Request for Proposals (RFP) for Final Design Engineering Services

Location: Minnesota
Posted: Oct 16, 2026
Due: Nov 6, 2026
Agency: Washington County
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • R - Professional, Administrative and Management Support Services
Publication URL: To access bid details, please log in.
Bid Title: Request for Proposals (RFP) for Final Design Engineering Services
Category: Washington County Public Works
Status: Open
Description:

The Washington County Public Works Department is issuing this request for proposals (RFP) to provide final design engineering services for the County State Aid Highway (CSAH) 13 (Ideal Avenue) Improvement Project.

A preliminary design phase for this project kicked off in 2025 and is currently nearing completion.  Through this phase, multiple alternatives were evaluated, a preferred design was identified, and a preferred layout is being created. More information can be found on the project website: https://washingtoncountymn.gov/IdealAve

In addition, topographic survey has been collected, wetlands have been delineated, utility data has been collected to Quality Level D, and a preliminary hydraulics analysis has been completed.

TKDA is currently under contract to complete the preliminary design phase, which is expected to wrap up by January 2027.  This will include providing a 30% project layout with an associated cost estimate.  These materials will be shared with the selected Consultant for final design services.

There is no federal funding on this project.

This project will be a cooperative project between Washington County, the City of Lake Elmo, and the City of Oakdale, with Washington County serving as the lead agency. All work performed under the anticipated contract must be carried out in accordance with the procedures, requirements, and regulations of Minnesota Department of Transportation (MnDOT) State Aid, Washington County, and the Cities.

Publication Date/Time:
10/16/2026 8:00 AM
Closing Date/Time:
11/6/2026 4:30 PM
Related Documents:

Attachment Preview

Request for Proposals (RFP) for
PROJECT COORDINATION, FINAL ENGINEERING,
STAKEHOLDER AND PUBLIC ENGAGEMENT,
UTILITY COORDINATION, PERMITTING, AND
BIDDING AND CONSTRUCTION SERVICES
CSAH 13, from CSAH 6 to CSAH 14
Improvement Project
City of Oakdale and City of Lake Elmo
RFP release date: 10/16/2026
Submission due date: 11/6/2026
Government Center | 14949 62nd Street North | P. O. Box 6 | Stillwater, MN 55082-0006
P: 651-430-6001 | F: 651-430-6017 | TTY: 651-430-6246
www.washingtoncountymn.gov
Washington County is an equal opportunity organization and employer

Table of Contents
1. Introduction ...................................................................................................................................................... 3
1.1. Background Information ................................................................................................................................. 3
1.2. Project Goals and Objectives .......................................................................................................................... 3
1.3. Schedule .......................................................................................................................................................... 4
1.4. County Authorized Representative ................................................................................................................. 4
2. Scope of Work and Deliverables ....................................................................................................................... 4
2.1. Project Management ................................................................................................................................ 5
2.2. Data Collection ......................................................................................................................................... 5
2.3. Public and Agency Engagement ............................................................................................................... 5
2.4. Design Services ......................................................................................................................................... 6
2.5. Deliverables .............................................................................................................................................. 7
2.6. Bidding and Construction Assistance Services ......................................................................................... 7
2.7. Additional Tasks ........................................................................................................................................ 8
3. Proposal Content............................................................................................................................................... 8
4. Proposal Submittal ............................................................................................................................................ 9
5. Proposal Evaluation and Selection .................................................................................................................... 9
5.1. Evaluation Criteria ........................................................................................................................................ 10
5.2. Final Selection ............................................................................................................................................... 10
5.3. Conditions of this RFP ................................................................................................................................... 10
6. Proposal Questions ......................................................................................................................................... 10
P age | 2

CSAH 13 Improvement Project
1. Introduction
1.1. Background Information
The Washington County Public Works Department is issuing this request for proposals (RFP) to provide final
design engineering services for the County State Aid Highway (CSAH) 13 (Ideal Avenue) Improvement
Project.
A preliminary design phase for this project kicked off in 2025 and is currently nearing completion. Through
this phase, multiple alternatives were evaluated, a preferred design was identified, and a preferred layout is
being created. More information can be found on the project website at:
https://washingtoncountymn.gov/IdealAve
In addition, topographic survey has been collected, wetlands have been delineated, utility data has been
collected to Quality Level D, and a preliminary hydraulics analysis has been completed.
TKDA is currently under contract to complete the preliminary design phase, which is expected to wrap up by
January 2027. This will include providing a 30% project layout with an associated cost estimate. These
materials will be shared with the selected Consultant for final design services.
There is no federal funding on this project.
This project will be a cooperative project between Washington County, the City of Lake Elmo, and the City of
Oakdale, with Washington County serving as the lead agency. All work performed under the anticipated
contract must be carried out in accordance with the procedures, requirements, and regulations of
Minnesota Department of Transportation (MnDOT) State Aid, Washington County, and the Cities.
1.2. Project Goals and Objectives
The objective of this project is to improve the safety, mobility, and bikeability/walkability of this corridor. In
summary, the project goals are as follows:
* Produce municipally approved construction documents that meet all State Aid, Washington County,
and local requirements for final design.
* Meet a schedule that assures project advertisement by December 2028.
* Achieve a construction schedule that minimizes public inconvenience, while being sensitive to
reducing overall project costs and environmental impacts.
P age | 3

Overall Project Schedule Anticipated Date
RFP Solicitation October 2026
Proposals Due November 2026
Consultant Selected November 2026
Scope and Fee Finalized December 2026
County Board Awards Consultant Contract January 2027
Project Kick-off February 2027
60% Plans May 2027
90% Plans September 2027
Final Plans February 2028
Bid Letting (by Washington County) December 2028
Bid Opening (by Washington County) January 2029
Preconstruction Open House March 2029
Construction April - October 2029

CSAH 13 Improvement Project
1.3. Schedule
Washington County anticipates the following schedule:
Overall Project Schedule Anticipated Date
RFP Solicitation October 2026
Proposals Due November 2026
Consultant Selected November 2026
Scope and Fee Finalized December 2026
County Board Awards Consultant Contract January 2027
Project Kick-off February 2027
60% Plans May 2027
90% Plans September 2027
Final Plans February 2028
Bid Letting (by Washington County) December 2028
Bid Opening (by Washington County) January 2029
Preconstruction Open House March 2029
Construction April - October 2029
1.4. County Authorized Representative
The County Authorized Representative for this RFP is:
Andrew Giesen, andrew.giesen@washingtoncountymn.gov
2. Scope of Work and Deliverables
The following lists outline work tasks and associated items that shall be included as part of the
contracted services.
All reports/documentation must be developed and presented in Microsoft Office and all design files must
be developed and presented in ORD adhering to Washington County approved formats unless otherwise
noted or requested by the Consultant (the selected firm to perform this work) with approval of the
County.
The role of the selected Consultant team will be to complete all tasks necessary to take the project to
approved construction documents. Washington County will act as the lead agency through all aspects of
the project.
The County's role as lead agency does not preclude direct and regular interaction between the Consultant
and the Cities, the Watershed District, and other agencies.
External Agency input and review is important; however, the County is to be kept informed of agency
dialogue and will assist the Consultant in determining the need and scope of interaction with a particular
agency.
P age | 4

CSAH 13 Improvement Project
2.1. Project Management
The Consultant will perform all work necessary to effectively coordinate the project completion,
maintain the project schedule and budget, as well as manage the Project Management Team (PMT). The
Consultant should host monthly PMT meetings, which will be a mix of virtual and in-person meetings.
The proposal should include a summary of the project management measures required to ensure that
the project is completed on time, within budget, and in accordance with applicable laws, policies,
standards, and good engineering practice. Monthly progress reports shall be submitted with each
invoice.
The selected Consultant shall develop and implement a project specific Quality Management Plan, which
shall be available for review upon request during the project.
2.2. Data Collection
The Consultant shall collect existing data and reports relevant to the project area and obtain new
information as needed for all aspects of the project.
Washington County will provide the following information to the successful Consultant:
* Aerial imagery
* Topographic Survey
* Existing CAD files associated with approved layout
* Existing Right of Way information
* Record Plans
* Existing Project Tech Memos
2.3. Public and Agency Engagement
2.3.1. Public Engagement
Project Website
Washington County has created a project-specific website, which will be available
throughout the duration of work, as well as throughout construction. The selected
Consultant will be responsible for providing text and graphics to support the website
throughout the project.
Public Events and Newsletters
Assist the County in conducting public engagement and outreach throughout the project.
This will include but is not limited to public open house(s), public mailers, social media, and
email outreach as necessary to maximize attendance and audiences. The county
anticipates at least one additional open house will be needed prior to construction to share
construction staging/detours and overall construction schedules.
The Washington County Style Guide, shall be used to create documents for the public
(newsletters, post cards, posters, etc.), but Consultants are encouraged to develop and
present cost effective solutions to get the public involved.
P age | 5

CSAH 13 Improvement Project
2.4. Design Services
Utility Coordination
For the purposes of this RFP, "utilities" shall mean and include, but not be limited to, all privately,
publicly, or cooperatively-owned pipes, lines, antennas, or facilities for the distribution or transmission
of electrical energy, gasoline, oil, natural gas, water, sewage, steam, cable TV, telephone or other
material and communication lines and devices.
The Consultant shall obtain the locations of all utilities that exist within the limits of construction and
which may be affected by the project. Utility location information shall be obtained directly from the
utility owner unless such means is not feasible. All utilities shall be identified as to owner, type and size.
All utilities shall be shown on the plans in accordance with the requirements of the "Utility Notification
Law", Minnesota Statute Section 216D.04.
The Consultant shall contact the utility owners and use all customary procedures to review the existing
locations and discuss all utility relocations necessitated by the project construction as well as any other
revisions to the utilities, or installation of new utilities, within the project limits which may be deemed
desirable to accomplish in conjunction with the project construction or for which the Consultant has
learned will be required in the future. The procedures outlined in the MnDOT Utility Accommodation
and Coordination Manual for utility identifications and notifications are applicable for design activities.
The subsurface utility information to be provided in the final plans shall be utility Quality Level D
and/or C. Quality levels shall be determined according to the guidelines of CI/ASCE 38.-.2, entitled
"Standard Guidelines for the Collection and Depiction of Existing Subsurface Utility Data."
The Consultant shall develop a callout on the plans of any conflicts and required changes to existing
utility facilities. If conflicts with public utilities are present, utility identification / information /
coordination meetings will be arranged by the Consultant with the owner of these facilities and
Washington County to determine appropriate solutions.
Construction Plans and Specifications
Plans and specifications will include all elements and details required by the Minnesota Department of
Transportation (MnDOT) State Aid (CSAH), local and permitting agency standards. At 90%, and 100% plan
completion, design and supporting technical work (calculations, assumptions, documentation, etc.) shall
be submitted to Washington County for review and comment.
Right of way services are not needed as part of this contract.
At the same time as the 90% and 100% plan submittal, the consultant shall provide project specific
special provisions (600's), external agency specifications, and attachments for the bid package
(geotechnical report, permits, etc.).
Final plans and specifications will be submitted by the Consultant to MnDOT for approval.
P age | 6

CSAH 13 Improvement Project
Project Costs
The Consultant will provide project cost estimates with the 60%, 90%, and final plans, and include:
* Construction (include a 10% contingency with the 60% and 90% plans)
* Construction Engineering/Contract Admin. (8% of construction costs)
* Right-of-Way (cost to be provided by county)
* Design Engineering
* County Furnished Items, if applicable
This cost estimate shall breakdown the agency costs share according to the County's Cost Participation
Policy and funding eligibility.
Permits and Approvals
The Consultant will be responsible for identifying all permits and approvals warranted by the proposed
work with all regulatory agencies. Permits and approvals required may include but not limited to the
following: Watershed District, Minnesota Pollution Control Agency's NPDES General Stormwater Permit,
MnDNR Public Waters, USACE Section 404, and SWPPP documents.
2.5. Deliverables
The Consultant shall provide the following deliverables:
* Final cost participation layouts in PDF electronic format
* Draft 60% and 90% Plans in 11"x17" PDF electronic format
* Signed final plans in 11"x17" PDF electronic format
* Signed final special provisions in 8.5" x 11" PDF and Word electronic format
* Final engineer's estimate in Microsoft Excel format
* Electronic design files in ORD format
* All supporting documentation required for State Aid submittals
2.6. Bidding and Construction Assistance Services
Bidding Services
The Consultant shall modify plan sheets and specifications to reflect changes addressed in addendums.
The County will be responsible to package and post addendums.
Shop Drawings
The Consultant shall be responsible to review, comment, and approve shop drawings submitted by the
Contractor during construction. The County should be included in this process.
Construction Support
The Consultant shall assist in answering any questions during construction by the county.
P age | 7

CSAH 13 Improvement Project
As-Built Drawings
Washington County will complete the post-construction survey necessary for as-built plan sets. The
Consultant shall modify the plan to incorporate any addendums, change orders, field adjustments, or
other deviations from the original bid plans. Record drawings for city utilities shall meet the city's as- built
requirements. As-Built Record Drawings shall be delivered in PDF and MicroStation/ORD format.
2.7. Additional Tasks
The Consultant is encouraged to include and describe any additional tasks not mentioned within the
RFP that will enhance the project.
3. Proposal Content
Consultants who cannot provide the full range of requested services may submit a proposal but must
clearly note any services listed in this request which would not be provided. Consultants are also
encouraged to highlight any services for which they possess particularly notable qualifications.
All work performed under the anticipated contract must be carried out in accordance with the procedures,
requirements, and regulations of MnDOT State Aid, Washington County, and other applicable agencies
including municipalities within Washington County.
Proposals will be limited to no more than five (5) pages in length, excluding a cover sheet, a cover letter,
and appendices. The font shall be no smaller than 11 point, 11x17 pages can be used for maps, exhibits,
and/or schedule and will count as a single page.
Appendices are anticipated to contain pre-prepared marketing materials and/or full resumes or
other supporting documents. Reviewers may or may not review material contained in
appendices.
At a minimum, submitted proposals shall include the following in no particular order:
3.1. Title Page/Cover Letter
Introduce the Consultant submitting the proposal, including the name, address, telephone number, and
email address of the contact person(s) representing the team and the names of any other firms or
individuals participating in the proposal.
3.2. Project Understanding & Approach
Demonstrate the responder's understanding of the project and description of the proposed project
approach to meet or exceed the project goals and objectives.
3.3. Key Personnel
Identify key personnel who will be assigned to the project; their area of responsibility, work experience,
qualifications, and availability to perform the proposed work. A project manager (PM) from the firm
must be identified with detailed educational experience and any other additional information to
demonstrate competence and the ability to fulfill the obligations of the Contract. The Consultant PM
must be available in a local office (Minneapolis/St. Paul metropolitan area) during the entire project
period. No change in personnel assigned to the project will be permitted without the written approval
of the County's PM.
P age | 8

CSAH 13 Improvement Project
3.4. Work Plan
A work plan, deliverables and schedule identifying the major tasks to be accomplished. The work plan
must present the responder's approach, task breakdown of the major project requirements, a critical
path timeline, approach to quality control, deliverable due dates, and project completion date. This
work plan will form the basis for cost negotiations after responder selection.
3.5. Qualifications and Experience
A detailed description of the responder's background and experience with preliminary and final design
including roadway, trail and traffic signals with an emphasis on county roads. Include examples of
similar work indicating the key personnel's level of involvement and whether the project was
completed on time and within budget.
3.6. Provide a signed Appendix A - County's Standard Terms and Conditions as the Consultant to whom the
contract is awarded shall be required to comply with the terms and conditions contained therein.
4. Proposal Submittal
All proposals, once submitted, become the property of the County. They will not be returned to the
Contractor. Submission of a proposal indicates acceptance by the Contractor of the conditions contained in
this RFP unless clearly and specifically noted in the proposal submitted and confirmed in the contract
between the County and the selected Contractor.
All proposals must include Proposal Content set forth in Section 3 and be sent electronically to the County
Authorized Representative.
Andrew Giesen, andrew.giesen@washingtoncountymn.gov
Contractors must submit to the e-mail address above no later than 3:00 PM CST on Friday November 6,
2026. Late submittals will not be considered.
5. Proposal Evaluation and Selection
The County will evaluate the information the Contractor provides in response to this RFP.
* Step one will consist of a review to determine which proposals comply with all mandatory
submission requirements. Non-compliant proposals will, subject to the express and implied rights of
the County, be disqualified and not evaluated further.
* Step two will consist of scoring each compliant response based on the evaluation criteria below.
P age | 9

Evaluation Criteria Points
Expressed understanding of the services and requirements of this RFP 10
Completeness, quality, and overall technical competence of the proposal, project approach, and methodology 20
The experience and qualifications of the project manager and team members and their work on similar projects 50
Work plan, schedule, and availability of personnel and other resources to perform the work within the specified project schedule 20
Total: 100

CSAH 13 Improvement Project
5.1. Evaluation Criteria
The criteria and assigned weight on which proposals will be evaluated are:
Evaluation Criteria Points
Expressed understanding of the services and requirements of this RFP 10
Completeness, quality, and overall technical competence of the proposal, 20
project approach, and methodology
The experience and qualifications of the project manager and team members and 50
their work on similar projects
Work plan, schedule, and availability of personnel and other resources to 20
perform the work within the specified project schedule
Total: 100
5.2. Final Selection
The Contractor with the highest evaluated score will be selected. Following notification of the selected
Contractor, the County reserves the right to negotiate project scope, pricing, and related terms to ensure
alignment with project needs and available resources.
5.3. Conditions of this RFP
* This RFP process does not obligate the County to award a contract or complete the services.
* The County reserves the right to waive any minor irregularities.
* The County reserves the right to reject any or all proposals.
* The County reserves the right to request additional information or clarifications from Contractors.
* The County reserves the right to interview any, all, or none of the Contractors.
* The County reserves the right to enter into a contract with more than one Contractor.
* If the RFP process concludes by withdrawal, cancellation or rejection of all proposals, the County
reserves the right to issue another RFP for this service.
* The County shall not be liable for any expenses incurred by the Contractor including but not limited
to expenses associated with the preparation and submission of the proposal.
* Proposals submitted become a matter of public record. All data collected, created, received,
maintained, or disseminated for any purposes by the activities of the Contractor because of this RFP
is governed by the Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13, as
amended, the Minnesota Rules implementing such Act now in force or as adopted, as well as
Federal Regulations on data privacy.
6. Proposal Questions
To notify the County of any inconsistency or ambiguity in this RFP and for all questions pertaining to this
RFP, all questions and notifications must be sent via e-mail by 3:00PM CST on Friday October 30, 2026 to
the County Authorized Representative.
Only written questions and notifications will receive responses. Washington County reserves the right to
disregard questions received after the deadline above.
P age | 10

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Project: IMACS Master Systems Integrator RFR Ref. #: Solicitation221 Department: Purchasing Type: RFP

Metropolitan Airports Commission (MAC)

Bid Due: 11/16/2026

DATE NOTICE Oct. 22, 2026 Request for proposals (PDF, 356KB) 2027 Social services

St. Louis Park city

Bid Due: 11/16/2026

Follow FMC Rochester- Install Above Ground Tanks Active Contract Opportunity Notice ID 15B41227Q00000001

JUSTICE, DEPARTMENT OF

Bid Due: 11/19/2026

division number title/general description issue date due date type Transit 26P031 NEW Green

Metropolitan Council

Bid Due: 11/24/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.