Security fence at Coast Guard Air Station Clearwater Florida

Location: Florida
Posted: Aug 4, 2026
Due: Aug 14, 2026
Agency: HOMELAND SECURITY, DEPARTMENT OF
Type of Government: Federal
Category:
  • 56 - Construction and Building Materials
Solicitation No: 70Z02826Q0000102
Publication URL: To access bid details, please log in.
Follow
Security fence at Coast Guard Air Station Clearwater Florida
Active
Contract Opportunity
Notice ID
70Z02826Q0000102
Related Notice
Department/Ind. Agency
HOMELAND SECURITY, DEPARTMENT OF
Sub-tier
US COAST GUARD
Office
BASE MIAMI(00028)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
  • Updated Published Date: Aug 04, 2026 11:34 am EDT
  • Original Published Date: Jul 14, 2026 12:32 pm EDT
  • Updated Date Offers Due: Aug 14, 2026 03:00 pm EDT
  • Original Date Offers Due: Aug 14, 2026 03:00 pm EDT
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Aug 29, 2026
  • Original Inactive Date: Aug 29, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: 5660 - FENCING, FENCES, GATES AND COMPONENTS
  • NAICS Code:
    • 238990 - All Other Specialty Trade Contractors
  • Place of Performance:
    Clearwater , FL 33762
    USA
Description View Changes

08/04/2026 Amendment A00003: RFI #3 Q&A for fencing project:



Fence security topping: The Statement of Work specifies three strands of barbed wire. Please confirm that razor ribbon or concertina wire is not required and identify the exact fence and gate sections that require the three strands.



A: The SOW has been updated to include concertina wire on section A and B.



Gate A electrical power: Please confirm the exact electrical panel or connection point, available voltage, phase, amperage and breaker capacity, approximate routing distance, and whether the contractor must provide all breakers, disconnects, trenching, conduit, conductors, grounding, patching and final connections.

A: Power is available for the gate operator at 220V/120V. The Contractor shall provide all labor, materials, equipment, trenching, conduit, conductors, fittings, and associated components necessary to run electrical power from the electrical panel to the gate operator. The Coast Guard will upgrade the existing knife switch to a NEMA 4 breaker panel with breakers for the gate operator.



-New panel specifications: 220V/120V, 125 amps rating, 1 phase 3 wire circuit configuration, with 6 circuits.



Gate A camera system: Please identify the required camera specifications or approved manufacturer/model, power and data requirements, camera-feed termination point, existing network or recorder connection, recording-retention requirements, monitoring requirements, and any Government-furnished equipment.



A: Please provide a standalone security camera, or one incorporated into the keypad, with motion detection and memory card capability. No specific brand or model is required.



Gate A access control: Please confirm that two keypads are required—one for entry and one for exit—and whether they are intended to operate as standalone PIN devices or connect to an existing Government access-control system. Please also identify any required credential format, programming, database or head-end interface.



A: Two keypads are required, one for entry and one for exit. The keypads shall operate as a standalone PIN-based system and shall be capable of storing a minimum of 250 user codes. No connection to an existing Government access-control system, credential format, programming database, or head-end interface is required.



Division of work: May the prime contractor divide the work between a fence/gate subcontractor and a separately licensed electrical/security subcontractor, provided the completed system is fully integrated, tested and operational?



A: Yes. The prime contractor may divide the work between a fence/gate subcontractor and a separately licensed electrical/security subcontractor, provided the completed system is fully integrated, tested, and fully operational upon completion.



Permits and engineering: Please confirm whether the contractor must provide local permits, stamped shop drawings, wind-load calculations, engineered gate foundations, concrete testing or other third-party inspections.



A: No local permits, stamped shop drawings, wind-load calculations, engineered gate foundations, concrete testing, or other third-party inspections are required.



The contractor shall install the chain-link security fence and gates in accordance with manufacturer specifications, including all posts, fabric, fittings, hardware, concrete footings, and gate accessories required for a complete and secure installation.



Domestic material requirements: Please confirm whether Buy American, Buy America or any other domestic-content requirements apply to the fencing, gate operator, electrical, access-control and camera equipment, and identify any required certifications.



A: Domestic-content requirements, including Buy American, Buy America, or other applicable requirements, shall apply to the extent required by the solicitation, contract, and incorporated clauses. The contractor is responsible for complying with all applicable domestic-content requirements for the fencing, gate operator, electrical, access-control, and camera equipment. Any required certifications, country-of-origin documentation, or manufacturer compliance statements shall be provided as required by the contract documents or upon Government request.







08/03/2026 Amendment A00002: RFI #2 Q&A for fencing project:




  1. Please clarify the documents needed for proposal submission.

    1. Is there an SF1442 form? No, please provide quote via email on company letterhead to Jerry.Lopez@uscg.mil

    2. Notice is SAM states “The GOVT will award … “Lowest Price, Technically Acceptable”. Please confirm what technical information is required to be submitted with this proposal. Technical proposal shall include vendors plan to perform work requested within SOW and if used, shall also include name of Sub-Contractor and subs past performance related to this type of work.



  2. SOW does not mention period of performance. Please confirm the number of days all work is required to be completed within.

    1. To be completed within 30 days.



  3. Please confirm whether a signed and sealed as-built survey is required after construction is completed.

    1. Signed and sealed as-build survey not required.



  4. Please provide brand and model of new security camera or base standard to follow.

    1. Please provide a standalone security camera, or one incorporated into the keypad, with motion detection and memory card capability. No specific brand or model is required.



  5. During site walk, the existing fence had razor ribbon. New razor ribbon is not mentioned in the SOW as part of the barbed wire. Please confirm if this is required to be installed along with the 3 strands of straight barbed wire.

    1. The SOW has been updated and attached to this solicitation to include concertina wire on section A and B.



  6. Existing chain link fence is 6’. SOW states new fence is to be 8’. Please confirm that the new fence is to be 8’ plus the height of the barbed wire (approximately 1 foot height) for a total of 9’.

    1. The SOW has been updated. Sections A and B will match the existing height of 6 feet. The orange line, representing the back fence in Section C, will remain at 8 feet.



  7. Please confirm if any new signage required to be hung on the new fence or new gates as part of this SOW.

    1. No requirements from the contractor to install new signage.



  8. Sow does not state what type of operator for the gate. Please provide a make/model for the new operator.

    1. The SOW states that a gate operator is required, including all materials necessary to complete the installation. The facility has 220/120 voltage available. A picture of the current gate operators at the facility is attached in a word document for reference.







07/29/2026 Amendment A0001: RFI Q&A for fencing project.



Demolition portion:



Q: Will we be able to cut current posts off at ground level and leave in place, or would you like each of the posts and concrete removed and subsequently backfilled?

A: Post and concrete shall be removed and backfilled.



Q: During existing fence removal, will there be anyone available to assist in moving vehicles away from fence? It seems like some of them are very close and we want to take every precaution against damage.

A: The unit will make the notification to have the owner move their vehicles away from the fence. These items will be coordinated during the preconstruction meeting after the project has been awarded.



New Fencing:



Q: There seems to be a small bridge at the corner of the lot. Will the new fencing go past this in a straight line to a predetermined point on the existing fence?

A: Enclosure 2, orange line (C) on the SOW: The new fence will not extend beyond the bridge; it will run straight across.



Gates:



Q: Gate A- ‎Currently seems to be a double mechanical gate - Swap to a sliding 26' powered gate.

A: That is correct.

Q: Enclosure 3 on the pictures, lists that a mechanical cypher lock and camera are to be installed which differs from the scope of work. Will gate-A have an electronic keypad at the entrance AND exit, and where will the camera be mounted and where does the camera feed need to go?

A: Camera will be mounted on the entrance of Gate A to capture vehicles coming in. No camera will be used on gate C.



Q: Gate C - Proposing to create a 72" wide swing gate with mechanical cypher locks on each side to give enough space for the 60" mower requirement

A: Install a swinging gate with a minimum 60-inch opening and a cipher lock. Example attached sample picture in word document.



End..





This combined synopsis/solicitation for construction services is prepared in accordance with the format in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional information included in this notice. This synopsis/solicitation is being advertised as Small Business Set-Aside only. This announcement constitutes the only solicitation; no separate written solicitation will be issued.



The solicitation number is 70Z02826Q0000102. Applicable North American Industry Classification Standard (NAICS) codes are:



238990 All Other Specialty Trade Contractors , Size standard in millions ($19.0)



This requirement is for a firm fixed price construction contract. The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13

The Government will award a contract resulting from this solicitation to the proposer responsible, whose offer conforming to the solicitation will be most advantageous to the Government, Lowest Price, Technically Acceptable.

Anticipated award date: 10 business days after close of solicitation, OOA 28 August 2026



Quotes are to be received no later than close of business (3 p.m.) on 14 August 2026. Quotes can be emailed to: Jerry.Lopez@uscg.mil



Telephone requests of quotes will not be accepted, a formal notice of changes (if applicable) will be issued in Sam.Gov



Wage determination: FL20260266 05/18/2026



SCOPE OF WORK: Contractor shall provide all labor, supervision, materials and equipment for the removal of approximately 400 feet of fence; the addition of approximately 270 feet of 8ft industrial fence with barbed wire; a large non powered gate with cypher lock, gate wide enough for a commercial lawn mower to pass through and a powered gate with pin pad for entry and exit into the space approximately 26 feet wide. See attached SOW for details.



Location:



USCG Air Station Clearwater

15100 Rescue Way

Clearwater, FL 33762

Attn: Jose Calderon



Period of Performance: Work is expected to commence at NLT 10 business days after award is made and submitted to awardee. Anticipated award date: 28 August 2026



Site visit: It is highly recommended and encouraged that a site visit is performed at the unit to field verify the requirements within the SOW and speak with the unit POC for this project.

A site visit date has been set for Wednesday July 29th at 1030. Vendors are to coordinate their attendance with unit personnel listed below. Vendor must ensure company personnel attending site visit have a proper government issued ID in order to gain access to the Air station grounds.



Unit POC's: CWO Joe Calderon, Email: Jose.A.Calderon@uscg.mil 727-423-7586 (cell phone)



or



MKC Mike Hemmingway, email: Jonathan.M.Hemmingway@uscg.mil 727-535-1437 x1573



Q&A’s: Questions concerning the work requested must be sent via email to Jerry.Lopez@uscg.mil by COB 31 July 2026. These Q&A’s will be answered and posted to this solicitation as an amendment to solicitation prior to closing.



Applicable Far Clauses:



52.222-90 Addressing DEI Discrimination by Federal Contractors



Construction-Specific Clauses (FAR Subpart 36.5)




  • 52.236-2 Differing Site Conditions: Protects the contractor if subsurface or physical conditions differ materially from those indicated in the contract.

  • 52.236-3 Site Investigation and Conditions Affecting the Work: Requires the contractor to investigate the site and conditions before bidding.

  • 52.236-5 Material and Workmanship: Requires all materials to be new and of the most suitable grade unless otherwise specified.

  • 52.236-7 Permits and Responsibilities: Holds the contractor responsible for getting all necessary licenses, permits, and complying with federal, state, and local laws.

  • 52.236-13 Accident Prevention: Requires contractors to provide a safe work environment and comply with relevant safety and health standards (e.g., OSHA).



Labor Standards



For construction projects over $2,000 in the United States, solicitations must include wage rate and labor standards requirements:




  • 52.222-6 Construction Wage Rate Requirements: Mandates that mechanics and laborers are paid the prevailing local wages as determined by the Department of Labor.

  • 52.222-11 Subcontracts (Labor Standards): Requires contractors to flow down wage requirements to all subcontracts.



Socioeconomic Clauses




  • 52.219-14 Limitations on Subcontracting: Limits the percentage of work that a small business prime contractor can subcontract to other businesses.



4. General Contract Clauses




  • 52.232-5 Payments under Fixed-Price Construction Contracts: Details the procedures and requirements for progress payments.

  • 52.249-10 Default (Fixed-Price Construction): Outlines the government's rights if the contractor fails to prosecute the work with the diligence required or fails to complete it on time.



Work hours: Monday through Friday, 0800 – 1500 (8 am – 3 pm) No weekends or Holidays authorized.



See attached applicable FAR Clauses by reference.



Offerors may obtain full text version of these clauses electronically at: www.arnet.gov/far



The following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this solicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006); Contracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR clauses may be obtained electronically at http://www.dhs.gov.



Request Company’s tax ID information and UEI number.



Vendors providing an offer must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an “ACTIVE” status prior to award.



Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to perform this type of service.


Attachments/Links
Contact Information
Contracting Office Address
  • 100 MACARTHER CAUSEWAY MIAMI FL 33139
  • MIAMI , FL 33132
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Jul 14, 2026[Combined Synopsis/Solicitation (Original)] Security fence at Coast Guard Air Station Clearwater Florida
Jul 29, 2026[Combined Synopsis/Solicitation (Updated)] Security fence at Coast Guard Air Station Clearwater Florida
Aug 3, 2026[Combined Synopsis/Solicitation (Updated)] Security fence at Coast Guard Air Station Clearwater Florida
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Vehicle Wash Rack System Installation -- Tyndall Air Force Base Active Contract

DEPT OF DEFENSE

Bid Due: 8/07/2026

Follow U.S. Navy (USN) Tactical Combat Training System Increment II (TCTS II) and

DEPT OF DEFENSE

Bid Due: 8/20/2026

Follow Audio and Video Upgrade Active Contract Opportunity Notice ID FA282326QA107 Related Notice

DEPT OF DEFENSE

Bid Due: 8/11/2026

Project ID: NOIS #NMBW-2026-03 Title: NOTICE OF INTENT TO SOLICIT: Guaranteed Energy, Water,

City of North Miami Beach

Bid Due: 8/21/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.