| Location: | Massachusetts |
|---|---|
| Posted: | Jul 8, 2026 |
| Due: | Jul 23, 2026 |
| Agency: | Commonwealth of Massachusetts |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | BD-26-1677-TOW26-TOW26-131162 |
| Publication URL: | To access bid details, please log in. |
| Header Information | |||||
| Bid Number: |
BD-26-1677-TOW26-TOW26-131162 |
Description: |
Prequalification for General Contractors and Subcontractors for New Raynham Public Safety Building |
Bid Opening Date: |
07/23/2026 12:00:00 PM |
| Purchaser: |
GREGORY BARNES |
Organization: |
Town of Raynham |
||
| Department: |
TOW26 - Selectmen |
Location: |
TOW26 - Town Hall |
||
| Fiscal Year: |
26 |
Type Code: |
SS |
Allow Electronic Quote: |
No |
| Alternate Id: |
|
Required Date: |
Available Date
: |
07/08/2026 12:00:00 PM | |
| Info Contact: | Bid Type: |
OPEN |
Informal Bid Flag: |
No |
|
| Purchase Method: |
Open Market |
||||
|
|||||
| Ship-to Address: |
Gregory Barnes 558 South Main St Raynham, MA 02767 US Email: gbarnes@Town.raynham.ma.us Phone: (508) 824-2707 |
Bill-to Address: |
Gregory Barnes 558 South Main St Raynham, MA 02767 US Email: gbarnes@Town.raynham.ma.us Phone: (508) 824-2707 |
Print Format: |
Bid Print |
| Required Quote Attachments | |||||
|
|

With GovernmentContracts, you can:
...of an existing Oil-lubricated baseplate fire protection compressor and an existing dry pipe ...
Commonwealth of Massachusetts
Bid Due: 10/01/2026
...protection bypass pumping system, the removal and replacement of the existing fire pump ...
City of Fitchburg
Bid Due: 10/14/2026
...ductwork, equipment, and controls (Filed Sub-Bid). 6. New and temporary fire protection piping... ...
Massachusetts Convention Center Authority
Bid Due: 10/07/2026
...ductwork, equipment, and controls (Filed Sub-Bid). 6. New and temporary fire protection piping... ...
Massachusetts Convention Center Authority
Bid Due: 10/07/2026