| Location: | Florida |
|---|---|
| Posted: | Jun 16, 2026 |
| Due: | Jun 25, 2026 |
| Agency: | |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W911YN26QA011 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
** update 01
KIT PEOAVN-B01-METRIC
some items that has been discontinued with replacements are below.
These or equivalent items IAW BAA are acceptable, manufacture non specific
pre-assembled in tool box foam optional
STP 1206MA: The replacement is STP 1206MBA
STP 712: The replacement is STP 712B
CHH 1098B: The replacement is CHH 41857
STP 2306: The replacement is STP 2306D
STP SF10T: The replacement is LIXIE 100H
QUA 312PB4X-ACR-KPR: The replacement is QUA 312PB4X-CR
QUA 312SB7X-KPR: The replacement is QUA 312SB7X
STP 4759G: The replacement is STP 4759
STP 4761G: The replacement is STP 4761
STP 4766G: The replacement is STP 4766
KAS ROW-BIT0810: The replacement is STP 1181-A
PEL 2400NVG: The replacement is STR 68344
Small Business Set-Aside: 100%
NAICS Code: 333517; Applicable Size Standard is 500
Product or Service Code (PSC): 5180
Brief description: This office has a requirement for six (6) metric General Mechanic Tool Kits (GMTK) to support the Army's fleet helicopters. The 6 Metric Tool Kits requested will have a sufficient amount of tools to allow mechanics to operate on multiple aircraft at the same time and in multiple locations. These kits also contain tools that will allow the mechanics to complete phase level maintenance for future operations, especially when there is high OPTEMPO during border missions.
See attached component list for a GMTK requirement. Foam shadowing is required for tool inventory purposes. Etching is not required.
The offered products must be in compliance with the Buy American Act.
Electronic submmison of quotes via Email to POCs below is authorized
Doug Divine: douglas.d.divine.civ@army.mil
Darrin Weaver: darrin.j.weaver.mil@army.mil
Matt Michael: matthew.j.michael2.civ@army.mil
| Jun 4, 2026 | [Combined Synopsis/Solicitation (Original)] Metric Tool Kits GMTK |

With GovernmentContracts, you can:
Follow Pond Water Timber Sale - Eglin AFB, FL Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 7/02/2026
Follow NASA Fire Services Contract (NFSC) II Active Contract Opportunity Notice ID 80KSC026R0003-SS
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Bid Due: 6/23/2026
Title: Roadway Resurfacing-Multiple Sites Opening Date: 7/22/2026 2:00:00 PM Announcement Info: Work under
Miami-Dade County
Bid Due: 7/22/2026
Description: DRINKING WATER, PURCHASE AND DELIVERY OF, TERM CONTRACT Department: Procurement Buyer: Kristen
Palm Beach County
Bid Due: 10/16/2030