| Location: | Vermont |
|---|---|
| Posted: | Mar 6, 2026 |
| Due: | Mar 27, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Bennington Keywords: Construction (Non Building), Bridge Repair and Construction Bid Description: Ninja Path – Phase 2 Stage 2– Bennington STP BP(15) 2 & Bennington TAP TA22(9): Construction of a shared-use pathway starting from the southern end of Hannaford Square Plaza and continuing to a connection point at the existing Ninja Path at the Vermont 279 overpass and the construction of one prefabricated galvanized pedestrian bridge. All bidders shall be on the current VTRANS Contract Administration pre-qualified list “Contractors List of Bike and/or Pedestrian Path, Bridge Construction Category” VT Agency of Transportation 2018 Standard Specifications for Construction shall apply to this contract. Owner: Town of Bennington Bennington Town Office 205 South Street Bennington, VT 05201
|
||||||||||||||||||||

With GovernmentContracts, you can:
...Naulakha Drainage Project - Construction Request Date: 6/9/2026 11:26:55 AM Open Date: 6/8/2026... ...
State Government of Vermont
Bid Due: 6/25/2026
...RFQ - Construction Manager at Risk (CMAR) Contractor Services for Burlington Main WWTF ...
State Government of Vermont
Bid Due: 7/15/2026
...Follow Design Bid Build (DBB) Construction Requirement for Alburg Springs Land Port of ...
GENERAL SERVICES ADMINISTRATION
Bid Due: 6/15/2026
...Follow Design Bid Build (DBB) Construction Requirement for Alburg Springs Land Port of ...
GENERAL SERVICES ADMINISTRATION
Bid Due: 6/15/2026