| Location: | South Carolina |
|---|---|
| Posted: | Apr 15, 2025 |
| Due: | May 15, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | GWC-249 |
| Publication URL: | To access bid details, please log in. |
The project includes the installation of approximately 2,500 linear feet of 12-inch Ductile
Iron Pipe to connect the existing GW System to the Town of Pelzer (Pelzer). Installation
method of the water main is primarily via Horizontal Directional Drill at two locations
crossing the Saluda River. Additional project scope includes the demolition of the Pelzer
Elevated Storage Tank (EST) following the completion of one of the HDD crossings.

With GovernmentContracts, you can:
...Project: Design/Build Services for Bees Ferry Animal Services Emergency Procurement Ref. #: RFP... ...
Charleston County
Bid Due: 11/24/2026
...Project Delivery Method: Design-Bid-Build Construction Cost Range: $150,000.00 - $250,000.00 Agency... is a ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 12/04/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: $225,000 TO $275,000 Prime Contractor License... (Special ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 12/03/2026
...Location: Hardeeville, SC - Jasper County Anticipated Project Delivery Method: Design-Bid-Build Agency... the ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 1/05/2027