CM Rustic Cabins at New Discovery & Lake Carmi State Parks Addendum 1

Location: Vermont
Posted: Mar 30, 2026
Due: Apr 8, 2026
Agency: State of Vermont
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
TITLE QUESTIONS DUE ANSWERS POSTED DUE DATE NO POSTING AFTER
CM Rustic Cabins at New Discovery & Lake Carmi State Parks
Addendum 1

03/20/2026 04:30PM


04/08/2026 04:30PM

Attachment Preview

REQUEST FOR PROPOSAL
CONSTRUCTION MANAGEMENT SERVICES FOR MULTIPLE RUSTIC CABIN
INSTALLATIONS AT
NEW DISCOVERY STATE PARK, MARSHFIELD, VT AND LAKE CARMI STATE PARK,
FRANKLIN, VT
ADDENDUM # 1
State of Vermont
Department of Buildings and General Services
Office of Purchasing & Contracting
133 State Street
Montpelier, Vermont 05633-8000
DATE March 30, 2026
TO ALL BIDDERS OF RECORD:
This Addendum consists of (2) pages.
Acknowledge receipt of this Addendum by entering its number and date on the Proposal Form. This Addendum forms
a part of the Contract Documents and modifies them as follows:
Items:
1. Date Changes:
RESPONSES DUE BY: April 8, 2026 – 4:30 PM (EST)
Non-Mandatory Pre-Bid Meeting (held in person and online) Attendees
a.
Frank Spaulding, Vermont State Parks
b.
Jill Korcoulis, Construction Summary of NH/Maine/VT, Inc
c.
Jordan Royer, ReArch Construction
d.
Mark Fyrberg, Opus Corporation
e.
Brian Sprague, Opus Corporation
f.
Josh Mather, Black Bear Construction
g.
Joe Slayton, Juggernaut Construction
h.
Bud Stevens, Juggernaut Construction
2. Questions & Answers:
a.
Q.
Will bonding be required for the project?
A.
1.7.2. BONDING: Full bonding is required for this Project.
b.
Q.
What type of rustic building (Log, Timber or stick frame with rustic siding)?
A.
Bidders’ attention is directed to, and the following text is appended to 3.1.3 Cabin
Structure–
The designs are provided to convey the desired character, dimensions and aesthetic of the
complete structure. State Parks will be flexible in approving the type of construction, (Stick, Post
and Beam, Log, etc.) as long as the structure meets the program requirements detailed in the RFP,
including but not necessarily limited to attractive aesthetic, ADA compliance, and price point that
results in a value investment.
FPR cannot compromise on elements of aesthetic and quality to the point where the cabin
becomes unattractive to rental or compromises the protected image and “brand” of Vermont State
Parks
c.
Q.
If Log will that be put out as a separate bid or to be through the Management service?
A.
All work, including labor and materials will be coordinated by and through the management
Rev 03.20.2026
service and will be incorporated in the Guaranteed Maximum Price (GMP) as structured in the
RFP
d.
Q.
Why and do bidders need to complete B – Hourly Rate Schedule on page 2 of 3 of the Bid
Proposal Form?
A.
This is additional information to assist in evaluating the proposals for award and bidders
must provide hourly rates as appropriate for their firm to the best of their knowledge.
e.
Q.
Where is the nearest power source? (New Discovery State Park)
A.
The nearest power source is located at road junction near Campsite #30 at New Discovery
State Park as indicated on sheet 1 of 12 of the drawings titled New Discovery State Park Rustic Cabins
referenced as 11.10 in ATTACHMENTS in the RFP.
f.
Q.
Required Amperage?
A.
Power requirements for the Cabins are outlined beginning in Section 3.1.4 in the RFP and
service requirements will be dictated by what is needed to power the desired program in accordance with
NEC.
For the purposes of conduit sizing for proposed RV electrical sites, each powered site
assumes a 50 AMP RV pedestal.
Power requirements for the toilet building will be what is required by the existing demands
of the building.
Repowered existing host site shall be a 50 AMP RV pedestal.
END OF ADDENDUM # 1
Rev 03.20.2026
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Enhancing Blueprint Transformation Network Capacity: Workforce Support and System Development through Clinical Knowl...

State Government of Vermont

Bid Due: 6/22/2026

Enhancing Blueprint Transformation Network Capacity: Workforce Support and System Development via Training... Request

State Government of Vermont

Bid Due: 6/22/2026

Rural Health Transformation - Shared EHR Request Date: 5/20/2026 11:46:28 AM Open Date:

State Government of Vermont

Bid Due: 6/15/2026

Boulay Rd Slope Stabilization FEMA 826294 Request Date: 6/3/2026 10:07:18 AM Open Date:

State Government of Vermont

Bid Due: 6/25/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.