STL District, City of Arnold, realignment of Richardson Road and the addition of a dedicated left-turn lane

Location: Missouri
Posted: Nov 26, 2025
Due: Dec 3, 2025
Agency: Missouri Department of Transportation(MDOT)
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
Status Bid Advertisement Post Date Revision Date Letting Date
NEW STL District, City of Arnold, realignment of Richardson Road and the addition of a dedicated left-turn lane 11/4/25 12/3/25
Addendum 1 STL District, City of Arnold, realignment of Richardson Road and the addition of a dedicated left-turn lane Addendum 1 11/26/25 12/3/25

Attachment Preview

INVITATION TO BID – CITY OF ARNOLD, MISSOURI
ROADWAY IMPROVEMENT PROJECT
Notice to Contractors
Sealed bids for the Richardson Road At Old Lemay Ferry Improvement Project– CMAQ-5445(609), will
be received by the City Clerk, Arnold City Hall, 2101 Jeffco Blvd., Arnold, MO 63010, until 10:00 AM,
on December 3, 2025. At said time and promptly thereafter, the bids will be publicly opened and read aloud.
All bids shall be submitted in paper form.
The Scope of Work includes: The project includes the realignment of Richardson Road and the addition
of a dedicated left-turn lane. In conjunction with these roadway improvements, a new precast concrete
box culvert will be installed to replace the existing structure, the creek channel will be realigned, and a
grade control structure installed. Pavement striping, traffic control, and other items are also included, as
detailed in the Plans and Specifications.
Bid packages may be obtained from Drexel Technologies, 135A Weldon Parkway, Maryland Heights, MO
63043 / https://www.drexeltech.com / 314-872-0900. A non- refundable fee will be charged.
All bidder questions must be received by 5:00 p.m. on Wednesday November 26, 2025. Any questions received
after this time cannot be answered. Addenda will only be sent to plan holder and plan rooms.
All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing
hourly rate of wages of work of a similar character in this locality as established by the Department of
Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is higher.
A bid security in the amount of five percent (5%) of the bid amount must accompany each bid, in accordance
with the Bidders Checklist and Notice to Contractors.
The City of Arnold hereby notifies all bidders that it will affirmatively ensure that in any contract entered
into pursuant to this advertisement, businesses owned and controlled by socially and economically
disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and
will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national
origin in consideration for an award.
All bidders must be on MoDOT’s Qualified Contractor List per Section 102.2 of the Missouri Standard
Specifications for Highway Construction, 2024 Edition (https://www.modot.org/missouri-standard-
specifications-highway-construction) including all revisions. The contractor questionnaire must be on file 7
days prior to bid opening.
Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour
OSHA construction safety program, or similar program approved by the Department of Labor and Industrial
Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the
construction project.
The DBE goal for this project is 7%. There is no On the Job Trainee goal.
No 2nd tier subcontracting will be allowed on this project.
The City of Arnold reserves the right to reject any or all bids. The project will be awarded to the lowest,
responsive, responsible bidder.
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

US-56 Corridor Management Project (2026) - Baldwin City, KS 16-1308 StatusAccepting Bids Bid

Drexel Technologies

Bid Due: 9/30/2026

2026 Flood Buyout Program Professional Demolition/Land Clearance Services and Asbestos Abatement StatusAccepting Bids

Drexel Technologies

Bid Due: 10/02/2026

Western Transmission Main Phase 3C - St. Charles County, MO 22-007 StatusAccepting Bids

Drexel Technologies

Bid Due: 10/15/2026

*THIS IS A SUBCONTRACTING OPPORTUNITY* ETR/EXCELSIOR SPRINGS JOB CORPS 701 ST. LOUIS AVE.

Excelsior Springs Job Corps

Bid Due: 10/01/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.