| Location: | Oklahoma |
|---|---|
| Posted: | Apr 15, 2025 |
| Due: | May 6, 2025 |
| Agency: | City of Broken Arrow |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
This project will produce Engineering Report and Design for an approximately 1-mile section of the Lynn Lane Trunk Sewer line. This Project consists of Design of an approximately 1-mile section of the Lynn Lane Trunk Sewer Line located from 500 feet North of E Jasper Street to just North of E Tucson Street. The existing Trunk Sewer Line is composed of 18” Clay Pipe and brick Manholes. This line has had several issues and has started deteriorating due to age and material, causing leaks and problems with Inflow and Infiltration. To remedy these issues, BAMA has proposed to rehabilitate and potentially upsize this Trunk Sewer Line and associated Manholes. The selected Consultant will need to determine an appropriate size and material for the Trunk sewer to ensure it will be able to handle current load capacities and future developments, and produce design plans for construction to address these issues.

With GovernmentContracts, you can:
...Project Number - SW-2023-01-03 Project Title - Storm Sewer Replacement at 3939 S. ...
City of Tulsa
Bid Due: 7/10/2026
...Follow CONTRACTOR SHALL FURNISH AND INSTALL SEWER SERVICE LINE FOR SR 6754 IN ...
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 6/17/2026
...or Services Requested : Topsoil Department: Water & Sewer NIGP Commodity Code(s): 790-70...
City of Tulsa
Bid Due: 7/01/2026
...- NSWWTP Department: Water and Sewer NIGP Commodity Code(s): 988-36 Solicitation Schedule EVENT ...
City of Tulsa
Bid Due: 7/01/2026