Project Description: The proposed work for the project entitled "Project No. 31193, Stream Bank Stabilization - Tributary to Grays Creek" will include the furnishing of all material, labor, and equipment to Install rip rap and rock dykes to protect existing sanitary sewer mains.

With GovernmentContracts, you can:
...Tons 6" D50 Rock Rip Rap * 6,294 Lin Ft Fencing A pre-bid ...
Drexel Technologies
Bid Due: 6/30/2026
...Tons 6" D50 Rock Rip Rap * 6,294 Lin Ft Fencing A pre-bid ...
Drexel Technologies
Bid Due: 6/30/2026
...Tons 6" D50 Rock Rip Rap * 6,294 Lin Ft Fencing A pre-bid ...
Drexel Technologies
Bid Due: 6/30/2026
...2 rock blanket, storm sewer structures and piping, rip-rap slope protection, construction...