St. Louis District, Great Rivers Greenway, Brickline Greenway North Connector Phase 3 construct greenway trail, new sidewalk, street reconfiguration, signals, lighting, and landscaping along Spring Avenue between Washington Avenue and Lindell Boulevard

Location: Missouri
Posted: Aug 27, 2026
Due: Sep 24, 2026
Agency: Missouri Department of Transportation(MDOT)
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
Status Bid Advertisement Post Date Revision Date Letting Date
NEW St. Louis District, Great Rivers Greenway, Brickline Greenway North Connector Phase 3 construct greenway trail, new sidewalk, street reconfiguration, signals, lighting, and landscaping along Spring Avenue between Washington Avenue and Lindell Boulevard 8/27/26 9/24/26

Attachment Preview

BRICKLINE GREENWAY NORTH CONNECTOR PHASE 3
NOTICE TO CONTRACTORS
Sealed bids for Brickline Greenway North Connector Phase 3 TAP -5401(721) will be received
by Great Rivers Greenway at 3745 Foundry Way, Suite 253, St. Louis, MO 63110 until 2:00
o'clock P.M. (Prevailing Local Time) on September 24, 2026 , and at that time will be publicly
opened and read. The suggested method of submitting bids is electronically. Bids may be
submitted electronically via the Bid Express website at www.bidexpress.com .
Construction of the Brickline Greenway North Connector Phase 3 (Washington Avenue to
Lindell Boulevard) includes the greenway trail and new sidewalk, curbs, unit pavers, street
reconfiguration, signals, street and pedestrian lighting, utilities, trees, lan dscaping, irrigation,
trail signage and wayfinding, and site furniture. The work consists of furnishing all material,
labor, tools, equipment, and supervision necessary .
Hard copies of the Bid Documents can be obtained from Cross Rhodes Reprographics, 2731 S
Jefferson Ave, St. Louis, MO 63118, (314) 678 -0087. The Contractor is responsible for the
drawing costs.
A Pre -Bid Conference will be held on September 3 , 2026, at 10:30 A.M. prevailing Central time
at Great Rivers Greenway office at 3745 Foundry Way, Suite 253, St. Louis, Missouri 63110.
The pre -bid conference will also be held virtually via Zoom. Login Information is listed here:
https://us02web.zoom.us/j/85793124835?from=addon
Meeting ID: 857 9312 4835
Questions should be directed via the solicitation on Bid Express. All requests for clarification
on these bidding documents must be received in writing by September 8, 2026, at 2:00 P.M.
prevailing Central time .
All labor used in the construction of this public improvement shall be paid a wage no less
than the prevailing hourly rate of wages of work of a similar character in this locality as
established by the Department of Labor and Industrial Relations (Federal Wage Rate), or
state wage rate, whichever is higher.
Great Rivers Greenway hereby notifies all bidders that it will affirmatively ensure that in any
contract entered into pursuant to this advertisement, businesses owned and controlled by
socially and economically disadvantaged individuals will be afforded full opportunity to
sub mit bids in response to this invitation and will not be discriminated against on the grounds
of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an
award."
All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 from the current
version of the Missouri Standard Specifications for Highway Construction, including all
revisions. The contractor questionnaire must be on file 7 days prior to bid opening.
Contractors and sub -contractors who sign a contract to work on public works projects
provide a 10 -Hour OSHA construction safety program, or similar program approved by the
Department of Labor and Industrial Relations, to be completed by their on -site employees
within sixty (60) days of beginning work on the construction project.

A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each
proposal.
Great Rivers Greenway reserves the right to reject any or all bids.
The Disadvantaged Business Enterprise ( DBE ) Goal for this project has been established by
the Missouri Department of Transportation and is zero (0%).

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

.... - Construction of a new tertiary filtration process, including construction of a ...

City of Salem

Bid Due: 10/20/2026

...Status Bid Advertisement Post Date Revision Date Letting Date NEW STL District, St ...

Missouri Department of Transportation(MDOT)

Bid Due: 10/02/2026

...General Leonard Wood Army Community Hospital requires the construction of new hospital parking ...

DEPT OF DEFENSE

Bid Due: 10/09/2026

...KANSAS CITY Office W071 ENDIST KANSAS CITY Looking for contract opportunity help? (opens ...

DEPT OF DEFENSE

Bid Due: 9/28/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.