| Location: | North Dakota |
|---|---|
| Posted: | Jan 31, 2025 |
| Due: | Feb 21, 2025 |
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | QSE--36C78625Q50125 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
940 | Fargo National Cemetery | Grounds Maintenance and Interment Operations | Bridge -- S208
This request is for a short term IDIQ bridge contract for burial and GMC at Fargo (940) until a base plus 4 year contract is awarded. Planned POP is from 03/03/25 - 08/31/2025.
The Contractor shall provide all personnel, equipment, tools, supervision, and other items and services necessary to ensure that interment operations are performed at the Cemetery in a manner that shall maintain proper decorum and respect; and grounds maintenance operations are performed at the Cemetery in a manner that shall maintain healthy grass, trees, shrubs, and plants; and present a groomed, clean, neat, and professional appearance. Services include, but are not limited to maintenance of grounds, regular mowing, weed eating, blade edging, trimming, removal of leaves and debris, as well as, sweeping or blowing off roads and sidewalks, irrigation system maintenance and operation, maintenance of gravesites and headstones, the raising and realignment of headstones, washing headstones, initial and replacement headstone installation and maintenance, turf maintenance, mulched planting bed maintenance, plant and tree maintenance, sunken grave repair, transporting casketed and cremated remains from the committal service area to the gravesite, interments of casketed and cremated remains, disinterment’s, grave excavation and backfilling, trash removal, snow and ice removal, placement and removal of flags. The Contractor may be required to be on-site Memorial Day weekend and other special days as requested by the CO. No materials, tools (to include casket cart and lowering device), vehicles, sod, staging area or rest room facilities to include temporary port-o-lets will be provided by the National Cemetery Administration and Fort Snelling. It is the contractor’s responsibility to supply all within NCA Standards.
| Feb 6, 2025 | [Combined Synopsis/Solicitation (Updated)] 940 | Fargo National Cemetery | Grounds Maintenance and Interment Operations | Bridge -- S208 |
| Feb 12, 2025 | [Combined Synopsis/Solicitation (Updated)] 940 | Fargo National Cemetery | Grounds Maintenance and Interment Operations | Bridge -- S208 |

With GovernmentContracts, you can:
Follow Flooring IDR Sources Sought Active Contract Opportunity Notice ID JFSD260019 Related Notice
DEPT OF DEFENSE
Bid Due: 6/05/2026
Follow LMTV / MTV Hardtops Active Contract Opportunity Notice ID W901UZ26Q1126 Related Notice
DEPT OF DEFENSE
Bid Due: 6/12/2026
Follow EGYN211002 Repair Electrical Transformers B820 B830 (A/E) & EGYN261004 Repair Wastewater Pond
DEPT OF DEFENSE
Bid Due: 6/18/2026
Follow GSA Fleet Lease Vehicle Auction & Marshalling Services - Bismark, ND Active
GENERAL SERVICES ADMINISTRATION
Bid Due: 12/01/2026