The project includes the installation of approximately 2,500 linear feet of 12-inch Ductile
Iron Pipe to connect the existing GW System to the Town of Pelzer (Pelzer). Installation
method of the water main is primarily via Horizontal Directional Drill at two locations
crossing the Saluda River. Additional project scope includes the demolition of the Pelzer
Elevated Storage Tank (EST) following the completion of one of the HDD crossings.

With GovernmentContracts, you can:
...Fuel Storage and Overflow), Clean and Inspect WORK ITEM 8: Tanks (Aviation Fuel ...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 9/28/2026
...water storage tank. Pre-Bid Information: Questions about this RFQ shall be submitted via ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/01/2026