| Location: | Georgia |
|---|---|
| Posted: | Oct 30, 2025 |
| Due: | Dec 3, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66751-NONST-2026-000000072 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66751-NONST-2026-000000072 | SB011-26 Longleaf Greenfield Reconduct Project | Lawrenceville, City Of |
Oct 30, 2025 @ 04:53 PM
|
Dec 03, 2025 @ 02:00 PM
|
Start Date: Oct 30, 2025 @ 04:53 PM ET
End Date:
Dec 03, 2025 @ 02:00 PM ET
Consist of but not limited to:
This work will consist of installing two new separate single phase underground loops through two existing neighborhoods. The current primary cable feeds through the back yards of one development and in front of the
other development, with many secondary cables going from the transformers in the back yards to the meter bases on the back of the townhomes. This full reconduct will be installing new primary and transformers on the roadside of the buildings and running 350 triplex behind the buildings to UV-4 pedestals and capturing the old
services. All conductors are to be installed in conduit or pipe. Work will consist of installing approximately 3150¿ of 1/0 underground primary, inside 2¿ conduit. There will
be (11) new pad mount transformers (25kva-100kva) installed with concrete pads and grounding assemblies and (2) old transformers (25kva-75kva) that will stay in place with grounding assemblies added. There will be (26) primary terminations, inside the pad mount transformers. Approximately 950¿ linear feet of 350 underground triplex will be run in 3¿ conduit, from the transformer locations to the (9) new UV-4 pedestals in the back yards. The UV-4 pedestals will be installed with grounding assemblies per Lawrenceville Power¿s Specs. There are also (7) existing light poles in the development that will consist of running 360¿ linear feet of # 6 duplex in 2¿ conduit to provide new feeds for these lights. Each of these lights will need a UV-2 hand hole box installed according to Lawrenceville Power¿s Specifications. There will also be (3) Town and Country lights installed at
3 transformer locations, with (20¿) direct bury poles. There will be (4) UM2 (Riser poles), one at each entrance that will need to be terminated, ran up the pole, and have u-guard installed to Lawrenceville Power¿s spec.
The contractor will be responsible for all switching procedures throughout the entire project, including the
energizing of the new riser poles.
| Code | Description |
| 91341 | Construction, Power Lines, Including Installation, Maintenance and Repair Services |
Chris Duncan
chris.duncan@lawrencevillega.org
6784076421

With GovernmentContracts, you can:
...RFP 26-009 Pipe Rehabilitation, Pipe Lining Sugar Hill, City Of May 14, 2026 ...
State Government of Georgia
Bid Due: 6/18/2026
...reinforced concrete pipe (RCP), installation of a new standard headwall with stone veneer, ...
City of Sandy Springs
Bid Due: 7/07/2026
..., Albany, Georgia 31701, until 2:30 p.m. on June 10, 2026, for all ...
State Government of Georgia
Bid Due: 6/10/2026
...System, Plants, Main and Service Line 91338 Construction, Chilled Water Pipe Installation 91341..., ...
State Government of Georgia
Bid Due: 6/29/2026