Recreation's premier baseball and softball
facilities. The project includes the phased renovation of eight conventional baseball and
softball fields, the Sunshine League therapeutic field, the concession facility, and all
associated site improvements necessary to deliver a fully operational, safe, ADA-
accessible, and tournament-quality athletic complex capable of supporting recreational
programming, league play, Sunshine League activities, regional tournaments, and
community events. Construction shall be completed in two phases to minimize
disruptions to park operations and recreational programming. Phase One shall
include the complete renovation and turnover of Fields 1 through 5, including all
associated infrastructure and site improvements required to place those facilities
into full operational service. Upon completion, testing, final acceptance, and return of
Phase One to Henry County Parks & Recreation for public use, the Contractor shall
proceed with Phase Two consisting of the complete renovation of Fields 6 through 8,
the Sunshine League therapeutic field, the concession building renovation, batting
cage improvements, and all remaining site improvements. The Contractor shall
coordinate all work with Henry County Parks & Recreation to maintain scheduled
recreational programming and minimize disruptions throughout the duration of the
project.
The Work includes, but is not limited to, selective demolition; earthwork; laser grading;
drainage improvements; complete replacement of irrigation systems; installation of
certified 419 Bermuda sod; reconstruction of athletic infields utilizing new athletic infield
mix and topdressing; renovation of the Sunshine League therapeutic field with a
specialized ADA-accessible cushioned playing surface; construction of reinforced
concrete sidewalks, accessible routes, equipment pads, retaining curbs, dugout roof
systems, renovation of the existing concession facility, and miscellaneous site
improvements. The project also includes installation of new 9-gauge galvanized chain-
link fencing, complete backstop systems with overhead safety netting, 30-foot black
powder-coated backstop support poles, pedestrian and maintenance gates, 20-foot-
tall, minimum 3-inch diameter black powder-coated foul poles, premium black athletic
backstop padding, custom black commercial-grade windscreens featuring the Henry
County Parks & Recreation and City of McDonough logos, home run markers installed on
the outfield fencing of all conventional fields, renovation of the existing 60-foot by 81-foot
batting cage facility into a five-station training complex with synthetic turf and a sliding
curtain divider system, demolition of the existing score tower slab, and restoration of all
disturbed areas required for a complete turnkey installation.
The concession facility renovation shall include all labor, materials, equipment,
supervision, and incidentals necessary to modernize the building, including new energy-
efficient LED lighting, electrical upgrades, commercial restroom improvements, new
restroom partitions, epoxy wall coatings, interior and exterior painting, ventilation
improvements, accessibility upgrades, and all associated work necessary to provide a fully
operational concession and restroom facility.
The Contractor shall serve as the single-source turnkey contractor and shall be solely
responsible for furnishing, coordinating, and completing all work associated with the
project. This responsibility shall include all civil, structural, architectural, electrical,
mechanical, plumbing, irrigation, concrete, fencing, athletic surfacing, and specialty
improvements necessary to deliver a complete and fully operational athletic complex. The
Contractor shall provide all electrical infrastructure, conduit, wiring, disconnects,
controls, testing, commissioning, and final power connections necessary to place all
scoreboards, irrigation controllers, concession facilities, electrical equipment, and
associated park infrastructure into complete operational service. The Contractor shall
coordinate directly with the serving utility provider and all applicable permitting agencies
to ensure all electrical systems are installed, energized, tested, and fully operational upon
project completion.
In addition to all required Georgia 811 utility notifications, the Contractor shall be solely
responsible for obtaining and performing all required private utility locating services prior
to excavation. The Contractor shall verify the location of all existing underground utilities
and shall be responsible for protecting all known and discovered utilities throughout
construction. Any damage resulting from failure to properly locate, verify, or protect
existing utilities shall be repaired or replaced by the Contractor at no additional cost to the
Owner.
Accessibility is a primary objective of this project. All sidewalks, pedestrian routes, gates,
dugouts, concession facilities, spectator areas, and site improvements shall be designed
and constructed to meet or exceed applicable ADA accessibility requirements while
providing safe, continuous, and barrier-free access throughout the athletic complex. The
Sunshine League therapeutic field shall receive specialized improvements that preserve
and enhance its inclusive, barrier-free playing environment through the installation of a
cushioned therapeutic playing surface, accessible transitions, safety improvements,
protective padding, and enhanced access for athletes of all abilities.
The Contractor shall provide all labor, supervision, materials, equipment, permits,
subcontractors, project management, transportation, testing, inspections, cleanup,
warranties, and incidentals necessary to complete the project as a single-prime turnkey
contract. The Contractor shall also include all miscellaneous work required for a complete
and operational facility, including unforeseen electrical modifications, utility coordination,
field adjustments, and all work reasonably inferable from the Contract Documents. The
Contractor shall include a ten percent (10%) construction contingency allowance within
the Base Bid to address unforeseen conditions, concealed site conditions, utility conflicts,
minor Owner-directed scope adjustments, and miscellaneous work necessary to
successfully deliver the completed athletic complex. Expenditures from the contingency
allowance shall require prior written authorization from Henry County Parks & Recreation,
and any unused contingency funds shall be returned to the Owner through the final project
reconciliation.
Upon completion, the Richard Craig Park Athletic Complex will provide Henry County
Parks & Recreation with a modern, safe, fully accessible, and tournament-quality athletic
facility that enhances player safety, improves field performance and drainage, strengthens
operational efficiency, modernizes the concession and support facilities, showcases the
identities of Henry County Parks & Recreation and the City of McDonough through
custom branding elements, and provides a premier destination for Sunshine League
activities, youth athletics, league play, regional tournaments, and community events for
decades to come.
This version now mirrors the Hidden Valley phasing language while accounting for Richard
Craig's layout and should give bidders clear expectations that Phase One must be
completed, accepted, and returned to service before Phase Two begins.
The Richard Craig Park Athletic Complex Renovation is a comprehensive turnkey
modernization of one of Henry County Parks & Recreation's premier baseball and softball
facilities. The project includes the complete renovation of eight conventional baseball and
softball fields, the Sunshine League therapeutic field, and all associated site
improvements. Work includes, but is not limited to, selective demolition; laser grading and
reconstruction of athletic field surfaces; drainage improvements; complete replacement
of irrigation systems; installation of certified 419 Bermuda sod; reconstruction of skinned
infields; installation of new galvanized athletic fencing, backstop systems, overhead
netting, custom backstop padding, custom windscreens, foul poles, dugout roof systems,
and associated field amenities; construction of new concrete sidewalks and accessibility
improvements; demolition of the existing score tower slab; renovation of the existing
batting cage facility; and restoration of all disturbed areas.
The Contractor shall serve as the single-source turnkey contractor and shall be
responsible for the coordination and completion of all trades necessary to deliver a fully
operational athletic complex. This responsibility shall include all electrical work
associated with the project, including but not limited to providing power to scoreboards,
irrigation controllers, electrical equipment, and any additional electrical infrastructure,
utility extensions, conduit, wiring, connections, or unforeseen electrical work required to
place all systems into complete operational service. The Contractor shall coordinate all
electrical work with the appropriate utility providers, permitting agencies, and the Owner to
ensure all systems are installed, tested, commissioned, and fully functional upon project
completion.
Accessibility is a primary objective of this project. All pedestrian routes, sidewalks, gates,
and site improvements shall be designed and constructed to exceed minimum ADA
accessibility requirements by providing wider pedestrian walkways, barrier-free
transitions, enhanced accessible routes, and improved access for athletes, spectators,
coaches, staff, and visitors of all abilities. The Sunshine League therapeutic field shall
receive specialized improvements that preserve and enhance its barrier-free playing
environment while maintaining its unique therapeutic and accessible design.
The Contractor shall include within the Base Bid a ten percent (10%) construction
contingency allowance to address unforeseen conditions, utility conflicts, concealed site
conditions, minor design adjustments, electrical modifications, and miscellaneous work
necessary to deliver a complete turnkey project. Expenditures from the contingency
allowance shall require prior written authorization from Henry County Parks & Recreation,
and any unused contingency funds shall be returned to the Owner through the final project
reconciliation.
Upon completion, Henry County Parks & Recreation will have a fully renovated, safe,
durable, and tournament-quality athletic complex that improves field playability, drainage
performance, accessibility, operational efficiency, and long-term maintainability. The
completed facility will support local recreation programs, Sunshine League activities,
league play, tournaments, and community events for many years to come.
1.2 Description
The project consists of the turnkey renovation of the Richard Craig Park Athletic Complex,
including eight conventional baseball and softball fields, the Sunshine League therapeutic
field, and all associated site improvements. The Work includes, but is not limited to,
selective demolition; earthwork; laser grading; drainage improvements; complete
replacement of irrigation systems; installation of certified 419 Bermuda sod;
reconstruction of athletic infields utilizing new athletic infield mix and topdressing;
installation of new 9-gauge galvanized chain-link fencing throughout the athletic
complex, with black vinyl-coated fencing at the Sunshine League therapeutic field;
installation of new 30-foot black powder-coated backstop support poles, overhead
backstop netting systems, pedestrian and maintenance gates, 20-foot black powder-
coated foul poles, custom black backstop padding, custom black windscreens featuring
the Henry County Parks & Recreation logo and the City of McDonough logo, home run
distance markers, dugout roof systems, new concrete sidewalks, accessible routes
exceeding minimum ADA requirements, miscellaneous site improvements, demolition of
the existing score tower slab, renovation of the existing batting cage facility, and
restoration of all disturbed areas. Upon completion, the Contractor shall provide a
complete, fully operational, turnkey athletic complex ready for immediate use by Henry
County Parks & Recreation.
1.3 Project Objective
The objective of this project is to provide Henry County Parks & Recreation with a modern,
fully accessible, tournament-quality athletic complex that exceeds minimum ADA
accessibility requirements while improving player safety, field performance, drainage,
operational efficiency, and long-term facility sustainability. The Contractor shall furnish all
labor, supervision, materials, equipment, transportation, tools, permits, and incidentals
necessary to deliver the project as a complete turnkey installation.
1.4 Owner
The Owner is Henry County Parks & Recreation. The Owner will provide construction
drawings, project specifications, and the intended layout of the athletic complex. The
Contractor shall verify all field dimensions, utility locations, grades, and existing site
conditions prior to the commencement of construction.
2. Turnkey Intent and Single-Prime
Responsibility
2.1 Single-Prime Responsibility
The Contractor shall serve as the single point of responsibility for the complete execution
of the Work and shall coordinate all subcontractors, suppliers, and specialty trades
necessary to deliver a fully operational athletic complex.
2.2 Turnkey Delivery
The Work shall be provided as a complete turnkey project. The Contractor shall furnish all
labor, supervision, materials, equipment, transportation, tools, testing, inspections, and
incidental items required for a complete installation, whether specifically identified within
this Scope of Work or reasonably necessary to produce the intended finished product.
2.3 Verification of Existing Conditions
Prior to beginning construction, the Contractor shall verify all existing site conditions, field
dimensions, grades, utility locations, and quantities. Any discrepancies shall be reported
to the Owner before construction proceeds.
2.4 Project Coordination
The Contractor shall coordinate construction activities with Henry County Parks &
Recreation to minimize disruptions to ongoing park operations. Safe pedestrian access
shall be maintained whenever practical, and all construction areas shall be properly
secured, protected, and identified throughout the duration of the project.
3. General Requirements
3.1 Permits and Regulatory Compliance
The Contractor shall obtain all permits, licenses, inspections, and approvals required to
complete the Work. All construction shall comply with applicable federal, state, and local
regulations, including accessibility requirements, erosion and sediment control
regulations, environmental requirements, and applicable building codes.
3.2 Safety and Site Security
The Contractor shall maintain a safe, clean, and secure construction site throughout the
project. Appropriate barriers, fencing, erosion control measures, signage, and traffic
control devices shall be provided as necessary to protect park visitors, employees, and
construction personnel.
3.3 Utility Locates
The Contractor shall be responsible for locating and protecting all existing underground
and overhead utilities prior to excavation or demolition. Any damage to existing utilities
resulting from construction operations shall be repaired at no additional cost to the
Owner.
3.4 Project Scheduling and Submittals
The Contractor shall provide a detailed construction schedule, shop drawings, product
data, material submittals, quality control documentation, and other information necessary
for project coordination and execution.
3.5 Mobilization
The Contractor shall furnish all temporary facilities, equipment, utilities, erosion control
measures, storage areas, and project support necessary to perform the Work.
Construction limits shall be clearly identified and protected throughout the duration of the
project.
3.6 Protection of Existing Facilities
The Contractor shall protect all existing facilities, utilities, sidewalks, roadways,
landscaping, structures, and improvements designated to remain. Any damage caused by
construction activities shall be repaired or replaced at no additional cost to the Owner.
3.7 Demolition and Removal
The Contractor shall perform all demolition necessary to complete the project, including
removal and legal disposal of existing turf, fencing, concrete, structures, utilities, and
miscellaneous site improvements as required by the construction documents. All
demolition debris shall be removed from the project site and legally disposed of off-site.
3.8 Site Cleanup
The Contractor shall maintain the project site in a clean and orderly condition throughout
construction. Upon completion of the Work, all construction debris, excess materials,
temporary facilities, and equipment shall be removed from the site, leaving the athletic
complex in a clean, finished, and operational condition.
4. Athletic Field Renovations (Fields 1-8)
4.1 General Scope
The Contractor shall renovate all eight conventional baseball and softball fields to provide
safe, properly drained, tournament-quality playing surfaces suitable for youth and adult
athletics. Work shall include, but not be limited to, selective demolition, removal of
existing turf and unsuitable materials, subgrade preparation, laser grading, drainage
corrections, irrigation improvements, installation of certified 419 Bermuda sod,
reconstruction of skinned infields utilizing athletic infield mix, application of topdressing,
fine grading, and restoration of all disturbed areas. All work shall conform to the Owner's
approved field layout and final grades.
4.2 Field Renovation Quantities
Infield
Field 419 Bermuda Sod Topdressing
Mix
Field
18,000 SF 10 Tons 40 Tons
1
Field
3,500 SF 10 Tons 7 Tons
2
Field Field quantities to be verified in the field by the
3 Contractor.
Field
10,500 SF 40 Tons 22 Tons
4
Field
12,000 SF 40 Tons 25 Tons
5
Field
25,650 SF 20 Tons 55 Tons
6
Field
4,000 SF 20 Tons 9 Tons
7
Field
9,000 SF 20 Tons 20 Tons
8
The quantities listed above are approximate and shall be verified by the Contractor prior to
construction.
4.3 Field 1
The Contractor shall remove and dispose of all existing turf, loosen the subgrade, and laser
grade the entire field to establish proper drainage. Irrigation components shall be repaired
or replaced as required following field evaluation. Excess material shall be removed from
the site. The Contractor shall install approximately 18,000 square feet of certified 419
Bermuda sod, 10 tons of athletic infield mix, and 40 tons of topdressing or as required by the
final field dimensions. Upon completion, the field shall be fine graded to provide a smooth,
safe, and properly drained playing surface.
4.4 Field 2
The Contractor shall remove and dispose of existing infield turf, loosen the subgrade, and
laser grade the infield to match the outfield elevations. Irrigation shall be repaired or
replaced as required. Excess material shall be removed from the site. The Contractor shall
install approximately 3,500 square feet of certified 419 Bermuda sod, 10 tons of athletic
infield mix, and 7 tons of topdressing or as required by the final field dimensions. The
completed field shall be fine graded to provide a uniform playing surface.
4.5 Field 3 - Sunshine League Therapeutic Field
The Contractor shall renovate Field 3, the Sunshine League Therapeutic Recreation Field,
to provide a safe, durable, and fully accessible recreational playing environment designed
for athletes of all abilities. The existing field shall be renovated while preserving and
enhancing its therapeutic purpose and inclusive design.
Work shall include demolition and removal of existing surface materials as required;
subgrade preparation; laser grading; drainage improvements; irrigation modifications as
necessary; installation of a new ADA-accessible cushioned safety playing surface with
impact-attenuating padding; accessible transitions between all adjacent sidewalks, gates,
dugouts, and spectator areas; and restoration of all disturbed areas.
The Contractor shall furnish and install a complete therapeutic playing surface system
specifically designed for adaptive recreation and inclusive athletic programming. The
finished surface shall provide a safe, slip-resistant, cushioned, and barrier-free
environment that minimizes fall impacts while allowing unrestricted wheelchair mobility
and accessibility.
All entrances, gates, walkways, player areas, dugouts, spectator viewing areas, and field
access points serving the Sunshine League Field shall exceed minimum ADA accessibility
requirements and provide safe, continuous access for participants, caregivers, coaches,
officials, and spectators of all abilities.
Final field dimensions, materials, and surface system shall conform to the approved
construction drawings and manufacturer's installation requirements.
4.6 Field 4
The Contractor shall remove and dispose of existing infield turf and approximately 6 feet of
turf lip surrounding the infield. The subgrade shall be loosened, and laser graded to match
the outfield elevations. Irrigation shall be repaired or replaced as required. Excess material
shall be removed from the site. The Contractor shall install approximately 10,500 square
feet of certified 419 Bermuda sod, 40 tons of athletic infield mix, and 22 tons of
topdressing or as required by the final field dimensions. The completed field shall be fine
graded to establish positive drainage and a smooth playing surface.
4.7 Field 5
The Contractor shall remove and dispose of existing infield turf and approximately 10 feet
of turf lip surrounding the infield. The subgrade shall be loosened, and laser graded to
match the outfield elevations. Irrigation shall be repaired or replaced as required. Excess
material shall be removed from the site. The Contractor shall install approximately 12,000
square feet of certified 419 Bermuda sod, 40 tons of athletic infield mix, and 25 tons of
topdressing or as required by the final field dimensions. Final grading shall provide a smooth,
properly drained playing surface.
4.8 Field 6
The Contractor shall remove and dispose of all existing turf, loosen the subgrade, and laser
grade the entire field. Irrigation shall be repaired or replaced as required. The Contractor
shall install approximately 25,650 square feet of certified 419 Bermuda sod, 20 tons of
athletic infield mix, and 55 tons of topdressing or as required by the final field dimensions.
Final grading shall establish positive drainage and a uniform playing surface.
4.9 Field 7
The Contractor shall remove and dispose of existing infield turf, loosen the subgrade, and
laser grade the infield to match the outfield elevations. Irrigation shall be repaired or
replaced as required. Excess material shall be removed from the site. The Contractor shall
install approximately 4,000 square feet of certified 419 Bermuda sod, 20 tons of athletic
infield mix, and 9 tons of topdressing or as required by the final field dimensions. The
completed field shall be fine graded to final elevations.
4.10 Field 8
The Contractor shall remove and dispose of all existing turf, loosen the subgrade, and laser
grade the entire field. Irrigation shall be repaired or replaced as required. The Contractor
shall install approximately 9,000 square feet of certified 419 Bermuda sod, 20 tons of
athletic infield mix, and 20 tons of topdressing or as required by the final field dimensions.
Final grading shall establish a smooth, safe, and properly drained playing surface.
4.11 General Field Finishes
Following installation of sod, athletic infield mix, and topdressing, the Contractor shall fine
grade each field to its final design elevations. Finished grades shall promote positive
drainage away from playing surfaces while maintaining consistent slopes and transitions.
The Contractor shall provide watering, mowing, fertilization, weed control, and general
maintenance necessary to establish healthy turf until final acceptance by the Owner.
4.12 Quality Requirements

With GovernmentContracts, you can:
Follow Repair/Overhaul of Flat Panel Up Front Controller (FPUFC) Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 11/25/2026
Project Project No. Advertise Date Bid Date Chattahoochee River Trail, Phase II GDOT
Cobb County Transportation
Bid Due: 1/15/2027
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-33658-NONST-2027-000000005
State Government of Georgia
Bid Due: 11/23/2026
BL152-26 NOT Beaver Ruin Diversion Pump Station Grinders Replacements Project Buyer Contact :
Gwinnett County
Bid Due: 11/20/2026