| Location: | Hawaii |
|---|---|
| Posted: | Oct 16, 2026 |
| Due: | Nov 16, 2026 |
| Agency: | State Government of Hawaii |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | B27000492 |
| Publication URL: | To access bid details, please log in. |
General Information
Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility
of this Solicitation (Including the appendices and exhibits to this Document, and any other document related
to this Solicitation), to:
Park, Rachael Hui Jin.
| Commodity Code | Description |
| 238110 | Concrete repair |
| 238140 | Masonry contractors |
Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility
of this Solicitation (Including the appendices and exhibits to this Document, and any other document related
to this Solicitation), to:
Park, Rachael Hui Jin.
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
GENERAL REQUIREMENTS, GENERAL PROVISIONS, TECHNICAL PROVISIONS
FOR
APRON RECONSTRUCTION, PHASE 1
KAHULUI AIRPORT
KAHULUI, MAUI, HAWAII
STATE PROJECT NO. CM1530-33
2026
NOTICE TO BIDDERS
Hawaii Revised Statutes (HRS),
Chapter 103D
The receiving of bids for APRON RECONSTRUCTION, PHASE 1, KAHULUI
AIRPORT, KAHULUI, MAUI, HAWAII, STATE PROJECT NO. CM1530-33, will begin
as of the HIePRO Release Date. Bidders shall register and submit complete bids through
HIePRO only. Refer to the following HIePRO link for important information on Vendor
Registration: https://hiepro.ehawaii.gov/welcome.html.
The solicitation plans, specifications, proposal, and additional documents designated or
incorporated by reference shall be available in HIePRO.
HIePRO OFFER DUE DATE AND TIME is November 16, 2026, at 2:00 p.m., Hawaii
Standard Time (HST). Bidders shall submit and upload the complete proposal to HIePRO
prior to the offer due date and time. Proposals received after said due date and time shall
not be considered. Any additional support documents explicitly designated as confidential
and/or proprietary shall be uploaded as a separate file to HIePRO. Bidders shall not
include confidential and/or proprietary documents as part of their proposal. The record of
each bidder and their respective proposal shall be open to public inspection. FAILURE
TO UPLOAD THE PROPOSAL TO HIePRO SHALL BE GROUNDS FOR REJECTION.
The scope of work consists of repairing deteriorated exterior concrete and concrete
masonry unit surfaces of Holdroom F and Walkway EFF, as well as concrete repair for that
respective adjacent area. The estimated cost of construction is between $2,000,000.00
and $3,000,000.00.
To be eligible for award, bidders shall possess a valid State of Hawaii General
Engineering "A" license at the time of bidding.
NTB-1
The Hawaii Department of Transportation, Air and Water Transportation Facilities
Division, 2016 GENERAL PROVISIONS FOR CONSTRUCTION PROJECTS, applicable to
this project are available on the internet at: http://hidot.hawaii.gov/administration/con/.
A virtual pre-bid conference is scheduled for October 12, 2026, at 10:00 a.m., HST.
Interested bidders shall contact Jake Shiraki, State Project Manager, directly at
jake.l.shiraki@hawaii.gov, no later than two working days prior to the scheduled pre-bid
conference to receive the meeting invitation. All prospective bidders and/or their respective
representatives are encouraged to attend, however, attendance is not mandatory. All information
presented at the pre-bid conference shall be provided for clarification and information only. Any
amendments to the solicitation shall be made by formal addendum and posted in HIePRO.
A site visit for Kahului Airport will be scheduled for October 20, 2026, at
9:00 a.m., HST. Prospective bidders must contact the airport representative to indicate they will
be planning to attend the site visit and coordinate the meeting place. It is the responsibility of the
Contractor to understand the required scope of work. The work shall be performed and
documented in accordance with these specifications.
All Request for Information (RFI) questions and Substitution Requests shall be submitted
in HIePRO no later than October 26, 2026, at 2:00 p.m., HST. RFI questions received after
the stated deadline shall not be addressed. Substitution Requests received after the stated
deadline shall not be considered. Verbal RFI(s) shall not receive a response. All responses to
RFI questions shall be provided for clarification and information only and issued by formal
addendum. Any amendments to the solicitation shall be made by formal addendum and posted
in HIePRO.
NTB-2
If there is a conflict between the solicitation and information stated in the pre-bid
conference, pre-bid site visit, the meeting minutes, and/or the responses to RFI questions, the
solicitation shall govern and control, unless as amended by formal addendum.
Apprenticeship Preference. A five percent bid adjustment for bidders that are party to
apprenticeship agreements pursuant to HRS 103-55.6 is applicable to this project.
Employment of State Residents on Construction Procurement Contracts. Compliance
with HRS 103B-3 is a requirement for this project whereby a minimum of 80 percent of the
bidder's work force on this project shall consist of Hawaii residents.
Campaign contributions by State and County Contractors. Contractors are hereby
notified of the applicability of HRS 11-355 which states that campaign contributions are
prohibited from specified State or County government contractors during the term of the contract
if the contractors are paid with funds appropriated by a legislative body. For more information,
contact the Campaign Spending Commission at (808) 586-0285.
Protests. Any protest of this solicitation shall be submitted in writing to the Director of
Transportation, in accordance with HRS 103D-701 and Hawaii Administrative Rules 3-126.
Bidders are hereby notified that the Department of Transportation shall affirmatively
ensure that contracts entered into pursuant to this advertisement are awarded to the lowest
responsible bidder without discrimination on the basis of race, color, national origin, sex, age,
disability, or any other protected status recognized under applicable State and federal law.
For additional information, contact Jake Shiraki, State Project Manager, by phone at
(808) 838-8805, or by email at jake.l.shiraki@hawaii.gov.
NTB-3
The State reserves the right to reject any or all proposals and to waive any defects in said
proposals in the best interest of the public.
_______________________________________
CURT T. OTAGURO
Deputy Director of Transportation for Airports
HIePRO RELEASE DATE: October 2, 2026
NTB-4
TABLE OF CONTENTS
Pages
PART 0 - GENERAL REQUIREMENTS
Instructions for Contractor's Licensing ................................................................... 1
Special Provisions ................................................................................................. SP-1 to SP-10
Wage Rate Schedule (Not Physically Included)
PART I - GENERAL PROVISIONS FOR CONSTRUCTION PROJECTS
(Not Physically Included In The Bid Documents)
PART II - TECHNICAL PROVISIONS
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 01010 DESCRIPTION OF WORK .................................................. 01010-1 to 01010-5
SECTION 01014 WORK SEQUENCE ............................................................ 01014-1 to 01014-2
SECTION 01210 ALLOWANCES ................................................................... 01210-1 to 01210-2
SECTION 01300 SUBMITTALS ..................................................................... 01300-1 to 01300-8
SECTION 01301 CONTRACTOR'S CONSTRUCTION SCHEDULE
AND REPORTS .................................................................. 01301-1 to 01301-16
SECTION 01400 CONTRACTOR QUALITY CONTROL PROGRAM ............. 01400-1 to 01400-7
SECTION 01500 TEMPORARY WATER POLLUTION, DUST,
AND EROSION CONTROL ................................................. 01500-1 to 01500-8
SECTION 01524 CONSTRUCTION WASTE MANAGEMENT ....................... 01524-1 to 01524-17
SECTION 01533 BARRICADES ..................................................................... 01533-1 to 01533-2
SECTION 01560 GENERAL ENVIRONMENTAL HEALTH &
SAFETY CONTROLS ......................................................... 01560-1 to 01560-4
SECTION 01561 CONSTRUCTION SITE POLLUTION CONTROLS ............. 01561-1 to 01561-13
SECTION 01565 SECURITY MEASURES ..................................................... 01565-1 to 01565-2
SECTION 01580 TEMPORARY FACILITIES AND UTILITIES ........................ 01580-1 to 01580-2
SECTION 01700 MOBILIZATION, DEMOBILIZATION ................................... 01700-1 to 01700-3
SECTION 01800 SPECIAL REQUIREMENTS FOR CONTRACTORS
ON THE AOA ...................................................................... 01800-1 to 01800-8
DIVISION 2 - SITE CONSTRUCTION
SECTION 02410 SELECTIVE DEMOLITION ................................................. 02410-1 to 02410-7
APRON RECONSTRUCTION, PHASE 1 TABLE OF CONTENTS
KAHULUI AIRPORT TOC-1
STATE PROJECT NO. CM1530-33 R08/18/2026
DIVISION 3 - CONCRETE
SECTION 03740 CONCRETE REHABILITATION .......................................... 03740-1 to 03740-13
DIVISION 4 - MASONRY
SECTION 04012 CONCRETE UNIT MASONRY REPAIR .............................. 04012-1 to 04012-10
DIVISION 5 - METALS (NOT USED)
DIVISION 6 - WOOD AND PLASTICS (NOT USED)
DIVISION 7 - THERMAL AND MOISTURE PROTECTION (NOT USED)
DIVISION 8 - DOORS AND WINDOWS (NOT USED)
DIVISION 9 - FINISHES (NOT USED)
DIVISION 10 - SPECIALTIES (NOT USED)
DIVISION 11 - EQUIPMENT (NOT USED)
DIVISION 12 - FURNISHINGS (NOT USED)
DIVISION 13 - SPECIAL CONSTRUCTION
DIVISION 14 - CONVEYING SYSTEMS (NOT USED)
DIVISION 15 - MECHANICAL (NOT USED)
DIVISION 16 - ELECTRICAL (NOT USED)
Requirements of Chapter 104, HRS,
Wager and Hours of Employees on Public Works Law (Rev. 05/24) ...................... 1 to 2
Proposal ................................................................................................................ P-1 to P-8
Proposal Schedule ................................................................................................. P-9 to P-10
Surety Bid Bond ..................................................................................................... BB-1
Forms
SAMPLE CONTRACT .......................................................................................... K-1 to K-3
Performance Bond (Surety) ............................................................................. SPB-1 to SBP-2
Performance Bond ......................................................................................... PB-1 to PB-2
APRON RECONSTRUCTION, PHASE 1 TABLE OF CONTENTS
KAHULUI AIRPORT TOC-2
STATE PROJECT NO. CM1530-33
Labor and Material Payment Bond (Surety) ...................................................... SLB-1 to SLB-2
Labor and Material Payment Bond ................................................................... LB-1 to LB-2
Chapter 104, HRS Compliance Certificate ........................................................ 1
Certification of Compliance for Employment of State Residents (ACT 192, SLH 2011) -
Provisions to be Included in Construction Procurement Solicitation
APRON RECONSTRUCTION, PHASE 1 TABLE OF CONTENTS
KAHULUI AIRPORT TOC-3
STATE PROJECT NO. CM1530-33
INSTRUCTIONS FOR CONTRACTOR'S LICENSING
"A" general engineering contractors and "B" general building contractors are reminded
that due to the Hawaii Supreme Court's January 28, 2002 decision in Okada Trucking Co., Ltd. v.
Board of Water Supply, et al., 97 Haw. 450 (2002), they are prohibited from undertaking any
work, solely or as part of a larger project, which would require the general contractor to act as a
specialty contractor in any area where the general contractor has no license. Although the "A"
and "B" contractor may still bid on and act as the "prime" contractor on an "A" or "B" project
(See, HRS 444-7 for the definitions of an "A" and "B" project.), respectively, the "A" and "B"
contractor may only perform work in the areas in which they have the appropriate contractor's
license (An "A" or "B" contractor obtains "C" specialty contractor's licenses either on its own, or
automatically under HAR 16-77-32.). The remaining work must be performed by appropriately
licensed entities. It is the sole responsibility of the contractor to review the requirements of this
project and determine the appropriate licenses that are required to complete the project.
APRON RECONSTRUCTION, PHASE 1
KAHULUI AIRPORT
STATE PROJECT NO. CM1530-33 Instruction to Contractor's Licensing
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
SPECIAL PROVISIONS

With GovernmentContracts, you can:
Day Date Time Area ADD/ / AMD GCA# Project 12/10/26 2:00pm Oahu 1-3
General Contractors Association
Bid Due: 12/10/2026
Day Date Time Area ADD/ / AMD GCA# Project 01/07/27 3:00pm Oahu 37086-338
General Contractors Association
Bid Due: 1/07/2027
Solicitation #: P0263 Title: Kealaula Supportive Housing Phase II Photovoltaic Design-Build Project Category:
State Government of Hawaii
Bid Due: 11/30/2026
Follow Munitions Maintenance and Inspection Facility and Conventional Munitions Cube Storage Addition, HIANG,
DEPT OF DEFENSE
Bid Due: 11/24/2026