| Location: | California |
|---|---|
| Posted: | Jan 15, 2026 |
| Due: | Jan 21, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912P726RA004 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
15 Jan 2026 Update: Submission method changed to DOD Safe. See revised synopsis for details.
*****************************************************
13 Jan 2026 Update: provide RFI response and update synopsis language
*****************************************************
This contract is being procured in accordance with 40 United States Code, Chapter 11, Selection of Architects and Engineers statute (herein referred to as the Brooks Act) as implemented in FAR Subpart 36.6. The services will consist of design services for Pajaro River Reaches 2 and 3 Levee and Floodwall including support during solicitation and engineering during construction. North American Industry Classification System code (NAICS) is 541330, which has a size standard of $25.5 million in average annual receipts. This is set-aside for small business only. The Government intends to issue one Firm-Fixed Price (FFP) contract as a result of this notice. Questions regarding this announcement must be in writing and shall be addressed to Mary Fronck (mary.fronck@usace.army.mil) via email. All questions must be submitted no later than 07 January 2026 at 12:00pm PST to allow adequate time to respond. This is a request for A-E Qualification. Solicitation packages are not provided, and no additional project information will be given to firms during the announcement period. This is not a request for proposal. See attached synopsis for details.
| Dec 23, 2025 | [Presolicitation (Updated)] Pajaro River Reaches 2 and 3 Levee and Floodwall Design |
| Jan 13, 2026 | [Presolicitation (Updated)] Pajaro River Reaches 2 and 3 Levee and Floodwall Design |

With GovernmentContracts, you can:
Follow Tactical Data Links Studio Software License for Edwards AFB Active Contract Opportunity
DEPT OF DEFENSE
Bid Due: 6/12/2026
Follow Z--Rehab Power and Cooling Systems, Pinnalces NP Active Contract Opportunity Notice ID
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/19/2026
Follow Lake Sonoma Sewage Pumping Vault and Portable Restroom Rental Services Active Contract
DEPT OF DEFENSE
Bid Due: 6/29/2026
Follow IFB 33-6026 Metallic and Non-Metallic Scrap Sale, Pendleton, CA Active Contract Opportunity
DEPT OF DEFENSE
Bid Due: 6/22/2026