| Location: | Massachusetts |
|---|---|
| Posted: | Jun 30, 2025 |
| Due: | Jul 21, 2025 |
| Agency: | Town of Hingham |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | WRWS61125 |
| Publication URL: | To access bid details, please log in. |
Project ID: WRWS61125
Title: Accord Pond Pipe and Apparatus Installation
Addenda: 2
Release Date: 6/18/2025
Due Date: 7/21/2025
The Town of Hingham owns and operates (through Weir River Water System) an existing pump house for the purposes of withdrawing water from Accord Pond. The pump system itself is housed in a structure that is approximately 36’x25’ and connects to a gate house before the main intake lines extend out to the pond.
According to available records there are currently two intake lines in the pond. One is an inactive, partially buried, 10” pipe that is connected directly to the pump house and extends approximately 400 feet into the pond. The active line exits the gatehouse before extending 50 +/- feet into the pond and is a 16” Cast Iron (C.I.) pipe.

With GovernmentContracts, you can:
66--Purchase of LSM 710 Confocal/2-Photon System with ConfocalLasers and 3 internal Confocal Dectoeors,
Department of Veterans Affairs
Bid Due: 9/10/2058
Solicitation Number: VA-797M-10-RQ-0030 Notice Type: Solicitation Synopsis: Added: Nov 30, 2009 12:59 pm
Department of Veterans Affairs
Bid Due: 12/07/2099
Login Help Quick Quotes Solicitations Contracts Forums Business Directory Join Fed Stimulus Resource
State Government of Massachusetts
Bid Due: 12/31/2099
Login Help Quick Quotes Solicitations Contracts Forums Business Directory Join Fed Stimulus Resource
State Government of Massachusetts
Bid Due: 12/31/2099