Project Description: The work generally consists of, but is not limited to, construction of approximately 23,000 linear feet of PVC gravity sewer ranging in diameter from 8-inch to 30-inch, 21,600 linear feet of force main trench including multiple pipes per trench ranging in diameter from 2-inch to 14-inch, 4,100 linear feet of 2-inch PVC low-pressure sewers, and four new wastewater pump stations, including all structures and appurtenances. The work includes three bid alternates. The Owner may choose, at their option, to include the alternates as outlined in Specification Sections 00301 and 01014 in the order provided.
Contractors must be MassDOT prequalified in the following Class of Work: Sewer and Water, with a minimum MassDOT single Class of Work Limit of $50,000,000.

With GovernmentContracts, you can:
...approximately 1,200 linear feet of 12-inch DI water main along Grammar Road approximately ...
Wright-Pierce
Bid Due: 6/18/2026
...Lower Artichoke Raw Water Pump Station Upgrades Bid Number: IFB No. 26-23 Start ...
Newburyport city