H212--Fire Extinguisher/Hood Maintenance Illiana VA Healthcare System in Danville, IL

Location: Federal
Posted: Oct 8, 2025
Due: Oct 14, 2025
Agency: VETERANS AFFAIRS, DEPARTMENT OF
Type of Government: Federal
Category:
  • H - Quality Control, Testing, and Inspection Services
Solicitation No: 36C25225Q0673
Publication URL: To access bid details, please log in.
Follow
H212--Fire Extinguisher/Hood Maintenance Illiana VA Healthcare System in Danville, IL
Active
Contract Opportunity
Notice ID
36C25225Q0673
Related Notice
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
252-NETWORK CONTRACT OFFICE 12 (36C252)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Oct 08, 2025 01:02 pm CDT
  • Original Published Date: Sep 29, 2025 02:30 pm CDT
  • Updated Date Offers Due: Oct 14, 2025 09:00 am CDT
  • Original Date Offers Due: Sep 30, 2025 10:00 am CDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Nov 13, 2025
  • Original Inactive Date: Oct 15, 2025
  • Initiative:
    • None
Classification View Changes
  • Original Set Aside:
  • Product Service Code: H212 - EQUIPMENT AND MATERIALS TESTING- FIRE CONTROL EQUIPMENT
  • NAICS Code:
    • 561210 - Facilities Support Services
  • Place of Performance:
Description View Changes
VENDOR QUESTIONS AND ANSWERS

For all of the commercial kitchen hood fire systems, is it required that the employees be manufacturer certified to perform maintenance on them? Yes
Some of the commercial kitchen hood fire system manufacturers require nozzle caps to be replaced annually per their UL Listed manual. Does this proposal need to include the annual nozzle cap replacement as a separate line item? No, line items for semi-annual fixed suppression system maintenance should incorporate the price of a single annual nozzle replacement, when required by the manufacturer, to be completed in February of each year.
The fire system cartridges for the systems present need replaced once every 12 years, or only if low on pressure depending on the manufacturer. They are not routinely replaced every inspection / maintenance. (Item # 0007). Would the cartridges still need to be included in the price to be replaced every 6 months? No, the cartridges can be replaced as per manufactures specifications and priced into the line items for 12 year inspections accordingly.
Are swap extinguishers allowed instead of loaners for fire extinguishers as long as they are the same type and size? Yes
For item 0008 it lists Tag/Seal only. Is that the annual maintenance of the fire extinguisher including the tag and seal? Not just the price for the Tag/Seal? The items identified for annual maintenance should be priced to include tag/seal. The separate line item for tag/seal refers to the annual requirement that all other (not inspected during that fiscal year) extinguishers receive new tag/seal.
During the site visit I noticed some deficiencies with several of the systems that need addressed. Any additional repair or compliance work that is needed after the first inspections would need to be quoted and is not intended to be included in the submitted pricing in this solicitation? Correct- any deficiencies noted during the first cycle of inspections that are not part of routine annual maintenance would need to be addressed by separate agreement.
Item 4004 lists 10LB K (12 year/hydro), is that a typo that meant to say (5 year/hydro)? I assume this means a 6 Liter K-Class fire extinguisher, and they are due for hydrotests every 5 years. Yes, should read 5 year/hydro. Line Item has been corrected.
Are all hydrotesting and 6 year prices supposed to include the annual maintenance cost also? Yes
Can you please confirm the total number of fire extinguishers included in the contract? The Attachment A spreadsheet 2025 Inventory states there are 350 fire extinguishers, which includes spares, however the scope of work document states there are 390 under paragraph 1 of the general requirements. Total number of extinguishers is 350 including those in use and spares. Statement of Work has been corrected.
The Price/Cost Schedule for the tag/seal line item has a different quantity each year. Shouldn t this line item reflect the same total as the referenced quantity of fire extinguishers (350 or 390 depending on answer to above RFI)? Can you please revise the Price/Cost Schedule to reflect the correct quantity of tags and seals? Yes, all 350 extinguishers will need tags+seals each year. Tags/seals for identified extinguishers should be included in the individual line item price. All other extinguishers not specifically identified require tags+seals. Price/Cost Schedule has been corrected to identify a total of 350 for each year (individually identified for inspection + tags/seals only).
There doesn t appear to be a separate line item in the Price/Cost Schedule for the annual inspection of the fire extinguishers. It appears the only line item that would be logical to include this price would be the tag/seal line item. Can you confirm pricing for the annual inspection is to be part of the tag/seal line item? Otherwise will a specific line item be included for the annual inspection service? Annual inspection should be priced for all 350 extinguishers, either specifically identified as a unique line item or in the tag/seal category, which now total 350 each year.
If there are discrepancies between the Attachment A inventory of how many 5-year/6-year/12-year maintenance services are required and the quantities in the Price/Cost Schedule for each year, which quantity should we use for pricing purposes? If there is a discrepancy in the inventory, the vendor may use some of my spare inventory to swap extinguishers that need 5/6/12 year maintenance and not perform maintenance on items if not covered under the contract.
And will it be acceptable to revise the quantities specified in the Price/Cost Schedule if Attachment A is determined to have the correct quantity? Yes, by contract modification in coordination with the Contracting Officer.
What are the period of performance expectations for the base year? The Price/Cost Schedule states for base year the POP begins at contract award. Base year work needs completed in October 2025. Â It also states that annual inspections and maintenance is due in October every year. This is correct. With quotations due October 10, plus some time for the government to make an award decision, is there flexibility for the Base year inspections/maintenance to occur in November? The Joint Commission does provide a 30 day grace period for annual inspections, so we believe this would be acceptable but would like to confirm as that may impact base year pricing. Â The periods of performance are as identified in the Statement of Work, including the base year date of award. It is correct that Joint Commission has a +30-day allowance for annual maintenance on extinguishers. OSHA does not. Vendor should be prepared to perform base year maintenance identified as required in October in October 2025.
Attachments/Links
Contact Information
Contracting Office Address
  • GREAT LAKES ACQUISITION CENTER 115 S 84TH ST
  • MILWAUKEE , WI 53214
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Sep 29, 2025[Solicitation (Updated)] H212--Fire Extinguisher/Hood Maintenance Illiana VA Healthcare System in Danville, IL
Sep 29, 2025[Presolicitation (Original)] H212--Fire Extinguisher/Hood Maintenance Illiana VA Healthcare System in Danville, IL
Oct 29, 2025[Award Notice (Original)] H212--Fire Suppression System Maintenance VA Illiana Healthcare System at Danville, IL
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Y--VOYA 335009 N191 REHAB RAINY AND ASH Active Contract Opportunity Notice ID

INTERIOR, DEPARTMENT OF THE

Bid Due: 6/09/2026

Follow 20--CYLINDER,DUPLEX Active Contract Opportunity Notice ID N0010426QYA76 Related Notice Department/Ind. Agency DEPT

DEPT OF DEFENSE

Bid Due: 7/31/2026

Follow F--Snake River Area Office Weed Control Active Contract Opportunity Notice ID 140R1726Q0025

INTERIOR, DEPARTMENT OF THE

Bid Due: 6/12/2026

Follow Z1DA--646-21-101 UD SPS AHU & RO Upgrade (VA-26-00036217) Active Contract Opportunity Notice

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 6/11/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.