| Location: | Connecticut |
|---|---|
| Posted: | Jul 8, 2026 |
| Due: | Aug 7, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 37864 |
| Publication URL: | To access bid details, please log in. |
Central Connecticut Loop Trail (CCLT) Design
The Lower Connecticut River Valley Council of Governments (RiverCOG) is seeking a qualified consulting firm to begin design and engineering of the preferred alternative from the Central Connecticut Loop Trail (CCLT) Study. The Study, completed in 2025, is a trail feasibility study to link the Farmington Canal Heritage Trail (FCHT) with the Air Line Trail (ALT). The roughly 23-mile route is a critical gap within the CCLT, a vision for a 111-mile loop trail running through 22 cities and towns in the center of Connecticut. View RFQ at https://www.rivercog.org/publicnotices
Vicki Harris RiverCOG 145 Dennison Rd. Essex CT, 06426 United States Tel: 8605818554 Fax: vharris@rivercog.org

With GovernmentContracts, you can:
..., the scope generally includes: 1. A sanitary feasibility study for the properties ...
Town of Montville
Bid Due: 10/15/2026