| Location: | Utah |
|---|---|
| Posted: | Dec 22, 2025 |
| Due: | Jan 22, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SLCDA-DCM-542614 |
| Publication URL: | To access bid details, please log in. |
Project Description: Work associated with this project occurs in four (4) different facilities at the
Salt Lake International Airport:
1 – QTA Facility
Reconfiguration of the continuation of the jersey barriers and fencing to
define the drive aisles inside the QTA, reconfiguration of a storage room /
janitors closet into a restroom, break room and office, installation of a new
exit access stair from level 2 to level 1 and demolition of the east existing
stair and tower, retaining the elevator configuration.
2 – RSS Building A Fencing & Wall Reconfiguration
Removal of a chain link fence at the north parking area outside RSS Building
A, repair of the grade change at the removed fence and installation of an
interior wall inside the building.
3 – RSS Building B Door Reconfiguration
Installing a new doors in building B.
4 – RSS Building C Service Bay & Office Reconfiguration
Installing a demising wall to separate a vehicle service bay into two separate
service bays and reconfiguring a conference room into a restroom, break room and office.

With GovernmentContracts, you can:
...and women's restrooms, multiple showers, janitor closet, and utility room....
State Government of Utah
Bid Due: 6/09/2026