| Location: | South Carolina |
|---|---|
| Posted: | Feb 25, 2025 |
| Due: | Mar 20, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-CMG-B-007 |
| Publication URL: | To access bid details, please log in. |
This Scope of Work includes,but is not limited to; masonry, brick walls, slabs, roof, Install power, IT, controls, fire alarm with HVAC system and plumbing installation. Including floor wall and ceiling finishes and equipment as per plans. Area 1 is the field house addition and hardscape. Area 2 is the replacement and installation of the new Press box along with required hardscape. PRE-BID 3/5/25 at 10 AM - onsite at 5117 Baptist Hill Rd. Hollywood, SC 29449.

With GovernmentContracts, you can:
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Jamie Caggiano Email... Conference ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/30/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: $475,000 to $575,000 Prime Contractor... to fully ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/19/2026
...systems, including HVAC, electrical, plumbing, life safety, and IT infrastructure. Project Details... systems, ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/05/2026
..., Ruffin, SC 29475 Project Delivery Method: Design-Bid-Build Construction Cost Range: $135,000-$160,000... that ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/14/2026