| Location: | South Carolina |
|---|---|
| Posted: | Feb 25, 2025 |
| Due: | Mar 27, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | H39-9531 50003670-2 |
| Publication URL: | To access bid details, please log in. |
Remove air handling unit and existing hot and chilled water piping, and installation of roof top package heat pump, to include electrical connections, new ceiling diffusers, ceiling systems, gypsum wall patching, floor patching, structural support and roofing. Small and Minority Business participation is highly encouraged.

With GovernmentContracts, you can:
...Honea Path SC 29654 Project Delivery Method: Design-Bid-Build Construction Cost Range: $500K - ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/22/2026
...as specified herein. Installation will be done by others. 1. BASIS OF DESIGN ...
Clemson University
Bid Due: 9/29/2026
...) Project Delivery Method: Design-Bid-Build Construction Cost Range: $800,000 to $900,000 Prime..., Installation ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/29/2026
...24, 2026 - 2:00pm Project Location: Dunnemann Apts Project Delivery Method: Design-Bid-Build... Description: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/24/2026