| Location: | North Carolina |
|---|---|
| Posted: | May 9, 2025 |
| Due: | May 27, 2025 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 299-299-297-1 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 299-299-297-1 |
| Project Title: | ITB: Utility Operations Center Parking Lot Repair |
| Description: | Brunswick County is soliciting bids for the milling and resurfacing of selected sections of the Brunswick County Utility Operations Center (“UOC”) parking lot, located at 250 Grey Water Road NE, Supply, NC 28462. The project is expected to cover approximately 60,512 square feet. The work will include milling the existing pavement in designated areas, filling them with two (2) inches of asphalt, and completing full-depth patching and repairs over approximately 300 square feet. Additionally, the project will require striping and pavement markings, including 4-inch white latex painted stripes and five (5) directional arrows. Traffic control measures must be implemented to ensure partial access to the parking lot remains available during work hours. |
| Opening Date: | 5/27/2025 3:00 PM |
| Posted Date: | 5/9/2025 |
| Status: | Open |
| Department: | COUNTY OF BRUNSWICK |
|
Solicitation Number
*
299-299-297-1
|
Department
COUNTY OF BRUNSWICK
|
Status Reason
Open
|
|
|
Opening Date
2025-05-27T15:00:00.0000000
|
Posted Date
*
2025-05-09T13:17:31.0000000Z
|
Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
||
|
Description
Brunswick County is soliciting bids for the milling and resurfacing of selected sections of the Brunswick County Utility Operations Center (“UOC”) parking lot, located at 250 Grey Water Road NE, Supply, NC 28462. The project is expected to cover approximately 60,512 square feet. The work will include milling the existing pavement in designated areas, filling them with two (2) inches of asphalt, and completing full-depth patching and repairs over approximately 300 square feet. Additionally, the project will require striping and pavement markings, including 4-inch white latex painted stripes and five (5) directional arrows. Traffic control measures must be implemented to ensure partial access to the parking lot remains available during work hours.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
.... Additionally, MARFORSOC requires Joint Interface Control Officer (JICO) support to assist the ...
DEPT OF DEFENSE
Bid Due: 7/13/2026
...requires no additional wayside or roadside infrastructure and allows railroads to maintain strict ...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 6/29/2026
...Control and Prevention (CDC), Assistance Listing Number (ALN) 93.967, which focuses on improving... ...
Wake County
Bid Due: 6/30/2026
..., evaluation, scope of work preparation, lead and asbestos controls or abatement, subcontracting ...
City of Charlotte
Bid Due: 7/16/2026