| Location: | Georgia |
|---|---|
| Posted: | Jul 7, 2026 |
| Due: | Aug 12, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-65600-NONST-2027-000000237 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-65600-NONST-2027-000000237 | 26150-B FCWS ¿ Crosstown WTP Chemical System Upgrades | Fayette County Board Of Commissioners |
Jul 07, 2026 @ 12:03 PM
|
Aug 12, 2026 @ 03:00 PM
|
Start Date: Jul 07, 2026 @ 12:03 PM ET
End Date:
Aug 12, 2026 @ 03:00 PM ET
Fayette County, Georgia invites you to submit a bid for upgrades to the existing Crosstown Water Treatment Plant (WTP) chemical systems. Bids will be accepted until 3:00p.m., on Wednesday, August 12, 2026. Attached in PDF format, please find Invitation to Bid 26150-B FCWS ¿ Crosstown WTP Chemical System Upgrades. If you have questions, contact Colette Cobb via email ccobb@fayettecountyga.gov.
| Code | Description |
| 91360 | Construction, Water System, Plants, Main and Service Line |
Colette Cobb
ccobb@fayettecountyga.gov
770-305-5115
CONTRACT DOCUMENTS
FOR CONSTRUCTION OF
ITB 26150-B
FCWS - CROSSTOWN WTP
CHEMICAL
SYSTEM
UPGRADES
Issued for Bid
JULY 2026
Prepared For: Prepared By:
Fayette County Water System Arcadis U.S., Inc.
245 McDonough Rd., Fayetteville, GA 30214 2839 Paces Ferry Road Suite 1000
Atlanta, GA 30339
(770)461-1146
(770)431-8666
| 6/25/2026 Michael Diaz, PE 4/22/25 | Specification Sections Sealed |
|---|---|
| Division 00 Bidding and Contracting Requirements | |
| Arcadis U.S. Inc. |
| 6/19/ 6/19/2026 Travis Thomas, PE | Specification Sections Sealed |
|---|---|
| Division 01 General Requirements Division 02 Existing Conditions Division 33 Utilities Division 40 Process Integration 40 05 05 Exposed Piping Installation 40 05 06 Couplings, Adapters and Specials for Process Piping 40 05 07 Pipe Hangers and Supports 40 05 08 Wall Pipes, Floor Pipes and Pipe Sleeves 40 05 31 Thermoplastic Process Pipe 40 05 53 Process Valves and Appurtenances 40 23 26 Piping Valves and Appurtenances for Chemical Feed Systems 20 Division 43 Process Gas and Liquid Handling, Purification and Storage Equipment Division 46 Water and Wastewater Equipment | |
| Arcadis U.S. Inc. |
DESIGN PROFESSIONAL SEALS
00 01 07 DESIGN PROFESSIONAL SEALS
Specification Sections Sealed
Division 00 Bidding and Contracting Requirements
6/25/2026
Michael Diaz, PE 4/22/25
Arcadis U.S. Inc.
Specification Sections Sealed
Division 01 General Requirements
Division 02 Existing Conditions
Division 33 Utilities
Division 40 Process Integration
40 05 05 Exposed Piping Installation
40 05 06 Couplings, Adapters and Specials for Process Piping
40 05 07 Pipe Hangers and Supports
40 05 08 Wall Pipes, Floor Pipes and Pipe Sleeves
40 05 31 Thermoplastic Process Pipe
40 05 53 Process Valves and Appurtenances
40 23 26 Piping Valves and Appurtenances for Chemical Feed
Systems
6/19/20
6/19/2026 Division 43 Process Gas and Liquid Handling, Purification and
Storage Equipment
Division 46 Water and Wastewater Equipment
Travis Thomas, PE
Arcadis U.S. Inc.
FCWS Crosstown WTP
Chemical Upgrades 00 01 07 - 1
| 06.22.26 Donnell Duncan, PE, SE | Specification Sections Sealed |
|---|---|
| Division 03 Concrete Division 05 Metals Division 06 Wood, Plastics and Composites Division 13 Special Construction | |
| Arcadis U.S. Inc. |
| Errol Dawkins, RA | Specification Sections Sealed |
|---|---|
| Division 07 Thermal and Moisture Protection Division 08 Openings Division 09 Finishes Division 10 Specialties | |
| Arcadis U.S. Inc. |
| Sunilsen Peramanu, PE | Specification Sections Sealed |
|---|---|
| Division 22 Plumbing Division 23 Heating, Ventilating and Air conditioning | |
| Arcadis U.S. Inc. |
DESIGN PROFESSIONAL SEALS
Specification Sections Sealed
Division 03 Concrete
Division 05 Metals
Division 06 Wood, Plastics and Composites
Division 13 Special Construction
06.22.26
Donnell Duncan, PE, SE
Arcadis U.S. Inc.
Specification Sections Sealed
Division 07 Thermal and Moisture Protection
Division 08 Openings
Division 09 Finishes
Division 10 Specialties
Errol Dawkins, RA
Arcadis U.S. Inc.
Specification Sections Sealed
Division 22 Plumbing
Division 23 Heating, Ventilating and Air conditioning
Sunilsen Peramanu, PE
Arcadis U.S. Inc.
FCWS Crosstown WTP
Chemical Upgrades 00 01 07 - 2
| Thomas Powell, PE | Specification Sections Sealed |
|---|---|
| Division 26 Electrical Division 40 Process Integration 40 05 93 Common Motor Requirements for Process Equipment 40 05 96 Vibration, Seismic and Wind Controls 40 41 13 Heat Trace 40 42 00 Insulation of Process Piping and Equipment 40 60 05 Instrumentation and Controls for Process Systems | |
| Arcadis U.S. Inc. |
DESIGN PROFESSIONAL SEALS
Specification Sections Sealed
Division 26 Electrical
Division 40 Process Integration
40 05 93 Common Motor Requirements for Process Equipment
40 05 96 Vibration, Seismic and Wind Controls
40 41 13 Heat Trace
40 42 00 Insulation of Process Piping and Equipment
Thomas Powell, PE 40 60 05 Instrumentation and Controls for Process Systems
Arcadis U.S. Inc.
END OF SECTION 00 01 07
FCWS Crosstown WTP
Chemical Upgrades 00 01 07 - 3
| Section | Title | ||||
|---|---|---|---|---|---|
| Division 00 | |||||
| 00 01 01 | Project Cover Sheet | ||||
| 00 01 07 | Design Professional Seals | ||||
| 00 01 10 | Table of Contents | ||||
| 00 11 13 | Invitation to Bid - Letter | ||||
| 00 21 13 | Instructions to Bidders | ||||
| 00 41 13 | Bid Form | ||||
| 00 43 13 | Bid Bond | ||||
| 00 45 13 | Qualifications Statement | ||||
| 00 52 13 | Agreement | ||||
| 00 52 14 | Additional Terms and Conditions | ||||
| 00 61 13 | Performance Bond | ||||
| 00 61 16 | Payment Bond | ||||
| 00 72 13 | EJCDC C700 General Conditions | ||||
| 00 73 01 | Supplementary Conditions | ||||
| Division 01 | General Requirements | ||||
| 01 11 13 | Summary of Work | ||||
| 01 13 13 | Milestones | ||||
| 01 14 16 | Coordination with Owner's Operations | ||||
| 01 21 00 | Contingency Allowances | ||||
| 01 22 13 | Measurement and Payment | ||||
| 01 25 00 | Substitution Procedures | ||||
| 01 26 00 | Contract Modification Procedures | ||||
| 01 29 73 | Schedule of Values | ||||
| 01 29 76 | Progress Payment Procedures | ||||
| 01 31 13 | Project Coordination | ||||
| 01 31 18 | Pre-construction Conference | ||||
| 01 31 19 | Progress Meetings | ||||
| 01 31 26 | Electronic Communication Protocols | ||||
| 01 32 16 | Progress Schedule | ||||
| 01 32 33 | Photographic Documentation | ||||
| 01 33 00 | Submittal Procedures | ||||
| 01 35 23 | Safety Requirements | ||||
| 01 35 43.13 | Environmental Procedures for Hazardous Materials | ||||
| 01 35 44 | Spill Prevention Control and Countermeasures Plan | ||||
| 01 41 24 | Permit Requirements | ||||
| 01 41 26 | Storm Water Pollution Prevention Plan and Permit | ||||
| 01 41 27 | Earthmoving Permit and Dust Control |
Table of Contents
SECTION 00 01 10
TABLE OF CONTENTS
Section Title
Division 00
00 01 01 Project Cover Sheet
00 01 07 Design Professional Seals
00 01 10 Table of Contents
00 11 13 Invitation to Bid - Letter
00 21 13 Instructions to Bidders
00 41 13 Bid Form
00 43 13 Bid Bond
00 45 13 Qualifications Statement
00 52 13 Agreement
00 52 14 Additional Terms and Conditions
00 61 13 Performance Bond
00 61 16 Payment Bond
00 72 13 EJCDC C700 General Conditions
00 73 01 Supplementary Conditions
Division 01 General Requirements
01 11 13 Summary of Work
01 13 13 Milestones
01 14 16 Coordination with Owner's Operations
01 21 00 Contingency Allowances
01 22 13 Measurement and Payment
01 25 00 Substitution Procedures
01 26 00 Contract Modification Procedures
01 29 73 Schedule of Values
01 29 76 Progress Payment Procedures
01 31 13 Project Coordination
01 31 18 Pre-construction Conference
01 31 19 Progress Meetings
01 31 26 Electronic Communication Protocols
01 32 16 Progress Schedule
01 32 33 Photographic Documentation
01 33 00 Submittal Procedures
01 35 23 Safety Requirements
01 35 43.13 Environmental Procedures for Hazardous Materials
01 35 44 Spill Prevention Control and Countermeasures Plan
01 41 24 Permit Requirements
01 41 26 Storm Water Pollution Prevention Plan and Permit
01 41 27 Earthmoving Permit and Dust Control
FCWS Crosstown WTP 00 01 10 - 1
Chemical Upgrades
| Section | Title | ||||
|---|---|---|---|---|---|
| 01 42 00 | References | ||||
| 01 43 00 | Quality Assurance | ||||
| 01 45 29 | Testing Laboratory Services | ||||
| 01 45 53 | Cleaning Testing and Disinfecting Hydraulic Structures | ||||
| 01 51 05 | Temporary Utilities | ||||
| 01 55 13 | Access Roads and Parking Areas | ||||
| 01 57 05 | Temporary Controls | ||||
| 01 57 33 | Security | ||||
| 01 61 00 | Common Product Requirements | ||||
| 01 62 00 | Product Options | ||||
| 01 65 00 | Product Delivery Requirements | ||||
| 01 66 00 | Product Storage and Handling Requirements | ||||
| 01 71 23 | Field Engineering | ||||
| 01 71 23.16 | Construction Surveying | ||||
| 01 71 33 | Protection of Work and Property | ||||
| 01 73 19 | Installation | ||||
| 01 73 24 | Connection to Existing Facilities | ||||
| 01 73 29 | Cutting and Patching | ||||
| 01 74 05 | Cleaning | ||||
| 01 74 19 | Construction Waste Management and Disposal | ||||
| 01 75 11 | Checkout and Startup Procedures | ||||
| 01 77 19 | Closeout Requirements | ||||
| 01 78 23 | Operations and Maintenance Data | ||||
| 01 78 36 | Warranties | ||||
| 01 78 39 | Project Record Documents | ||||
| 01 78 43 | Spare Parts and Extra Materials | ||||
| 01 79 23 | Instruction of Operations and Maintenance Personnel | ||||
| Division 02 | Existing Conditions | ||||
| 02 41 00 | Demolition | ||||
| Division 03 | Concrete | ||||
| 03 00 05 | Concrete | ||||
| Division 05 | Metals | ||||
| 05 05 33 | Anchor Systems | ||||
| 05 12 00 | Structural Steel Framing | ||||
| 05 50 13 | Miscellaneous Metal Fabrications | ||||
| 05 51 17 | Aluminum Stairs | ||||
| 05 52 15 | Aluminum Handrails and Railings | ||||
| 05 53 16 | Aluminum Grating | ||||
Table of Contents
Section Title
01 42 00 References
01 43 00 Quality Assurance
01 45 29 Testing Laboratory Services
01 45 53 Cleaning Testing and Disinfecting Hydraulic Structures
01 51 05 Temporary Utilities
01 55 13 Access Roads and Parking Areas
01 57 05 Temporary Controls
01 57 33 Security
01 61 00 Common Product Requirements
01 62 00 Product Options
01 65 00 Product Delivery Requirements
01 66 00 Product Storage and Handling Requirements
01 71 23 Field Engineering
01 71 23.16 Construction Surveying
01 71 33 Protection of Work and Property
01 73 19 Installation
01 73 24 Connection to Existing Facilities
01 73 29 Cutting and Patching
01 74 05 Cleaning
01 74 19 Construction Waste Management and Disposal
01 75 11 Checkout and Startup Procedures
01 77 19 Closeout Requirements
01 78 23 Operations and Maintenance Data
01 78 36 Warranties
01 78 39 Project Record Documents
01 78 43 Spare Parts and Extra Materials
01 79 23 Instruction of Operations and Maintenance Personnel
Division 02 Existing Conditions
02 41 00 Demolition
Division 03 Concrete
03 00 05 Concrete
Division 05 Metals
05 05 33 Anchor Systems
05 12 00 Structural Steel Framing
05 50 13 Miscellaneous Metal Fabrications
05 51 17 Aluminum Stairs
05 52 15 Aluminum Handrails and Railings
05 53 16 Aluminum Grating
FCWS Crosstown WTP 00 01 10 - 2
Chemical Upgrades
| Section | Title | ||||
|---|---|---|---|---|---|
| Division 06 | Wood, Plastics and Composites | ||||
| 06 82 13 | Fiberglass-Reinforced Plastic Grating | ||||
| Division 07 | Thermal and Moisture Protection | ||||
| 07 54 23 | Thermoplastic Polyefin (TPO) Roofing | ||||
| 07 71 00 | Roof Specialists | ||||
| 07 92 00 | Joint Sealants | ||||
| Division 08 | Openings | ||||
| 08 90 00 | Louvers and Vents | ||||
| Division 09 | Finishes | ||||
| 09 62 53 | Concrete Floor Toppings | ||||
| 09 91 00 | Painting | ||||
| Division 10 | Specialties | ||||
| 10 14 00 | Signage | ||||
| 10 44 00 | Fire Protection Specialties | ||||
| Division 13 | Special Construction | ||||
| 13 34 23 | Pre-Engineered Shelter | ||||
| Division 22 | Plumbing | ||||
| 22 05 27 | Pipe Sleeves for Plumbing | ||||
| 22 05 29 | Hangers and Supports for Plumbing Piping and Equipment | ||||
| 22 05 53 | Identification of Plumbing Piping and Equipment | ||||
| 22 05 93 | Disinfection of Plumbing Systems | ||||
| 22 07 19 | Plumbing Piping Insulation | ||||
| 22 10 53 | Installation of Plumbing Piping | ||||
| 22 10 63 | Testing of Plumbing Pipe Systems | ||||
| 22 11 16 | Domestic Water Piping | ||||
| 22 13 16 | Sanitary Waste and Vent Piping | ||||
| 22 14 13 | Storm Drainage Piping | ||||
| 22 33 00 | Domestic Water Heaters | ||||
| Division 23 | Heating, Ventilating and Air conditioning | ||||
| 23 05 29 | Hangers and Supports for HVAC Ductwork, Piping and Equipment | ||||
| 23 05 93 | Testing, Adjusting, and Balancing for HVAC | ||||
| 23 07 13 | Duct Insulation | ||||
| 23 07 19 | HVAC Piping Insulation | ||||
| 23 09 00 | Instrumentation and Control for HVAC | ||||
| 23 23 00 | Refrigerant Piping |
Table of Contents
Section Title
Division 06 Wood, Plastics and Composites
06 82 13 Fiberglass-Reinforced Plastic Grating
Division 07 Thermal and Moisture Protection
07 54 23 Thermoplastic Polyefin (TPO) Roofing
07 71 00 Roof Specialists
07 92 00 Joint Sealants
Division 08 Openings
08 90 00 Louvers and Vents
Division 09 Finishes
09 62 53 Concrete Floor Toppings
09 91 00 Painting
Division 10 Specialties
10 14 00 Signage
10 44 00 Fire Protection Specialties
Division 13 Special Construction
13 34 23 Pre-Engineered Shelter
Division 22 Plumbing
22 05 27 Pipe Sleeves for Plumbing
22 05 29 Hangers and Supports for Plumbing Piping and Equipment
22 05 53 Identification of Plumbing Piping and Equipment
22 05 93 Disinfection of Plumbing Systems
22 07 19 Plumbing Piping Insulation
22 10 53 Installation of Plumbing Piping
22 10 63 Testing of Plumbing Pipe Systems
22 11 16 Domestic Water Piping
22 13 16 Sanitary Waste and Vent Piping
22 14 13 Storm Drainage Piping
22 33 00 Domestic Water Heaters
Division 23 Heating, Ventilating and Air conditioning
23 05 29 Hangers and Supports for HVAC Ductwork, Piping and Equipment
23 05 93 Testing, Adjusting, and Balancing for HVAC
23 07 13 Duct Insulation
23 07 19 HVAC Piping Insulation
23 09 00 Instrumentation and Control for HVAC
23 23 00 Refrigerant Piping
FCWS Crosstown WTP 00 01 10 - 3
Chemical Upgrades
| Section | Title | ||||
|---|---|---|---|---|---|
| 23 31 13 | Metal Ductwork | ||||
| 23 31 16 | FRP Ductwork | ||||
| 23 34 06 | Non-Metallic HVAC Fans | ||||
| 23 82 39.43 | Electric Unit Heaters | ||||
| Division 26 | Electrical | ||||
| 26 05 05 | General Provisions for Electrical Systems | ||||
| 26 05 19 | Low voltage Electrical Power Conductors and Cables | ||||
| 26 05 23 | Instrumentation and Communication Cable | ||||
| 26 05 26 | Grounding and Bonding for Electrical Systems | ||||
| 26 05 29 | Hangers and Supports for Electrical Systems | ||||
| 26 05 33.13 | Rigid Conduits | ||||
| 26 05 33.16 | Flexible Conduits | ||||
| 26 05 33.26 | Expansion Deflection Fittings | ||||
| 26 05 33.33 | Pull Junction and Terminal Boxes | ||||
| 26 05 33.36 | Outlet Boxes | ||||
| 26 05 43.13 | Underground Ductbanks for Electrical Systems | ||||
| 26 05 43.23 | Manholes and Handholes for Electrical Systems | ||||
| 26 05 53 | Identification for Electrical Systems | ||||
| 26 22 14 | Dry-Type Low-Voltage Distribution Transformers | ||||
| 26 24 16 | Panelboards | ||||
| 26 27 26.13 | Low-Voltage Receptacles | ||||
| 26 27 26.23 | Snap Switches | ||||
| 26 28 16.33 | Disconnect Switches | ||||
| 26 29 37 | Low-voltage Combination Magnetic Motor Starters | ||||
| 26 43 00 | Surge Protective Devices | ||||
| 26 50 00 | Lighting | ||||
| Division 31 | |||||
| 31 20 00 | Earth Moving | ||||
| Division 33 | Utilities | ||||
| 33 05 05 | Buried Piping Installation | ||||
| Division 40 | Process Integration | ||||
| 40 05 05 | Exposed Piping Installation | ||||
| 40 05 06 | Couplings, Adapters and Specials for Process Piping | ||||
| 40 05 07 | Pipe Hangers and Supports | ||||
| 40 05 08 | Wall Pipes, Floor Pipes and Pipe Sleeves | ||||
| 40 05 19 | Ductile Iron Process Pipe | ||||
| 40 05 31 | Thermoplastic Process Pipe | ||||
| 40 05 53 | Process Valves and Appurtenances |
Table of Contents
Section Title
23 31 13 Metal Ductwork
23 31 16 FRP Ductwork
23 34 06 Non-Metallic HVAC Fans
23 82 39.43 Electric Unit Heaters
Division 26 Electrical
26 05 05 General Provisions for Electrical Systems
26 05 19 Low voltage Electrical Power Conductors and Cables
26 05 23 Instrumentation and Communication Cable
26 05 26 Grounding and Bonding for Electrical Systems
26 05 29 Hangers and Supports for Electrical Systems
26 05 33.13 Rigid Conduits
26 05 33.16 Flexible Conduits
26 05 33.26 Expansion Deflection Fittings
26 05 33.33 Pull Junction and Terminal Boxes
26 05 33.36 Outlet Boxes
26 05 43.13 Underground Ductbanks for Electrical Systems
26 05 43.23 Manholes and Handholes for Electrical Systems
26 05 53 Identification for Electrical Systems
26 22 14 Dry-Type Low-Voltage Distribution Transformers
26 24 16 Panelboards
26 27 26.13 Low-Voltage Receptacles
26 27 26.23 Snap Switches
26 28 16.33 Disconnect Switches
26 29 37 Low-voltage Combination Magnetic Motor Starters
26 43 00 Surge Protective Devices
26 50 00 Lighting
Division 31
31 20 00 Earth Moving
Division 33 Utilities
33 05 05 Buried Piping Installation
Division 40 Process Integration
40 05 05 Exposed Piping Installation
40 05 06 Couplings, Adapters and Specials for Process Piping
40 05 07 Pipe Hangers and Supports
40 05 08 Wall Pipes, Floor Pipes and Pipe Sleeves
40 05 19 Ductile Iron Process Pipe
40 05 31 Thermoplastic Process Pipe
40 05 53 Process Valves and Appurtenances
FCWS Crosstown WTP 00 01 10 - 4
Chemical Upgrades
| Section | Title | ||||
|---|---|---|---|---|---|
| 40 05 93 | Common Motor Requirements for Process Equipment | ||||
| 40 23 26 | Piping Valves and Appurtenances for Chemical Feed Systems | ||||
| 40 41 13 | Heat Trace | ||||
| 40 42 00 | Insulation of Process Piping and Equipment | ||||
| 40 60 05 | Instrumentation and Controls for Process Systems | ||||
| 40 60 05B | Instrumentation and Control for Process Systems - Input/Output List | ||||
| Division 43 | Process Gas and Liquid Handling, Purification and Storage Equipment | ||||
| 43 21 13.16 | Centrifugal Magnetic Drive Sealless End Suction Pumps | ||||
| 43 41 43 | Polyethylene Tanks | ||||
| Division 46 | Water and Wastewater Equipment | ||||
| 46 33 44 | Skid Mounted Peristaltic Metering Pumps and Appurtenances |
Table of Contents
Section Title
40 05 93 Common Motor Requirements for Process Equipment
40 23 26 Piping Valves and Appurtenances for Chemical Feed Systems
40 41 13 Heat Trace
40 42 00 Insulation of Process Piping and Equipment
40 60 05 Instrumentation and Controls for Process Systems
40 60 05B Instrumentation and Control for Process Systems - Input/Output List
Division 43 Process Gas and Liquid Handling, Purification and Storage Equipment
43 21 13.16 Centrifugal Magnetic Drive Sealless End Suction Pumps
43 41 43 Polyethylene Tanks
Division 46 Water and Wastewater Equipment
46 33 44 Skid Mounted Peristaltic Metering Pumps and Appurtenances
END OF SECTION
FCWS Crosstown WTP 00 01 10 - 5
Chemical Upgrades

With GovernmentContracts, you can:
INVITATION TO BID VEHICLE: HEAVY DUTY BID REF. #04-079 #04-079 Part 2 March
City of Albany
Bid Due: 2/03/2031
BL081-24 INV Purchase of a Swift Water Rescue Boat Buyer Contact : casey.beauston@gwinnettcounty.com
Gwinnett County
Bid Due: 12/31/2029
Bid Title: GENERAL CONTRACTORS TO CONSTRUCT AND/OR PERFORM REPAIRS AND REHABILITATION ON RESIDENTIAL
City of Newnan
Bid Due: 9/30/2031
Follow TS Zeta Multiple Trail Bridges Replacement Active Contract Opportunity Notice ID 12445525B0014
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/22/2026