[2000-27] RFQP-CM_0269-2023 Chilled Water Distribution Replacement Klaus to CoC

Location: Georgia
Posted: Jul 7, 2026
Due: Jul 29, 2026
Agency: State Government of Georgia
Type of Government: State & Local
Category:
  • 41 - Refrigeration, Air Conditioning and Air Circulating Equip.
  • 45 - Plumbing, Heating, and Sanitation Equipment
  • J - Maintenance, Repair, and Rebuilding of Equipment
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: PE-50300-RFP-2027-000000319
Publication URL: To access bid details, please log in.
Event ID Event Title Government Entity Start Date (ET) End Date (ET)
PE-50300-RFP-2027-000000319 [2000-27] RFQP-CM_0269-2023 Chilled Water Distribution Replacement Klaus to CoC Georgia Institute Of Technology
Jul 07, 2026 @ 12:43 PM
Jul 29, 2026 @ 02:00 PM
[2000-27] RFQP-CM_0269-2023 Chilled Water Distribution Replacement Klaus to CoC

Start Date: Jul 07, 2026 @ 12:43 PM ET

End Date:
Jul 29, 2026 @ 02:00 PM ET

Event ID: PE-50300-RFP-2027-000000319
Event Type: Request for Proposal
Event Status: Open
Purchase Type: Open Market
Category Type: Services / Special Projects
Government Type: state
Fiscal Year: 2027


Description


07/07/2026: GT Planning, Design & Construction (PDC) unit is soliciting Statements of Qualifications (Step 1 RFQ) from Firms interested in providing Construction Management (CM/GC) Services for a project known as ¿Project No. 0269-2023 Chilled Water Distribution Replacement Klaus to College of Computing" - Bid-Contract No. 2000-27 located at the Georgia Institute of Technology campus, Atlanta, Georgia. Respondents who are determined qualified may be shortlisted for Interview and offer fee proposals for these services (Step 2 RFP).

Please see attached CM-RFQP package in the ¿Documents¿ tab.

NIGP Codes
Code Description
92544 General Construction: Management, Scheduling, Cost Estimation Engineering
95826 Construction Management Services
BuyerContact:

Donna Vongsouvan
donna.vongsouvan@facilities.gatech.edu

XXX-XXX-XXXX

Attachment Preview

EXHIBIT C

Project No. 0269-2023 Chilled Water Distribution Replacement Klaus to CoC CM Svcs,

Georgia Institute of Technology, Atlanta, Georgia

CM/GC FEE PROPOSAL

1. CM/GC'S FEE:

Basis of Fee. The CM/GC's fee is the amount, established by and agreed to by both parties, which is the full amount of compensation due to the CM/GC as gross profit, and for any and all expenses of the Project not included and identified as a Cost of the Work, provided that the CM/GC performs all the requirements of the Contract Documents within the time limits established. (See Article 4.1.1 of the General Requirements.) If applicable, the fees and costs should be broken down by each site within a multi-site project.

A. PRECONSTRUCTION FEE:

Pre-Construction Fee. Representing the gross profit for the pre-construction consulting services provided by CM/GC as set forth in Section 2, Parts 1 and 2 of the General Requirements, and as described in Paragraph 4.1.1.1(a), Owner shall pay to CM/GC a Preconstruction Fee:

B. CONSTRUCTION FEE:

Construction Fee. Representing the gross profit for the construction services provided by CM/GC as set forth in Section 3, Part 1 of the General Requirements, and as described in Paragraph 4.1.1.1(b) Owner shall pay to CM/GC a Construction Fee.

2. CM/GC'S PRECONSTRUCTION COSTS AND CONSTRUCTION OVERHEAD COSTS:

The CM/GC's Overhead Costs. The maximum amount for the CM/GC's Pre-Construction Costs and Expenses and Construction Overhead Costs are inclusive of all direct and incidental expenses are as described in Paragraph 4.1.1.2 .

____________________________________________________________

CM/GC Name

By:_________________________________________________________

Signature of CM/GC Officer

____________________________________________________________

Title of CM/GC Officer

TOTAL
Pre-Construction Fee (fixed fee) $
TOTAL
Construction Fee (fixed fee) $
AMOUNT
A. Maximum Pre-construction Costs & Expenses (From Attachment A. Do not include the Pre-Construction Fee in this amount) $
B. Maximum Construction Overhead Costs (From Attachment B. Do not include the Construction Fee in this amount) $
Total Maximum Overhead Cost (Sum of A & B) $
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Bid # Bid/Proposal Name Pre-Bid/Pre-Proposal Bid/Proposal Opening Bid Tabulation ITB 27-006 Speed Table ...

City of Albany

Bid Due: 8/17/2026

...Natural Gas Pipeline Construction (PDF, 7MB) 08/18 09/16/2026...

City of Albany

Bid Due: 9/16/2026

...RFQ for Engineering and Construction Services Development Authority Of Dawson County Aug 07, ...

State Government of Georgia

Bid Due: 9/07/2026

...26-181 Construction Svcs for May Park Improvements Available Date: 7/23/2026 Due Date: 8/18/2026... ...

https://www.augustaga.gov/

Bid Due: 8/18/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.