| Location: | South Carolina |
|---|---|
| Posted: | Apr 15, 2025 |
| Due: | May 15, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | GWC-249 |
| Publication URL: | To access bid details, please log in. |
The project includes the installation of approximately 2,500 linear feet of 12-inch Ductile
Iron Pipe to connect the existing GW System to the Town of Pelzer (Pelzer). Installation
method of the water main is primarily via Horizontal Directional Drill at two locations
crossing the Saluda River. Additional project scope includes the demolition of the Pelzer
Elevated Storage Tank (EST) following the completion of one of the HDD crossings.

With GovernmentContracts, you can:
...: manager@e2ofsc.com Telephone: 843-374-8030 Description: Installation of SCADA components necessary... to incorporate new ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/25/2026
...Telephone: n/a Description: The Project includes Installation of six (6) grinder pump stations... ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/10/2026
...and installation of a water service line and septic tank system, and construction ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/09/2026