RFB NO. 25-1486-01 Runway 18R Precision Approach Path Indicator (PAPI) – Construction

Location: Tennessee
Posted: Aug 27, 2026
Due: Sep 15, 2026
Agency: Memphis International Airport
Type of Government: State & Local
Category:
  • 63 - Alarm, Signal, and Detection Systems
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Bid / RFP / RFQ Name Date Issued Sealed Bids will be received by:
Runway 18R Precision Approach Path Indicator (PAPI) – Construction
RFB NO. 25-1486-01
August 18, 2026 September 15, 2026 at 2pm Local Time
BID OPENING

Within 30 minutes thereafter, the bids will be opened and publicly read at the Procurement Warehouse Conference Room (4150 Louis Carruthers Drive, Memphis, TN) and via phone/video conference.

Bid Opening Virtual Link
https://teams.microsoft.com/meet/256552394848230?p=X6rqsVHcvlmkq6Scsr

Meeting ID: 256 552 394 848 230
Passcode: TD7yw39J


Bid Opening Call-In Option
Phone: (872) 242-8851; Conference ID: 358 857 03#

PRE-BID MEETING

A Virtual Pre-Bid Meeting was held Wednesday, August 26, 2026, at 11:00 a.m. local time via phone/video conferencing.

Presentation
Attendee List

SITE VISIT
A site visit was held after the virtual pre-bid meeting. If additional site visits are needed, please request by emailing bidquestions@flymemphis.com . You must include project name and number in subject line. We will accommodate if able, but not guaranteed.
DOCUMENTS

QUESTIONS
Send questions to bidquestions@flymemphis.com ; include project name and number in subject line.  Deadline for Questions will be Thursday, September 3, 2026, at 5:00p local time.  Questions submitted before the deadline will be answered via Addendum.

LEGAL NOTICE
Please click here to download the Legal Notice.

Attachment Preview

Memphis-Shelby County Airport Authority
Memphis, Tennessee
Attachment A
Detailed Scope of Work/Project Requirements
1) Summary of Work and Sequence
a. Summary
i. The "Work" of this contract is to construct a new FAA Precision Approach Path Indicator
(PAPI) on Runway 18R at Frederick W. Smith International Airport. Overall scope
includes installation of FAA provided PAPI Equipment and associated
utilities/infrastructure. The work includes PAPI equipment installation, underground
electrical installation (conduit and cable), concrete pad, erosion control, and sodding.
The general contractor must have experience with airfield electrical and Navigation Aid
(NAVAID)/Visual Aid (VISAID) equipment.
ii. Work shall be constructed in accordance with Plans and Specifications included in
attachment B and C.
b. Project Phasing and Completion
i. This is a fixed-duration Contract required to be substantially completed within thirty-
four (34) calendar days from the Notice to Proceed ("NTP") date.
ii. The actual NTP date will be negotiated and mutually agreed by both parties (Owner and
Contractor) prior to issuance of the NTP. If mutual agreement cannot be reached
between the parties, the Owner reserves the right to establish the actual Notice to
Proceed date. The NTP letter will state the date on which the Contractor will begin
construction and from which date contract time will be charged. Contractor shall be
mobilized and on site ready for work on the date stated in the Notice to Proceed.
iii. All days are calendar days.
iv. Work is permitted 24 hours per day, 7 days per week.
v. Project Phasing must be in accordance with Plans and Specifications included in
attachment B and C. There are 2 defined phases on this project. Work in the Runway
Safety Area requiring runway closures are only permitted in Phase 2.
vi. The Contractor shall proceed with the work at such rate of progress to ensure full
completion within the specified duration and phasing. It is expressly understood and
agreed, by and between the Contractor and the Owner, that the contract time for the
completion of the work described herein is a reasonable time, taking into consideration
the average climatic and economic conditions and other factors prevailing in the locality
of the work.
vii. If the Contractor experiences weather related delays, he shall submit a report
documenting the weather conditions and delays, if any, experienced during any
calendar month.
viii. If the Contractor is prevented from working due to any other legitimate reason, he/she
shall notify the Owner in writing as per the Lump Sum Construction Contract of the
delay and request a corresponding increase in the number of contract days.
ix. The Owner shall be the sole judge as to whether or not a request for a contract time
extension is legitimate.
x. The Owner reserves the right to adjust limits of construction to accommodate the
Owner's requirements for maintenance of Airport Operations and Public Traffic with
REQUEST FOR BIDS 25-1486-01 ATTACHMENT A - PAGE 1 OF 4
RUNWAY 18R PAPI - CONSTRUCTION 8/18/2026

Memphis-Shelby County Airport Authority
Memphis, Tennessee
minimum interruption during the construction of this project. Any required adjustment
of limits of construction will be at no additional cost to the Owner.
2) Construction Safety Requirements
a. General
i. The Contractor shall be responsible for briefing all construction personnel on the
requirements contained in this section prior to their working in the construction area
and at periodic intervals throughout the course of the contract. These briefings will be
documented in writing.
b. Limitation on Construction
i. The limits of construction, material storage areas, equipment parking and other areas
defined as available for the contractor's exclusive use during construction shall be
identified and defined by the contractor prior to starting work on the project.
Temporary barricades, flagging and flashing caution lights may be required at access
points, taxiway crossings and pavement tie-ins. The type markings, barricades and
flashing caution lights are designated on the construction plans and must be inspected
and approved by the Airport Authority.
ii. The Contractor shall store all materials and park construction equipment, when not in
use only in the areas designated on the plans or during the pre-construction conference.
iii. Construction debris, waste, wrappings or loose material capable of causing damage to
aircraft engines, propellers, or landing gear shall not be allowed on active aircraft
movement areas. Material meeting this criteria shall be contained and removed
immediately from the AOA.
iv. Open flame, welding, or torch cutting operations are prohibited without a hotwork
permit issued by the Airport Authority and adequate fire and safety precautions have
been taken.
c. Construction Vehicle Traffic
i. Access to the construction site is as shown on the plans or as directed by the Owner. No
other access point is authorized unless designated in writing by the Airport Authority.
Construction traffic will operate only on designated haul routes within the construction
area limits.
ii. Drivers of construction vehicles will be knowledgeable of construction routes or will be
escorted by other Contractor or Owner designated personnel who are knowledgeable.
The Contractor will be responsible for traffic control in the various construction areas of
the work site. The Contractor will not permit unauthorized personnel or vehicles on the
construction site.
iii. The Contractor shall be responsible for immediate cleanup of any debris deposited
along construction routes, as result of his construction traffic.
iv. Directional signing at the construction access gate and along the delivery route to work
site temporary storage areas shall be as designated and approved by the Owner.
v. Construction vehicle identification shall be as prescribed in Section 11 of this RFB.
vi. No construction vehicle is authorized on any active AOA pavement surface or to enter
runway safety areas without specific authorization from the Owner.
REQUEST FOR BIDS 25-1486-01 ATTACHMENT A - PAGE 2 OF 4
RUNWAY 18R PAPI - CONSTRUCTION 8/18/2026

Memphis-Shelby County Airport Authority
Memphis, Tennessee
d. Reporting Property Damage or Personnel Injury
i. All persons involved in any accident whether personal injury, aircraft or automotive,
occurring on Airport property, shall make a full report to the Airport Police (922-8298)
as soon after the accident as possible. The report shall include, but not be limited to,
the names, addresses of all principals and witnesses, if known, and a statement of the
facts. Construction accidents fall under this category.
ii. In the event of personnel injury requiring ambulance response, the Airport Police
Dispatcher, upon notification, telephone 922-8333, will call the ambulance and arrange
Airport Police escort to the injury site. A written report will be prepared by the Airport
Police after the injury is treated.
3) Submittals
a. General
i. Except as otherwise specified below, as soon as practicable after contract award and
without causing delay in the work, submit submittals of all items for which submittals
are specified in other sections, and for all major submittal items whether specified in
other sections or not. All Submittals may be submitted electronically in lieu of hard
copies, if possible. Each submittal shall be clearly marked with the project name, dated,
and accompanied by a letter of transmittal listing all items included in the submittal and
referencing the project specification page and article numbers applicable to each item.
1. Submittals shall include all test results and/or certificate necessary to show that
the item conforms to the standards specified. Such standards shall include
ASTM, AASHTO, FAA, PCA, Federal Specifications or any other standard listed in
these specifications.
b. Submittal Review
i. After the Owner has reviewed the submittals, except as otherwise specified below,
submittals will be dated, and an electronic copy returned to the Contractor. If submittals
are rejected, in will include indications of the required corrections. Make such
corrections and changes as indicated. Resubmit submittals as specified above, as often
as required by the Owner to complete the review.
ii. Submittals reviewed by the Owner or Engineer will be a general review only, and
acceptance will not relieve Contractor or Subcontractor of responsibility for accuracy of
submittals, proper fitting, coordination, construction or work, and furnishing materials
and work required by Contract but not indicated on submittals. Review of submittals
shall not be construed as accepting departures from Contract requirements.
iii. Any material ordered, or work performed prior to obtaining an approved submittal shall
be at the Contractor's risk and subject to rejection.
4) Cleaning
a. Throughout the construction period, maintain the site in a standard of cleanliness as described
in this Section.
b. Conduct a daily inspection, and more often if necessary, to verify that cleanliness requirements
are being met.
c. Provide required personnel, equipment, and materials needed to maintain the specified
standard of cleanliness.
d. In addition to the standards described in this Section, comply with pertinent requirements of
governmental agencies having jurisdiction.
REQUEST FOR BIDS 25-1486-01 ATTACHMENT A - PAGE 3 OF 4
RUNWAY 18R PAPI - CONSTRUCTION 8/18/2026

Memphis-Shelby County Airport Authority
Memphis, Tennessee
e. Retain stored items in an orderly arrangement allowing maximum access, not impeding traffic or
drainage, and providing required protection of materials.
f. Do not allow accumulation of scrap, debris, waste material, and other items not required for
construction of this Work.
g. Inspect all haul vehicles leaving the site to make sure no debris can fall from the vehicle during
transportation.
h. Provide adequate storage for all items awaiting removal from the job site, observing
requirements for fire protection and protection of the ecology.
i. Daily, and more often if necessary, inspect the site and pick up all scrap, debris, and waste
material. Remove such items to the place designated for their storage. Contractor shall
document all daily inspections.
j. Weekly, and more often if necessary, remove, completely, all accumulated scrap, debris, and
waste material from the site.
k. Maintain the site in a neat and orderly condition at all times.
l. Prior to completion of the Work, remove from the job site all tools, surplus materials,
equipment, scrap, debris, and waste. Conduct final progress cleaning as described above.
REQUEST FOR BIDS 25-1486-01 ATTACHMENT A - PAGE 4 OF 4
RUNWAY 18R PAPI - CONSTRUCTION 8/18/2026

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.