Project Description: The scope of the Middletown Stormwater Pipe Lining Project consists of rehabilitating approximately 970 linear feet of storm sewer system with cured-in-place resin impregnated lining or another type of rehabilitation as approved by the Township Engineer. Pipes will be assessed to determine urgency of rehabilitation; additional locations will be included as alternates.
The Contractor shall chemically seal all necessary joints. The grout or chemical joint sealant shall have a root inhibitor admixture. The Engineer or Resident Inspector will advise the Contractor where to perform "if and where directed" work. All stormwater pipes must be inspected from access point to access point (inlet, manhole, etc.). The limits of the work are shown on the contract plans.

With GovernmentContracts, you can:
...Project: Manor and Alderfer Road Sewer Replacement Ref. #: Lower Salford Township Authority... ...
PennBid
Bid Due: 12/09/2026
...Hill - Sewer Upgrade Description: This PROJECT IS A STANDARD LOW BID PROJECT ...
State Government of Pennsylvania
Bid Due: 12/10/2026
...Project: 2027 Small Diameter Sewer Rehabilitation - IDIQ Ref. #: 2027-400-103-0 (2026-176) Type... ...
Pittsburgh Water & Sewer Authority
Bid Due: 11/17/2026
...Project: Gravel Ridge Road Sewer Extension Project Ref. #: Middle Smithfield Township, Monroe... ...