| Location: | Massachusetts |
|---|---|
| Posted: | Jun 30, 2025 |
| Due: | Jul 21, 2025 |
| Agency: | Town of Hingham |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | WRWS61125 |
| Publication URL: | To access bid details, please log in. |
Project ID: WRWS61125
Title: Accord Pond Pipe and Apparatus Installation
Addenda: 2
Release Date: 6/18/2025
Due Date: 7/21/2025
The Town of Hingham owns and operates (through Weir River Water System) an existing pump house for the purposes of withdrawing water from Accord Pond. The pump system itself is housed in a structure that is approximately 36’x25’ and connects to a gate house before the main intake lines extend out to the pond.
According to available records there are currently two intake lines in the pond. One is an inactive, partially buried, 10” pipe that is connected directly to the pump house and extends approximately 400 feet into the pond. The active line exits the gatehouse before extending 50 +/- feet into the pond and is a 16” Cast Iron (C.I.) pipe.

With GovernmentContracts, you can:
IFB-Water meters November 2, 2026 Town of North Andover, MA Notice-water-meters.pdf Notice- Invitation
Town of North Andover
Bid Due: 11/18/2026
Bid Number: PW-27-04 Bid Title: STORM DRAIN PIPELINE AND STRUCTURE CLEANING AND CCTV
Town of Tewksbury
Bid Due: 11/19/2026
LIQUID EMULSION POLYMER DEER ISLAND TREATMENT Event: 6866-0 Reference: WRA- 5891 REQ 318822
Massachusetts Water Resources Authority
Bid Due: 11/17/2026
Header Information Bid Number: BD-27-1068-1700-1-135084 Description: Underage Access To Sports Wagering Platforms Research
Commonwealth of Massachusetts
Bid Due: 12/15/2026